Jljkj ROAD EARTHWORK ESTIMATE
Determine the qty. of earthwork for the Length Total Sec.
portion of the a road with the formation Chainage (m) Area
(Bd+sd2) m2
width of the road as 8m, side slopes in
𝟏 20 30 11.76
banking as 2:1 in cutting as 1 :1 and
𝟐
21 30 10.62
length of chainage as 30m.
22 30 5.34
23 30 7.36
24 12 1.66
Passes from banking to cutting 0
25 18 2.58
26 30 6.58
27 30 6.58
28 30 25.62
29 30 22.42
30 30 20.88