Professional Documents
Culture Documents
Vol IV Maps - de Gji Lu
Vol IV Maps - de Gji Lu
Res. Dratikoi
340 m 340 m
320 m 320 m
310 m
VLLACE SPRING FIELD 310 m
300 m 300 m
290 m 290 m
Vllace Spring 282 masl
280 m New Res. 280 m
Reservoir Papucia Military Area High Level Areas of Delvina City
270 m (OPTION) 270 m
N. "LEJLA MALO"
250 m 250 m
New Small P.S.
240 m 240 m
230 m 230 m
220 m 220 m
209 masl
210 m
Delvina City 210 m
Kroi Xhemall
200 m
New P.S. Delvina VRISI N. "SINAN BALLACI" Spring
200 m
180 m 180 m
Pressure Red. Valve (2 bar)
170 m
Altitude H=180m 170 m
160 m 160 m
150 m 150 m
Low Level Areas of Delvina City
140 m 140 m
N. "9 TETORI"
130 m 130 m
120 m 120 m
Client:
Ministry of Public Works and Transport
Project: Consulting Services for Preparation of
(MoPWT) Detailed Design and Tender Documents
Assistance to PEA in Tendering and
General Directorate for Water Supply and Contracting and Construction Supervision
Sanitation (GDWSS)
MUNICIPAL INFRASTRUCTURE IV
(BMZ-ID 2012 65 867, SBF-NO.9891 AND (2020 61 406 )
Drawing title:
Consultant: Date:
CONSULTANT CONSORTIUM
SETEC Engineering & Partners Hydraulic Scheme January 2017
Rev. 00
This document has been produced with the financial assistance of the European Union. The views expressed herein are those of SETEC Engineering Delvine MUN IV - DE - 001
& Partners and can therefore in no way be taken to reflect the official opinion of the European Commission.
HYDRAULIC SCHEME of GJIROKASTRA MUN IV
575 m
Proposed Water Supply Network 575 m
550 masl
550 m 550 m
525 masl
525 m 525 m
475 m 475 m
453 masl
DN 250 St
DN 300/250 St
450 m 450 m
430 masl 430 masl
425 m 425 m
400 m 400 m
DN 100 St 387 masl
DN 150 DCI
325 m 325 m
DN 250 St
Kodra e Shtufit
300 masl
300 m 300 m
278 masl
275 m 275 m
265 masl
256 masl
250 masl
DN 200 St
250 m 250 m
230 masl
220 masl
225 m 225 m
195 masl
200 m 200 m
150 m 150 m
Client:
Ministry of Public Works and Transport
Project: Consulting Services for Preparation of
(MoPWT) Detailed Design and Tender Documents
Assistance to PEA in Tendering and
General Directorate for Water Supply and Contracting and Construction Supervision
Sanitation (GDWSS)
MUNICIPAL INFRASTRUCTURE IV
(BMZ-ID 2012 65 867, SBF-NO.9891 AND (2020 61 406 )
Drawing title:
Consultant: Date:
CONSULTANT CONSORTIUM
SETEC Engineering & Partners Hydraulic Scheme January 2017
Rev. 00
This document has been produced with the financial assistance of the European Union. The views expressed herein are those of SETEC Engineering Gjirokaster MUN IV - GJI - 001
& Partners and can therefore in no way be taken to reflect the official opinion of the European Commission.
HYDRAULIC SCHEME of LUSHNJA MUN IV
Proposed Water Supply Network
170 m 170 m
160 m 160 m
150 m 150 m
140 m 140 m
130 m 130 m
120 m 120 m
110 m 110 m
90 m 86 masl 90 m
80 m 80 m
OD 160 HDPE
70 m 70 m
OD 110 HDPE
DN 250 DCI
DN 250 DCI
OD 160 HDPE
60 masl
60 m 60 m
OD 110 PE
OD 90 PE
DN 250 DCI
50 m 50 m
DN 400 DCI
40 m 40 m
VIROVA PS
122 L/S
30 m 30 m
DN 250 DI
DN 300 DCI
20 m DN 500 DI DN 400 ST
20 m
OD 400 HDPE
10 m 10 m
A
0m 0m
Client:
Ministry of Public Works and Transport
Project: Consulting Services for Preparation of
(MoPWT) Detailed Design and Tender Documents
Assistance to PEA in Tendering and
General Directorate for Water Supply and Contracting and Construction Supervision
Sanitation (GDWSS)
MUNICIPAL INFRASTRUCTURE IV
(BMZ-ID 2012 65 867, SBF-NO.9891 AND (2020 61 406 )
Drawing title:
Consultant: Date:
CONSULTANT CONSORTIUM
SETEC Engineering & Partners Hydraulic Scheme January 2017
Rev. 00
This document has been produced with the financial assistance of the European Union. The views expressed herein are those of SETEC Engineering Lushnje MUN IV - LU - 001
& Partners and can therefore in no way be taken to reflect the official opinion of the European Commission.
N
LEGEND
W E
Planned Structures
Sewer Pipes
0
25
DN
0
25
DN DN
30
0
M6 DN
250 DN
25
0
DN
228.30
400
0 00
205 12
.93
187
DN DN
18
9.2
5
0
.22
187
60
PS
S 186.08
DN
M3 50
DN 2 00
188
19
.94
8.0
0
DN
10
DN
25
000
DN
DN 1
DN 250 DN
30
30
5
2.9
19
el
22
9.0
0
259.44
0
n
255.
32
an
DN 30
0 Ch
50
00 gle
DN
00 10 0
DN 2
n
208
.30
D N3 80 ta
30
DN ec
19
251
80
4.4
251.
5
.75
DN r
0
252
20
.31
210.
210.00
00
9
7.6
Out4
24
S 192.52
00
0
DN 3
300
4
242.9
DN 300
DN 30
0
DN 5
D N 0 0
25
242
.29
.56
242
10
DN
0 DN
207.70
20
21
0N 250
0.4
4
6
210.3
229.16
00 0 DN 20D
265.00
00 DN
9
5.6
0
20
22
219.
75
D N5 1 20
N
2.2
6
DN
D DN
267
.76
DN 250
M2
0
nel
60
30
D
DN 500
DN
0
269.45
DN
han
Galeria
60
0
20
3000 / 2500
400
le C
276.37
.17
276
0
27
9.3
.30
5
222
ang
DN
37
216.
0
25
DN
DN
rect
Out5
S 198.45
200
Dahlem
00
DN 400
N3
Beratende Ingenieure
00
DIN EN ISO
200
Bonsiepen 7 9001:2008
DN
Zertifikat-Nr.
45136 Essen 4.05.0319
Fon: +49 (0) 201.8967-0
DN
H:\Projekte\14079\Zeichnungen\ConceptDesign\Gjirokastra\14079_01CD_Giro_designSewer_non-regret-measures.dwg
DN 400
This drawing is the copyright of the Dahlem Engineering and must not be copied or used without the consultant`s authorization.
Project
Municipal Infrastructure IV
Locations: Delvina; Lushnja; Gjirokastra
BMZ-ID: 2012 65 867, SBF-No. 9891 and (2020 61 406)
DN
250
Contents
Sewer System Gjirokastra
Non regret Measures
Overview Layout
Design phase Drawing No.: Index Scale:
DN 250