Jljkj Rate Analysis
Sl. Rate Total
Code Description Coeff.
No (Nu.) (Nu.)
Excavation in foundation trenches or drains not
exceeding 1.5m in width or area 10 sq.m on plan,
and depth > 300 mm including dressing &
1 EW0109
ramming, disposal of surplus soil within 50m
lead & 1.5m lift. Hard rock requiring chiselling
(where blasting is prohibited)Extra
LB0032 Blacksmith (metal-worker) 0.044 309.82 13.63
LB0051 Mason Gd.2 0.265 275.64 73.04
LB0077 Labour 3.3163 232.93 772.47
Total 859.14
Tools and Plants (1%) 8.59
Contractors Profit (10%) 85.91
Total Rate per m3 953.65

hug In pursuit of preparing tomorrow's technologists


Hggh
Hhjhj
Jljkj Rate Analysis
Sl. Rate Total
Code Description Coeff.
No (Nu.) (Nu.)
Open timbering over areas including lagging &
2 EW0206 strutting of trenches, cuts (per sq.m face area
timbered)- 1.5m < depth < 3 m
LB0033 Carpenter Gd.2 0.0069 309.82 2.14
LB0077 Labour 0.0136 232.93 3.17
MT0325 Ballies 75 to 125mm dia 0.2833 30.43 8.62
Rough-sawn timber (urban rate) - Class 'B' (Mixed
MT0330 0.0087 10826.4
Conifer) 94.19
Total 108.12
Tools and Plants (1%) 1.08
Contractors Profit (10%) 10.81
Total Rate per m2 120.01

hug In pursuit of preparing tomorrow's technologists


Hggh
Hhjhj
Jljkj Rate Analysis
Sl. Rate Total
Code Description Coeff.
No (Nu.) (Nu.)
Providing and laying 50mm thick Plinth Protection and grouted with fine
sand mix including well rammed, finishing the top smooth- With cement
4 DR0003
concrete 1:3:6, 20mm aggregate, laid over 75mm thick layer of compacted
dry brick aggregate (40mm)
LB0036 Mason Gd.1 0.00319 309.82 0.99
LB0039 Work Supervisor (Lajab) 0.00255 309.82 0.79
LB0051 Mason Gd.2 0.03719 275.64 10.25
LB0053 Plant Operator Gd.3 0.00357 275.64 0.98
LB0077 Labour 0.41674 232.93 97.07
MP0111 Concrete Mixer(7/5 cu.ft) 0.00350 1832 6.41
MP0112 Concrete Vibrator(M/C5) 0.00350 1136 3.98
MT0043 Sand 0.08350 473.33 39.52
MT0070 Crushed Rock - 20mm 0.006 967.2 5.80
MT0081 Gravels 20mm-10mm 0.0470 551.57 25.92
MT0145 Cement (OPC / PSC) 0.0110 5939 65.33
Total 257.04
Tools and Plants (1%) 2.57
Contractors Profit (10%) 25.70
Total Rate per m 2 285.31

hug In pursuit of preparing tomorrow's technologists


Hggh
Hhjhj
Jljkj Rate Analysis
Sl. Rate
Code Description Coeff. Total (Nu.)
No (Nu.)
Constructing second class brick masonry open surface drain in cement
mortar 1:4 including earth work in excavation 100 mm thick concrete bed
1:5:10, 40mm aggregate and x 450mm depth including 12mm cement
5 DR0013
plastering 1:4 with a floating coat of neat cement and disposal of surplus
earth etc. complete - 300mm25mm thick cement concrete 1:2:4, 12 mm
aggregate for filling haunches
LB0036 Mason Gd.1 0.18437 309.82 57.12
LB0039 Work Supervisor (Lajab) 0.0035 309.82 1.08
LB0051 Mason Gd.2 0.09257 275.64 25.52
LB0053 Plant Operator Gd.3 0.0049 275.64 1.35
LB0077 Labour 0.71695 232.93 167.00
MP0111 Concrete Mixer(7/5 cu.ft) 0.0049 1832 8.98
MP0112 Concrete Vibrator(M/C5) 0.0049 1136 5.57
MT0043 Sand 0.07022 473.33 33.24
MT0068 Crushed Rock - 40mm 0.04005 872.92 34.96
MT0071 Crushed Rock - 12.5 - 6mm 0.02225 963.02 21.43
MT0125 Bricks 2nd class 0.0468 9666.67 452.40
MT0145 Cement (OPC / PSC) 0.0274 5939 162.73
Total 971.38
Tools and Plants (1%) 9.71
Contractors Profit (10%) 97.14
Total Rate per m 1078.23
hug In pursuit of preparing tomorrow's technologists
Hggh
Hhjhj
Jljkj Rate Analysis
Sl. Rate
Code Description Coeff. Total (Nu.)
No (Nu.)
Providing and laying in position plain cement concrete 1:1.5:3 (1 cement : 1.5
6 CW0002 sand : 3 graded crushed rock 20 mm nominal size) excluding the cost of
centering and shuttering - All work upto plinth level.

LB0036 Mason Gd.1 0.0625 309.82 19.36


LB0039 Work Supervisor (Lajab) 0.05 309.82 15.49
LB0051 Mason Gd.2 0.0625 275.64 17.23
LB0053 Plant Operator Gd.3 0.07 275.64 19.29
LB0077 Labour 1.575 232.93 366.86
MP0111 Concrete Mixer(7/5 cu.ft) 0.07 1832 128.24
MP0112 Concrete Vibrator(M/C5) 0.07 1136 79.52
MT0043 Sand 0.441 473.33 208.74
MT0070 Crushed Rock - 20 mm 0.6615 967.2 639.80
MT0071 Crushed Rock - 12.5 mm - 6 mm 0.2205 963.02 212.34
MT0145 Cement (OPC / PSC) 0.403 5939 2393.42
Total 4100.29
Tools and Plants (1%) 41.00
Contractors Profit (10%) 410.03
Total Rate per m3 4551.32
hug In pursuit of preparing tomorrow's technologists
Hggh
Hhjhj
Jljkj Rate Analysis
Sl. Rate Total
Code Description Coeff.
No (Nu.) (Nu.)
Bhutan type Traditional Cornices in R.C.C 1:2:4, 20 mm aggregate including cost of formwork including
finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3 (1 cement : 3 sand) ,
7 RC0041 excluding reinforcement & decorative painting cost as per standard design (Measurement to be taken
along the cornice and wall junction) - Multi-Storeyed building..at floor 2 level and at other floors where
lhanglag is provided including the cost of lhanglag
LB0021 Carpenter Gd.1 0.75 350.47 262.85
LB0033 Carpenter Gd.2 0.40018 309.82 123.98
LB0036 Mason Gd.1 0.52867 309.82 163.79
LB0039 Work Supervisor (Lajab) 0.25358 309.82 78.56
LB0051 Mason Gd.2 0.27867 275.64 76.81
LB0053 Plant Operator Gd.3 0.00251 275.64 0.69
LB0077 Labour 2.10654 232.93 490.68
MP0111 Concrete Mixer(7/5 cu.ft) 0.00251 1832 47.27
MP0112 Concrete Vibrator(M/C5) 0.00251 1136 2.85
MT0043 Sand 0.02048 337.03 6.90
MT0070 Crushed Rock - 20 mm 0.03186 967.2 30.81
MT0145 Cement (OPC / PSC) 0.01367 5939 81.19
MT0325 Ballies 75 to 125mm dia. 0.4459 30.43 13.57
MT0330 Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer) 0.00706 10826.4 76.43
Total 1456.36
Tools and Plants (1%) 14.56
Contractors Profit (10%) 145.64
Total Rate per m 1616.56
hug In pursuit of preparing tomorrow's technologists
Hggh
Hhjhj
Jljkj Rate Analysis
Sl. Rate Total
Code Description Coeff.
No (Nu.) (Nu.)
Providing & fixing, Thermo Mechanically Treated (TMT) bars
8 RC0083 for R.C.C work including cutting, bending, binding and placing
in position complete
LB0032 Blacksmith (metal-worker) 0.01376 309.82 4.26
LB0077 Labour 0.01376 232.93 3.21
Reinforcing Bars & Mesh - Thermo Mechanically Treated Bars
MT0208 1.05 43.41 45.58
(TMT bars)
Total 53.05

Tool and Plants (1%) 0.53


Contractors Profit (10%) 5.31
Total Rate per kg 58.89

hug In pursuit of preparing tomorrow's technologists


Hggh
Hhjhj
Jljkj Rate Analysis
Sl. Total
Code Description Coeff. Rate (Nu.)
No (Nu.)
Providing & fixing centering and shuttering (formwork),
9 RC0090 including strutting, propping etc. and removal of
formwork -Foundation and plinth etc.
LB0033 Carpenter Gd.2 0.156 309.82 48.33
LB0077 Labour 0.156 232.93 36.34
MT0325 Ballies 75 to 125mm dia 0.42 30.43 12.78
Rough-sawn timber (urban rate) - Class 'B' (Mixed
MT0330 0.0135 10826.4 146.16
Conifer)
Total 243.61
Tool and Plants (1%) 2.44
Contractors Profit (10%) 24.36
Total Rate per m2 270.41

hug In pursuit of preparing tomorrow's technologists


Hggh
Hhjhj
Jljkj Rate Analysis
Sl. Rate Total
Code Description Coeff.
No (Nu.) (Nu.)
P&L Second-Class Brick work in Foundation & Plinth - in cement
10 BW0001
mortar 1:3
LB0036 Mason Gd.1 0.339 309.82 105.03
LB0051 Mason Gd.2 0.339 275.64 93.44
LB0077 Labour 1.87025 232.93 435.64
MT0043 Sand 0.2675 473.33 126.62
MT0125 Bricks 2nd class 0.407 9666.65 3934.33
MT0145 Cement (OPC / PSC) 0.1275 5939 757.22
Total 5452.28
Tool and Plants (1%) 54.52
Contractors Profit (10%) 545.23
Total Rate per m3 6052.03

hug In pursuit of preparing tomorrow's technologists


Hggh
Hhjhj
Jljkj Rate Analysis
Sl. Rate Total
Code Description Coeff.
No (Nu.) (Nu.)
Providing &laying Coursed Rubble Masonry with hard
SM0025 stone hammer-dressed in foundation & plinth - In cement
mortar 1:3
LB0051 Mason Gd.2 2.2 275.64 606.41
LB0077 Labour 2.8865 232.93 672.35
MT0043 Sand 0.321 473.33 151.93
MT0060 Boulder 1.1 861.81 947.99
MT0145 Cement (OPC / PSC) 0.153 5939 908.67
Total 3287.35
Tool and Plants (1%) 32.87
Contractors Profit (10%) 328.74
Total Rate per m3 3648.96