You are on page 1of 4
. ue cutee Dubai Airports = MEMORANDUM jb Director: AR & EP ey Director of Monitoring LM/HICR/3074/06/2017 cos Wednesday, June 21,2017 SUBJECT: Comments on Work Notification, JCR Ref # 03/1406/ICR, for the modifeation of Con D lounge to police office at Con D. ‘With reference tothe above subject please be informed that we have ‘No Objection” to proceed with the works detailed inthe work naification subject to compliance to eur below comments General Comments: 1, Incase of any emergencies at work, immediately cll CR at+97145045000 or 050 4575009. 2. Contractor staff shall mandatorily undergo Safety Induction Program before commencing project Work in Aiepor Premises of DI 3. Obtain epproval fom all relevant Deparments/Authorites before the commencement of work PTW epproval indicating the date and time of work shall be obtained from JCR before the commencement of work. 5. Before starvfinish of the work activity, contact the concerned Shift Duty Engineer for document verifiaton / Safety compliance ofthe work activity that to be performed, Contact details given below as per location for reference inal 1, Con D) | Serco Duty Manager | 0543062233 [Cargo and Ancillary Buildings | Serco Duly Manager | 0583062254 ‘Concourse B, Temninal 3 Duty Engineer 050-1076678 Coscourse A Duty Engineer 050-2811087 Concourse © Duy Engineer D50-SER9506 6. Local Area access permits shall be obtained from Shift Duty Engineer ifthe scope / location of work roquire access to ALAS (Airport Logistics and Special Systems), AU (Airport Uilities) Facilities, For further information on LOCAL AREA ACCESS PERMIT, call THD? (0097145035008. eee nace eeipecesres Cont'd Page 2.0f S Soa a epee nls * us Gijlao Dubai Airports LMVLICR/3074/0672017 Page2 ofS EM Electrical Comments: 1. Eletrcal room and substation access, Switching operation and disconnection of power lise with FM shift engincer 0505889906)0S010076578/0502811067/0S01078036!0801078036) Serco OAL — (0569920109 / Sereo Cargo - 05430622234 2. Do not cause any hindrance tothe live operational electrical system Do not work on any live electrical DB, SMDB, and MCC etc. If required separate work notification shall be submitted with detail method statement and risk asressment Al Elcrieal works shouldbe carried out under proper supervision by the contractor Design, quality and safety at work is sole responsibility of eontactor, consultant and DAED. Contractor has to coordinate with relevant sections in DA for the above works Separate WN shall be submitted to work on live eletrical Distribution panels (SMDB, MCC and DB Et). EM Civil Comments 1. Contractor to discus the details of fixing with DA ES FM Civil before starting the jobs. 2, Work program to be submitted before execution of work. ‘3. All Civil material used tobe signed and approved by ES FM Civil, 4. The existing services and asses should be covered and protected by the contactor. Any damages on these elements will be contactors responsibility 5. No alteration or modification o the building structure and asses should be caried out without spproval from ES FM Civil 6. Area need ta he restored tothe orginal shape 7. No eiling acess should he opened without ES approval. 8. Prior 10 any floor or wall core cutting, contractor has to obtin as-built drawings and check the existing of any services and structure elements to avoid damages to those services/Assets, And take final approval from DA ES FM Civil Section. ‘Hit Out Construction Job No: 124877 (WN 129677) Comments |. Work Contractor to coordinate with DA ES FOC on 0507793100 before starting the work, 19 submit the seape of work, method statement, proposed drawing “Material submital and the work program inthe site meeting. Kick off meeting is essential to start the work Al the power calculation and power outlets tobe checked by FOC CContrator to ensure that any ofthe existing services and airport operations not tobe affected Contractor to us suitable lifting machine in case required Contractor to submit physical sample forthe used material for approval to FOC Working timing to be checked with ICR Contractor to saorinate with the fire sttion to check with their regulation and 9 coondinate with FM for access and FOC to fllow the work 10, Contractor to submit completion cetficate along with the as built drawing on job completion Cont'd Page of § Sees Shores eitgoese TR a, Taree cial o3/iuoc ee : * roucormcTons seas bee Toni 1.0 Permit Request Deas Terminal Operation| DepeneOrgmistion mews: _DARWISH ALUMINIUM AND GLASS COLLEC PrjectComnetteense) 124577 Prise Tale: _Modification of CD Lounge to Police Office jer sepe New Tent pine Cal ote] Tl er Projet xa Lewion: —_Conoue D jeri sagg otsan a abolady ees? WES oO SwaeDor: 28400017 Surge 0600 tng 23090017 engine _1800 11 Permit Work Types) wise [Jena FR] cates] Demat ia ae [Tenis [=] tne |] etitipntie [] ti ee omits SAS oo = 5S = ae jie, Hees” Bao er Go ‘ther: Modification of CD lounge wo Police fice at Conousse D yee zor RE ieee coma Number _ 0565045916 Comet Number _ 0565045908 Fal Auheratin Pace DA Peri cota) ENGINEERING SERVICES RECEIVED i P15 JUN 2017 90H SRS St Sette tee Sitio Sa Se bee be Ce SS GEES Sie GS” GE ect Aer ving perma sche HSE En ne mn abr perm tm ae a

You might also like