I-RP-OPS-OO-0001-25
CA Plant Daily Log Date 16-Nov-20
(Status as of 0600 hrs, 09/1/21) Rev. 31
POWER GENERATION, DISTRIBUTION & PROTECTION SYSTEM
● Power Generator & Distribution System Status: Normal Abnormality: ● Earthing System Status: Normal Abnormality:__________________________
● Protection System Status: Normal Abnormality:
● Diesel in Storage: Liters ● 630 kVA Generator Diesel Consumption in last 24 hrs (Liters): 185L ● 200 kVA Generator Diesel Consumption in last 24 hrs (Liters) : 30
● 630 kVA Generator in Operation: Yes Load:303 KWh ● Cumulative 630 kVA generator running hours(last 24 hrs): 3H-10M ● Breakdowns: 0
● 200 kVA Generator in Operation: Yes Load:130 KWh ● Cumulative 200 kVA generator running hours(last 24 hrs): 6H-10M ● Breakdowns: 0
● WAPDA Power Interruptions: 7 Times, Total duration: 9H-20M ● UPS Unit Failures: 0
● Remarks: N/A ● Average Diesel Consumption per day (Liters):
PLC STATUS
● ALL PLC s Healthy: Yes No, ● Unhealthy PLC: Nil ● Reasons: N/A
● PLC repeated alarms: Nil ● Electronic Card Failures: 0 ● Software revisions to PLC: 0
INSTRUMENT HEALTH & CALIBRATIONS
● Electrical instruments: Healthy No, ● Calibration done for: Nil
● Process instruments: Healthy No, ● Calibration done for: CA # 11 & 12 product temp. probe
● Instruments Bypassed: Nil ● Reason:
MAINTENANCE ACTIVITIES
● Zamil building water leakage repairing and panels bubble marking work in progress.
● Area 041, C.A Lab Cabinet doors leakage rectification work in progress. ● Area 03, C.A Room # 20 pressure testing and leakage rectification in progress.
Work Order
1