OML 30 (ERIEMU)
ERIEMU LACT UNIT-1 EXTENSION SITE INSTALLATION PROJECT
Detailed Engineering
TABLE OF CONTENTS
1. PRESENTATION .....................................................................................................................3
2. PURPOSE ...............................................................................................................................3
This document is the property of SANAGLOBE and must not be reproduced, stored or disclosed without permission from COMPANY.
OML 30 (ERIEMU)
ERIEMU LACT UNIT-1 EXTENSION SITE INSTALLATION PROJECT
Detailed Engineering
2. Purpose
The purpose of this site visit was to gather site as-built information and compare basic engineering
studies with existing facilities that will be used to carry out the detailed engineering studies and
constructability analysis for the ERIEMU LACT UNIT-1 EXTENSION SITE INSTALLATION
PROJECT.
3. List of Items
Below are the following activities that were planned to verify on site during the site visit:
Confirm the feasibility of proposed extension of the existing LACT unit deck, structure, cage
enclosure walls, roof and gantry crane, perimeter lighting, and piping tie-ins to accommodate as
well as cater for the new metering streams.
Confirm and mark-up connection points for the two new metering streams to be tied to existing
Eriemu LACT Metering Skid and configured to utilise the existing Jiskoot auto sampling system,
meter prover/master meter and spare run as indicated in the P & ID.
Confirm and mark-up connections points and access feasibility of the Afiesere and Kokori
pipeline re-route at Eriemu Manifold to the LACT Metering Skid Inlet.
To identify possible position for installation (mounting) of New Metering Panel in the existing
LACT control room.
Confirm the feasibility of proposed tie-in connections to the existing tie-ins as per drawings.
This document is the property of SANAGLOBE and must not be reproduced, stored or disclosed without permission from COMPANY.
OML 30 (ERIEMU)
ERIEMU LACT UNIT-1 EXTENSION SITE INSTALLATION PROJECT
Detailed Engineering
4. Site Finding
Possible tie-in positions for pipe routing from each line of Afiesere and Kokori facilicities at the
Eriemu manifold to the LACT metering skid inlet was identified. This shall be achieved by
installing a new header on both lines from Afiesere & Kokori and tied-in to existing 12” lines
connected to the manifold header on the unit skid inlet. See picture 01 ~ picture 03 below.
Proposed New Metering Panel position in the existing LACT Control Room was identified.
Observed and identified the possibility of the proposed extension to accommodate and cater for
the two new metering streams. Extension to be carried out on;
o LACT Unit Deck
o LACT Unit Structure
o Cage Enclosure Walls
o LACT Unit Structure Roof
o Gantry Crane Rail
o Perimeter Lighting and,
o Piping tie-ins – drain piping system to drain pit, airline tubing connection to air compressor
& the new 16” manifold header.
This document is the property of SANAGLOBE and must not be reproduced, stored or disclosed without permission from COMPANY.
OML 30 (ERIEMU)
ERIEMU LACT UNIT-1 EXTENSION SITE INSTALLATION PROJECT
Detailed Engineering
Proposed new extension of the existing LACT unit deck, structure, cage enclosure walls, roof,
gantry crane and perimeter lighting should be carried out also to accommodate the New Bi-Di
Prover. This is as indicated on engineering P&ID’s and PGA’s from Emerson. Refer to drawings.
Position of existing access stairs from North of LACT Unit deck should be relocated during
extension to accommodate the New Bi-Di Prover to prevent from being obstructed by the server
pit to the Eriemu Manifold. See picture 07.
As much as possible, new pipe re-routing shall be made to follow existing pipe route to eliminate
the need for new supports as existing supports shall be used and some to be modified by
extending to accommodate new pipe re-routing.
A complete replacement from 12” pipeline to 16” pipeline from tie-in point of the newly installed
16” manifold header from the LACT unit skid both inlet & outlet downstream to the 24” pipeline in
Eriemu Manifold to avoid pressure build up due to installation of 2-nos new metering streams.
This is as indicated on site by the operation team.
This document is the property of SANAGLOBE and must not be reproduced, stored or disclosed without permission from COMPANY.
OML 30 (ERIEMU)
ERIEMU LACT UNIT-1 EXTENSION SITE INSTALLATION PROJECT
Detailed Engineering
6. Site Pictures
Picture 01
Pictures 2 & 3
This document is the property of SANAGLOBE and must not be reproduced, stored or disclosed without permission from COMPANY.
OML 30 (ERIEMU)
ERIEMU LACT UNIT-1 EXTENSION SITE INSTALLATION PROJECT
Detailed Engineering
This document is the property of SANAGLOBE and must not be reproduced, stored or disclosed without permission from COMPANY.
OML 30 (ERIEMU)
ERIEMU LACT UNIT-1 EXTENSION SITE INSTALLATION PROJECT
Detailed Engineering
Picture 4
This document is the property of SANAGLOBE and must not be reproduced, stored or disclosed without permission from COMPANY.
OML 30 (ERIEMU)
ERIEMU LACT UNIT-1 EXTENSION SITE INSTALLATION PROJECT
Detailed Engineering
Picture 05
This document is the property of SANAGLOBE and must not be reproduced, stored or disclosed without permission from COMPANY.
OML 30 (ERIEMU)
ERIEMU LACT UNIT-1 EXTENSION SITE INSTALLATION PROJECT
Detailed Engineering
Picture 6
Picture 7
This document is the property of SANAGLOBE and must not be reproduced, stored or disclosed without permission from COMPANY.
OML 30 (ERIEMU)
ERIEMU LACT UNIT-1 EXTENSION SITE INSTALLATION PROJECT
Detailed Engineering
This document is the property of SANAGLOBE and must not be reproduced, stored or disclosed without permission from COMPANY.