You are on page 1of 1

Document No.

I-RP-OPS-OO-0001-25
CA Plant Daily Log Date 16-Nov-20
(Status as of 0600 hrs, 09/1/21) Rev. 31
POWER GENERATION, DISTRIBUTION & PROTECTION SYSTEM
● Power Generator & Distribution System Status: Normal Abnormality: ● Earthing System Status: Normal Abnormality:__________________________
● Protection System Status: Normal Abnormality:
● Diesel in Storage: Liters ● 630 kVA Generator Diesel Consumption in last 24 hrs (Liters): 185L ● 200 kVA Generator Diesel Consumption in last 24 hrs (Liters) : 30
● 630 kVA Generator in Operation: Yes Load:303 KWh ● Cumulative 630 kVA generator running hours(last 24 hrs): 3H-10M ● Breakdowns: 0
● 200 kVA Generator in Operation: Yes Load:130 KWh ● Cumulative 200 kVA generator running hours(last 24 hrs): 6H-10M ● Breakdowns: 0
● WAPDA Power Interruptions: 7 Times, Total duration: 9H-20M ● UPS Unit Failures: 0
● Remarks: N/A ● Average Diesel Consumption per day (Liters):
PLC STATUS
● ALL PLC s Healthy: Yes No, ● Unhealthy PLC: Nil ● Reasons: N/A
● PLC repeated alarms: Nil ● Electronic Card Failures: 0 ● Software revisions to PLC: 0
INSTRUMENT HEALTH & CALIBRATIONS
● Electrical instruments: Healthy No, ● Calibration done for: Nil

● Process instruments: Healthy No, ● Calibration done for: CA # 11 & 12 product temp. probe
● Instruments Bypassed: Nil ● Reason:

MAINTENANCE ACTIVITIES

Repair & Project Activities Planned Maintenance

● Zamil building water leakage repairing and panels bubble marking work in progress.

● Disinfecting tunnel nozzles and filter cleaned.

● OHWT mechanical Level indicator problem rectification work in progress.

● Area 041, C.A Lab Cabinet doors leakage rectification work in progress. ● Area 03, C.A Room # 20 pressure testing and leakage rectification in progress.

● Area 086, Siren Motor installation completed.

● Installation of LPG system at cooking area in progress.

Work Order
1

Page 1 of 1