You are on page 1of 4

BANK ATM

ABSTRACT
The Computerization of “Banking On ATM Card” is the main objective of the
project. By using this software package the time consumption and work
burden will be reduced immensely .

The software entitled as ‘Banking On ATM Card’ is used for storing details of
the Accounting in the Bank database . It is interactive and user – friendly
software developed using .NET.

The project helps to store and maintain all details of the Account details in
the database of the customer and reduce data redundancy , inconsistency,
and it also helps to implement standards . The project is divided into five
modules.

1. Account

2. Display

3. Balance enquiry

4. Transaction

5. Exit

SYSTEM STUDY

The system study is indented with the study of the existing system, that is
about the current Data base system, the working of the system , the
concerned modules, and requirements etc . It also deals with the benefits
and disadvantages of the system . We must thoroughly understand the old
system and determine how computers can best be used to make its
operations more effective.

Before development of any project can be pursued, a system study is


conducted to learn the details of the current business situation . Information
gathered through the study, forms the basis for creating alternative design
strategies. Management selects the strategy to pursue.
Existing System
The existing system is studied to know the extent of computerization
required. Therefore, a detailed analysis of the existing system should be
conducted. For this purpose , system should be broken down into various
subsystems and these subsystems were analyzed closely to identify the
problem areas.

As we studied the existing system, it was found that there was multiple File
Management system which gives the facility for accessing the Banking
details . In a File Management all works are done manually. The main
problem of the manual operation is, it is time consuming and error prone
than the computerized system. There exists wastage of data retrieval time
as in the case of search and further processing. There was no efficient
system to manipulate the existing records.

The problem I observe in this area is that the user has to do all the
operations manually , by searching and analyzing large amount of data, a
miss‐spelled digit or character may create many hours of extra work and
complicated correction procedure. Necessary data validation checks are
included to avoid mistakes

PROPOSED SYSTEM
The existing system leads to many errors like data redundancy, data
inconstancy, and also much more paper works that waste very valuable time
and money. We collect a lot of information from different current tools and
it’s advantages.
Keeping this in mind we decided to develop a software and named as
“Banking On ATM Card” which is very user‐friendly and helps to make
research a real chore. This computerization improves efficiency of office
work, and also helps to keep data too many years without damage and can
be recollected as and when needed without much time

The Proposed system solves problems related to data accessing problems,


because it help the user to add details of the customer to the bank database
easily ,improving data recovery speed, easy searching and also provide
editing of data’s in the database

Feasibility Study
Feasibility Analysis

The main objective of feasibility study is to test the technical, social and
economic feasibility of developing a system. This is done before developing a
system . This is done by investigating the existing system in the area under
investigation and generating ideas about the new system.

The system must be evaluated from the technical view point first. The
assessment of this feasibility must be based on an outline design of the
system requirement in terms of input, output, programs, procedure and staff.
Having identified the outline of the system, the investigation must go on to
suggest the type of equipment, required method of developing the system,
and the method of running the system

This developing system must be justified by cost and benefit criteria to


ensure that effort is concentrated on project which will give best return at
the earliest . One of the factors which affect the development of a new
system is the cost it would require. Since the system is developed as a part
of our study , there is no manual cost to be spent for the proposed system.

Economic and Technical Feasibility


The system must be evaluated from the technical view point first. The
assessment of this feasibility must be based on an outline design of the
system requirement in terms of input, output, programs, procedure and staff.
Having identified the outline of the system, the investigation must go on to
suggest the type of equipment, required method of developing the system,
and the method of running the system
This developing system must be justified by cost and benefit criteria to
ensure that effort is concentrated on project which will give best return at
the earliest . One of the factors which affect the development of a new
system is the cost it would require. Since the system is developed as a part
of our study , there is no manual cost to be spent for the proposed
systemThe system must be evaluated from the technical view point first. The
assessment of this feasibility must be based on an outline design of the
system requirement in terms of input, output, programs, procedure and staff.
Having identified the outline of the system, the investigation must go on to
suggest the type of equipment, required method of developing the system,
and the method of running the system

This developing system must be justified by cost and benefit criteria to


ensure that effort is concentrated on project which will give best return at
the earliest . One of the factors which affect the development of a new
system is the cost it would require. Since the system is developed as a part
of our study , there is no manual cost to be spent for the proposed system

Social and Behavioral Feasibility

Proposed project would be beneficial only if they can be turned into


information system that’ll meet the organization operating requirements.
One of the main problem faced during the development of a new system is
getting acceptance from user . Being a general purpose software there are
no resistance from the users because this will be more beneficial to the users
Requirement Specification:

Hardware requirements:

Content Description

HDD 20 GB Min

40 GB Recommended

RAM 1 GB Min

2 GB Recommended

Software requirements:

Technology Or Framework .NET 3.5

Programming Language C# 3.0

Database Server Microsoft SQL Server 2005

IDE(Integrated Development Microsoft Visual Studio 2008


Environment)

You might also like