List of Active Engineering Standards Documents Due Date (March 31 2012)
Doc Abbreviation Doc Title
SABP-A-013 Corrosion Control in Amine Units SABP-A-022 Stainless Steel Fabrication, Testing and Installation SABP-L-009 Piping Spring Supports Design, Construction, Inspection and Maintenan SAEP-103 Metric Units of Weights and Measures SAEP-110 Saudi Aramco Standard Drawings SAEP-1101 Welding Test Supplement S01 for SMAW, Carbon and Low Alloy Steel Pip SAEP-1102 Welding Test Supplement S02 for SMAW, Carbon and Low Alloy Steel Pi SAEP-1103 Welding Test Supplement S03 for SMAW, Stainless Steel, Single Sided SAEP-1104 Welding Test Supplement S04 for SMAW, Stainless Steel / Nickel, Backi SAEP-1105 Welding Test Supplement S05 for SMAW, Nickel, Single Sided SAEP-1106 Welding Test Supplement S06 for GTAW, Aluminum with Backing SAEP-1107 Welding Test Supplement S07 for GTAW, Carbon, Low Alloy and Stainle SAEP-1108 Welding Test Supplement S08 for GTAW, Nickel SAEP-1109 Welding Test Supplement S09 for GTAW, Aluminum, Single Sided SAEP-1110 Welding Test Supplement S10 for SAW, Carbon and Low Alloy Steel Pip SAEP-1111 Welding Test Supplement S11 for SAW, Overlay, Carbon and Low Alloy SAEP-1112 Welding Test Supplement S12 for SMAW, Caron Steel, Small Diameter SAEP-1113 Welding Test Supplement S13 for FCAW, Caarbon Steel SAEP-1114 Welding Test Supplement S14 for SMAW, Carbon and Low Alloy Steel P SAEP-1115 Welding Test Supplement S15 for SMAW, Stainless Steel Lap SAEP-1116 Welding Test Supplement S16 for SMAW, Nickel Lap SAEP-1117 Welding Test Supplement S17 for SMAW, Wet Welding SAEP-1131 Pressure Relief Device Authorization through SAP Workflow SAEP-1133 Form 3750-ENG, Pressure Relieving Device Test Report SAEP-1141 Radiation Protection for Industrial Radiography SAEP-1142 Qualification of Non-Saudi Aramco NDT Personnel SAEP-1143 Radiographic Examination SAEP-1144 Magnetic Particle Examination SAEP-1145 Liquid Penetrant Examination SAEP-1146 Manual Ultrasonic Thickness Testing SAEP-1152 Approval Procedure for Ready-Mixed Concrete Mix Design SAEP-1160 Tracking and Reporting of Welding, NDT and Pressure Testing for Capita SAEP-122 Project Records SAEP-127 Security and Control of Saudi Aramco Engineering Data SAEP-20 Equipment Inspection Schedule SAEP-302 Instructions for Obtaining a Waiver of a Mandatory Saudi Aramco Engin SAEP-303 Engineering Reviews of Project Proposal and Detail Design Documentat SAEP-31 Corporate Equipment and Spare Parts Data Requirements SAEP-3101 Equipment and Spare Parts Data Requirements for Contractor Procured SAEP-316 Performance Qualification of Coating Personnel SAEP-324 Certification Review and Registration of Project Welders SAEP-325 Inspection Requirements for Pressurized Equipment SAEP-327 Disposal of Wastewater from Cleaning, Flushing and Dewatering Pipelin SAEP-334 Retrieval, Certification and Submittal of Saudi Aramco Engineering & V SAEP-342 Engineering Drawings Emergency Delivery Plan SAEP-343 Risk-Based Inspection (RBI) for In-Plant Static Equipment and Piping SAEP-347 Supplying Material from Stockists SAEP-351 Bolted Flange Joints Assembly SAEP-352 Welding Procedures Review and Approval 00-SAIP-06 Pressure Test Requirements 00-SAIP-07 Positive Material Identification Requirements 00-SAIP-10 Non-Conformance Reports 00-SAIP-10A Non-Conformance Reports 00-SAIP-13 Project Assessment Procedure 00-SAIP-51 Electrical Inspection 00-SAIP-71 Plant Inspection Index 00-SAIP-72 Inspection Involvement in Management of Change 00-SAIP-73 Inspection Manning Determination Guidelines 00-SAIP-74 Inspection of Corrosion under Insulation and Fireproofing 00-SAIP-75 External Visual Inspection Procedure 00-SAIP-76 Worksheet Control and Tracking Program 00-SAIP-77 Technical Alert Implementation and Tracking Program 00-SAIP-78 Inspection Records/Filing Procedure 00-SAIP-79 Assessment Recommendations Tracking System 00-SAIP-80 Guidelines for Process Equipment Inspection 01-SAIP-01 Small Nipple Inspection Program 01-SAIP-02 Retirement Thickness of In-Plant Piping 01-SAIP-04 Injection Point Inspection Program 01-SAIP-06 Inspection of SSSP Underground Storage Caverns 01-SAMSS-005 Shop Applied, Internal Cement Mortar Lining of Steel Pipe 01-SAMSS-010 Fabricated Steel Piping 01-SAMSS-012 Submarine Pipe Weight Coating 01-SAMSS-016 Qualification of Storage Tanks and Pressured Equipment for Resistance 01-SAMSS-017 Auxiliary Piping for Mechanical Equipment 01-SAMSS-023 Intrusive Online Corrosion Monitoring Qualifications 01-SAMSS-024 Pipe Handling and Nesting 01-SAMSS-025 Specification for Heavy Duty Polytetrafluoroethylene (PTFE) and Perfluo 01-SAMSS-029 RTR (Fiberglass) Sewer Pipe and Fittings for Gravity Flow 01-SAMSS-031 Product Marking for Pipe of Less than Six Inch Nominal Size 01-SAMSS-034 RTR (Fiberglass) Pressure Pipe and Fittings 01-SAMSS-035 API Line Pipe 01-SAMSS-038 Small Quantity Purchase of Pipe from Stockist and Approved Pipe Mills 01-SAMSS-039 Induction and Furnace Hot Pipe Bends 01-SAMSS-041 Specification for Lining of Tanks and Vessels with Elastomeric Materials 01-SAMSS-042 Reinforced Thermoset Resin (RTR) Pipe and Fittings in Water and Hydr 01-SAMSS-043 Carbon Steel Pipes for On-Plot Piping 01-SAMSS-044 CRA Clad Pipe Spools 01-SAMSS-045 Qualification Requirements for Composite Materials used in Lined Carb 01-SAMSS-046 Stainless Steel Pipe 01-SAMSS-047 Manufacturing of Stainless Steel Tubes 01-SAMSS-048 CRA Clad or Lined Steel Pipe 01-SAMSS-049 Reinforced Thermoset Resin (RTR) Pipe, Fittings and Adhesive Packing, 01-SAMSS-091 Oil Field Chemical Injection Skid System 01-SAMSS-333 High Frequency Welded Line Pipe 02-SAIP-01 Inspection of Positive Seal Coupling Systems 02-SAMSS-005 Butt Welding Pipe Fittings 02-SAMSS-006 Hot Tap and Stopple Fittings 02-SAMSS-008 Insulating Joints/Spools for Cathodic Protection 02-SAMSS-009 Design and Fabrication of Scraper Traps 02-SAMSS-010 Flanged Insulating Joints/Spools for Cathodic Protection 02-SAMSS-011 Forged Steel and Alloy Flanges 02-SAMSS-012 Weld Overlayed Fittings, Flanges and Spool Pieces 04-SAMSS-001 Gate Valves 04-SAMSS-002 Globe Valves 04-SAMSS-003 Additional Requirements for Low Temperature Valves 04-SAMSS-005 Check Valves, Swing Type 04-SAMSS-035 General Requirements for Valves 04-SAMSS-041 Expanding Plug Valve 04-SAMSS-042 4-Way Diverter Valve 04-SAMSS-047 Steel High Performance Butterfly Valves (Including Triple-Offset) 04-SAMSS-048 Valve Inspection and Testing Requirements 04-SAMSS-049 Inspection and Testing Requirements for API SPEC 6A, 10000 PSI Valv 04-SAMSS-050 Gate Valves, Through Conduit Type, API SPEC 6D 04-SAMSS-051 Ball Valves, API SPEC 6D 04-SAMSS-052 Ball Valves, API SPEC 6A 04-SAMSS-053 Steel Lubricated Plug Valves - Flanged and Welding End 04-SAMSS-054 General Requirements for Chokes 05-SAMSS-002 Automatic Electric Water Heaters 06-SAMSS-001 Selection and Qualification of Elastomeric Sealing Materials and Manufa 09-SAMSS-002 Pressure Preservative Treatment for Wood Piles, Timbers and Ties 09-SAMSS-021 Qualification Requirements for Alkyd Enamel Coating System (APCS-6) 09-SAMSS-030 Qualification Requirements for Conversion Coating/Alkyd Coating Syst 09-SAMSS-035 Qualification Requirements for Aluminum-Pigmented Alkyd Coating Sys 09-SAMSS-060 Packaging Requirements for Coatings 09-SAMSS-067 Qualification Requirements for Internal Coating Systems Used in Immers 09-SAMSS-068 Qualification Requirements for Coal Tar Epoxy in Buried or Immersion S 09-SAMSS-069 Qualification Requirements for Epoxy Coatings for Atmospheric Service 09-SAMSS-070 Qualification Requirements for Splash Zone Epoxy Compound (APCS-1 09-SAMSS-071 Qualification Requirements for Inorganic Zinc Primer (APCS-17A) and 09-SAMSS-075 Caulking Compound (Joint Sealant) 09-SAMSS-080 Shop-Applied Baked Internal Coatings 09-SAMSS-087 Qualification Requirements for Epoxy Coatings for Application on Damp 09-SAMSS-088 Aggregates for Concrete 09-SAMSS-089 Shop-Applied External Fusion Bonded Epoxy Coating for Steel Line Pipe 09-SAMSS-090 Shop-Applied Extruded P.E. External Coating System for Line Pipe 09-SAMSS-091 Qualification Requirements for Shop-Applied Internal FBE Coatings 09-SAMSS-093 Scaffold Plank 09-SAMSS-095 Hand-Applied, Pressure Sensitive Tapewrap for Temperatures up to 55° 09-SAMSS-096 High-Temperature Heat-Shrink Sleeves 09-SAMSS-097 Ready-Mixed Portland Cement Concrete 09-SAMSS-098 Precast Concrete Fence Posts 09-SAMSS-099 Specialized Coatings Tests 09-SAMSS-101 Qualification Requirements for Stand Alone Self-Priming Epoxy Mastic Co 09-SAMSS-103 Qualification Requirements for High Temperature External Coatings in 09-SAMSS-105 Heat-Shrink Sleeves for Service Temperatures less than 55°C 09-SAMSS-106 Epoxy Coating of Steel Reinforcing Bars 09-SAMSS-107 Qualification Requirements and Application of Composite Fluropolymer/ 09-SAMSS-113 The Requirements of External Liquid Coatings for Buried Pipelines and 09-SAMSS-114 Shop-Applied Extruded, Three-Layer Polypropylene External Coatings fo 12-SAIP-50 Use of Metal Studs in Buildings 12-SAMSS-005 Marking of Metal Products 12-SAMSS-007 Fabrication of Structural and Miscellaneous Steel 12-SAMSS-008 Erection of Structural and Miscellaneous Steel 12-SAMSS-014 Pre-Engineered Metal Buildings 12-SAMSS-018 Structural Plates, Rolled Shapes and Tubulars Specification for Fixed Of 12-SAMSS-023 Fiber-Reinforced Plastic (FRP) Grating and FRP Components 12-SAMSS-024 Fiber-Reinforced Plastic (FRP) Manhole and Access Covers with Frame 13-SAMSS-001 Special Purpose Gear Units 13-SAMSS-003 General Purpose Gear Units 14-SAMSS-531 Power Transformers 14-SAMSS-533 Three-Phase Dry-Type Power Transformers 14-SAMSS-534 Overhead-Type Distribution Transformers 14-SAMSS-536 Pad-Mounted, Three Phase Distribution Transformers 14-SAMSS-600 Material, Manufacture and Preservative Treatment of Wood Poles 14-SAMSS-602 Material, Manufacture and Preservative Treatment of Wood Crossarms 14-SAMSS-603 Octagonal Steel Poles for Overhead Distribution Systems - Crossarm Str 15-SAIP-50 Inspection Procedure for Conduit and Cable Seals 15-SAIP-51 Inspection Procedure for PVC Coated Rigid Steel Conduit 15-SAMSS-502 Medium Voltage Power Cable 5 kV through 35 kV 15-SAMSS-503 Submarine Power Cable 5 kV through 35 kV 15-SAMSS-504 Submarine Power Cable 69 kV through 230 kV 16-SAIP-11 Medium and High Voltage Oil Switches 16-SAMSS-502 Metal-Enclosed, Metal-Clad Low-Voltage Switchgear Assemblies 16-SAMSS-503 Indoor Controlgear - Low Voltage 16-SAMSS-504 Indoor Metal-Clad Switchgear: 1 to 38 kV 16-SAMSS-506 Indoor Controlgear - High Voltage 16-SAMSS-507 High Voltage Motor Controller - Outdoor 16-SAMSS-508 SF6 Gas Insulated Circuit Breakers, Outdoor - 34.5 kV through 230 kV 16-SAMSS-510 Manually Operated Pad Mounted SF6 Switchgear: 1 kV to 36 kV 16-SAMSS-512 Outdoor Switchrack - Low Voltage 16-SAMSS-513 Power System Automation Components 16-SAMSS-514 Control and Protective Relay Panel - Indoor 16-SAMSS-515 Design and Fabrication of High Resistance Grounding Systems 16-SAMSS-517 Adjustable Frequency Drive System - 1 kV and Above 16-SAMSS-518 Low Voltage Panelboards 16-SAMSS-519 Indoor Switchboard - Low Voltage 16-SAMSS-520 Cablebus 16-SAMSS-521 Indoor Automatic Transfer Switch - Low Voltage 16-SAMSS-522 Retrofit/Replacement Vacuum Circuit Breakers Applied in Indoor Metal-C 16-SAMSS-523 Materials System Specification for Metal Enclosed Isolated Phase Bus ¿ 17-SAIP-50 Inspection Coverage of Cathodic Protection Deep Anode Beds 17-SAMSS-004 Conventional (Tap Adjustable) Rectifiers for Cathodic Protection 17-SAMSS-005 Cathodic Protection Phase Controlled Rectifiers 17-SAMSS-006 Galvanic Anodes for Cathodic Protection 17-SAMSS-007 Impressed Current Anodes for Cathodic Protection 17-SAMSS-008 Junction Boxes for Cathodic Protection 17-SAMSS-012 Photovoltaic Power Supply for Cathodic Protection 17-SAMSS-017 Impressed Current Cathodic Protection Cables 17-SAMSS-018 Remote Monitoring System (RMS) for Cathodic Protection Applications 17-SAMSS-502 Form-Wound Induction Motors 250 HP and Above 17-SAMSS-503 Severe-Duty, Totally Enclosed, Squirrel Cage Induction Motors to 500 H 17-SAMSS-510 Form-Wound Synchronous Turbine Generators 17-SAMSS-511 Stationary Storage Batteries 17-SAMSS-514 Battery Rectifier/Charger 17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted Equipment 17-SAMSS-516 Uninterruptible Power Supply System 17-SAMSS-518 Diesel Generator Sets 17-SAMSS-520 Form-Wound Brushless Synchronous Motors 17-SAMSS-520B Form-Wound Brushless Synchronous Motors 18-SAMSS-493 Two Part Polyurethane Duct Sealant 18-SAMSS-625 Outside Plant - Fiber Optic Cable Specifications (Single Mode & Multipl 20-SAMSS-001 Welding and Brazing Consumables 21-SAMSS-002 Leather and Fabric Work Gloves 21-SAMSS-008 AFFF Liquid Concentrate 21-SAMSS-009 High Expansion Foam Concentrate 21-SAMSS-010 Fireproofing for Valve Actuator - Box and Blanket System Enclosures 21-SAMSS-011 Fluroprotein Foam Concentrate for MTBE Hydrocarbon Fires 21-SAMSS-012 Plant Emergency Response Team (PERT) Reserve Fire Brigade (RFB) Fir 21-SAMSS-013 Fire Protection Department Protective Clothing 21-SAMSS-014 Intumescent Fireproofing for Valve Actuators 22-SAMSS-003 Oil Suction and Discharge Hoses for Dock Tanker Loading 22-SAMSS-004 Oil Hose for Offshore Tanker Loading 23-SAMSS-010 Distributed Control Systems 23-SAMSS-020 Supervisory Control and Data Acquisition (SCADA) Systems 23-SAMSS-030 Remote Terminal Unit 23-SAMSS-050 Terminal Management Systems 23-SAMSS-060 Applications Integration Middleware 23-SAMSS-070 Laboratory Information Management System (LIMS) 23-SAMSS-071 Data Validation & Reconciliation System 23-SAMSS-072 Data Acquisition and Historization System (DAHS) 23-SAMSS-073 3D Asset Virtualization Tool 23-SAMSS-701 Industrial Ethernet Switch Specifications 26-SAMSS-045 Turbine Oils 32, 46, 68 and 100 26-SAMSS-046 Machinery Oils 150, 320, 460 26-SAMSS-047 Automotive Gear Lube 85W-140 26-SAMSS-048 Gear Lube EP220, EP460 EP1000 26-SAMSS-050 Transmission Oil D-II 26-SAMSS-051 Hydraulic Oil AW 68 26-SAMSS-052 All Purpose Grease EP 1 26-SAMSS-053 All Purpose Grease EP 3 26-SAMSS-054 Ball Bearing Grease 2 26-SAMSS-055 Polyethylene Grease 1 26-SAMSS-056 Diesel Engine Oil CF 26-SAMSS-057 Diesel Engine Oil EMD 26-SAMSS-058 Gas Turbine Oil 32 26-SAMSS-059 Insulating Oil 26-SAMSS-060 Refrigeration Oil - WF68 26-SAMSS-061 Penetrating Oil 26-SAMSS-062 Rust Preventive 26-SAMSS-063 Open Gear and Wire Rope Lubricant 26-SAMSS-064 General Purpose Cutting Oil 26-SAMSS-065 Heavy Duty Cutting Oil 26-SAMSS-066 Soluble Oil 26-SAMSS-067 Honing Oil 26-SAMSS-068 Synthetic Grinding Fluid 26-SAMSS-069 Way Lubricant 26-SAMSS-076 Synthetic Gas Turbine Oil 5 26-SAMSS-077 Rack and Pinion Grease 26-SAMSS-078 Turbine Oil Vapor Space Inhibitor 26-SAMSS-079 Refrigeration Oil HFC-134a Synthetic 26-SAMSS-080 Diesel Engine Oil 15W/40 26-SAMSS-081 Automotive Gear Lube 90 26-SAMSS-082 High Temperature Grease 26-SAMSS-083 Diesel Engine Oil CH-4 26-SAMSS-084 Turbo-Compressor Oils 32, 46 26-SAMSS-085 Kinetic Hydrate Inhibitors 27-SAIP-01 HVAC Inspection Requirements 27-SAMSS-001 Packaged Water Cooled Centrifugal Chillers for Utility Services 27-SAMSS-002 Direct Expansion Air Conditioning Systems for Offshore Facilities 27-SAMSS-003 Field Erected Cooling Towers 27-SAMSS-006 Centrifugal Fluorocarbon Refrigeration Units for Industrial/Process Servi 27-SAMSS-011 Fire, Smoke, and Combination Fire-Smoke Dampers 29-SAMSS-006 Uniform Shirts (White) 29-SAMSS-008 Fire Protection Department Uniform Badges 29-SAMSS-009 Industrial Security Male Short Sleeve Shirt 29-SAMSS-010 Industrial Security Male Long Sleeve Shirt 29-SAMSS-011 Industrial Security Waist Length Outer Wear-Jacket 29-SAMSS-013 Industrial Security Dark Brown Pants 29-SAMSS-014 Fire Protection Department Hip Length Jacket 29-SAMSS-015 Fire Protection Trousers - Navy Blue 30-SAMSS-001 Diesel Engines 31-SAMSS-001 Axial and Centrifugal Compressors and Expander-Compressors 31-SAMSS-002 Packaged Screw Plant and Instrument Air Compressors 31-SAMSS-003 Reciprocating Compressors for Process Air or Gas Service 31-SAMSS-004 Centrifugal Pumps 31-SAMSS-006 Packaged, Integrally Geared Centrifugal Air Compressors 31-SAMSS-009 Positive Displacement Pumps - Controlled Volume 31-SAMSS-010 Submersible Pumps and Motors for Water Well and Offshore Service 31-SAMSS-012 Shaft Sealing Systems for Centrifugal and Rotary Pumps 32-SAIP-11 Inspection of Air-Cooled Heat Exchangers 32-SAMSS-001 Special Purpose Steam Turbines for Generator Sets 32-SAMSS-002 Manufacture of FRP Storage Tanks 32-SAMSS-004 Manufacture of Pressure Vessels 32-SAMSS-005 Manufacture of Atmospheric Tanks 32-SAMSS-006 Manufacture of Low Pressure Tanks 32-SAMSS-007 Manufacture of Shell and Tube Heat Exchangers 32-SAMSS-008 Inlet Air Filtration Systems for Combustion Gas Turbines 32-SAMSS-009 General Purpose Steam Turbines 32-SAMSS-010 Special Purpose Steam Turbines 32-SAMSS-011 Manufacture of Air-Cooled Heat Exchangers 32-SAMSS-013 Lubrication, Shaft Sealing and Control Oil Systems 32-SAMSS-016 Inlet Air Filtration Systems for Air Compressors 32-SAMSS-017 Side-Entry Mixers 32-SAMSS-019 Manufacture of Plate and Frame Heat Exchangers 32-SAMSS-020 Manufacture of Trays and Packing 32-SAMSS-021 Manufacture of Industrial Boilers 32-SAMSS-022 Manufacture of Components for Flare Systems 32-SAMSS-027 Manufacture of Electric Heat Exchangers 32-SAMSS-028 Manufacture of Double Pipe Heat Exchangers 32-SAMSS-029 Manufacture of Fired Heaters 32-SAMSS-030 Manufacture of Small Metallic Atmospheric Storage Tanks 32-SAMSS-031 Manufacture of Clad Vessels and Heat Exchangers 32-SAMSS-033 Reverse Osmosis Systems 32-SAMSS-034 Granular Filtering Materials 32-SAMSS-035 Manufacture of Heat Recovery Steam Generator 32-SAMSS-036 Manufacture of Small Pressure Vessels 32-SAMSS-037 Material Specification for the Manufacture of Fiber Reinforced Plastic ( 32-SAMSS-100 Combustion Gas Turbines 34-SAMSS-112 Orifice Meter for Gas Custody Measurement 34-SAMSS-114 Ultrasonic Flow Meter for Gas Custody Measurement 34-SAMSS-117 Turbine Flow Meters in Liquid Service 34-SAMSS-118 Positive Displacement Meters 34-SAMSS-119 Bi-Directional Meter Prover 34-SAMSS-120 Uni-Directional Meter Prover 34-SAMSS-121 Small Volume Prover 34-SAMSS-122 Atmospheric Portable Tank Prover 34-SAMSS-167 Truck Loading Metering Systems 34-SAMSS-168 Truck Unloading Metering Systems 34-SAMSS-318 Automatic Tank Gauging Equipment 34-SAMSS-319 Radar Tank Gauging Equipment 34-SAMSS-321 Radar Tank Gauging Systems for Royalty/Custody Measurement of Hydr 34-SAMSS-511 Chromatographs 34-SAMSS-512 Oxygen Analyzers 34-SAMSS-514 Combustible Gas and Hydrogen Sulfide Monitors 34-SAMSS-515 Moisture Analyzers 34-SAMSS-517 Density Meters 34-SAMSS-525 Automatic Sampling Systems for Crude Oil and Refined Products 34-SAMSS-611 Safety Relief Valves Conventional and Balanced Types 34-SAMSS-612 Safety Relief Valves Pilot Operated Types 34-SAMSS-617 Flame Monitoring Systems 34-SAMSS-619 Burner Management Systems for Watertube Boilers 34-SAMSS-621 ESD Systems - Hard-Wired - Solid-State (Nonprogrammable) 34-SAMSS-622 ESD Systems - Electromagnetic Relay 34-SAMSS-623 Programmable Controller Based ESD Systems 34-SAMSS-624 Wellhead Control, Monitoring and Shutdown Systems 34-SAMSS-625 Machinery Protection Systems 34-SAMSS-634 Local ZV Control Systems 34-SAMSS-711 Control Valves 34-SAMSS-716 Pneumatic Actuators On-Off Service 34-SAMSS-717 Hydraulic Valve Actuators Systems 34-SAMSS-718 Electric Motor Operated Valve Actuators 34-SAMSS-815 Annunciators 34-SAMSS-820 Instrument Control Cabinets - Indoor 34-SAMSS-821 Instrument Control Cabinets - Outdoor 34-SAMSS-830 Programmable Logic Controller 34-SAMSS-831 Instrumentation for Packaged Units 34-SAMSS-841 Flow Computer for Custody Transfer Measurement of Hydrocarbon Liqui 34-SAMSS-846 Flow Computers for Custody Transfer Measurement of Hydrocarbon Ga 34-SAMSS-847 Preset Controller for Truck Loading and unloading Systems 34-SAMSS-851 Metering Supervisory Computer for Custody Transfer Measurement of H 34-SAMSS-911 Instrument Asset Management Systems (IAMS) 34-SAMSS-913 Instrumentation and Thermocouple Cable 36-SAMSS-001 Co-Generation Train 45-SAMSS-005 Valves and Wellhead Equipment Requirements per API SPEC 6A 45-SAMSS-006 Casing and Tubing Requirements per API SPEC 5CT and API SPEC 5B 45-SAMSS-007 Casing and Tubing - Pup Joints Requirements per API SPEC 5CT and 45-SAMSS-008 Casing, Tubing and Conductor - Crossover Per API SPEC 5CT, API S 45-SAMSS-009 Casing and Tubing - Couplings Requirements per API SPEC 5CT and 45-SAMSS-013 High Frequency Welded Solid Expandable Tubulars (SET) 55-SAMSS-001 ESP Controller Skid - Outdoors 55-SAMSS-002 ESP Controllers 55-SAMSS-003 ESP Transformers - Outdoors 55-SAMSS-004 Modular Building for ESP Equipment 74-SAMSS-001 Pantograph Cables for Marine Loading Arms - Testing and Inspection R SABP-A-001 Polythionic Acid SCC Mitigation SABP-A-002 Load Management for Energy Efficiency: Pumps and Compressors SABP-A-005 Quick Energy Assessment Methodology for Energy Efficiency Optimizati SABP-A-007 Steam Trap Management for Energy Efficiency SABP-A-008 Load Management for Energy Efficiency: Heat Transfer Equipment SABP-A-009 Pinch Technology for Energy Efficiency Optimization SABP-A-011 Energy Conservation Requirements in Saudi Aramco Engineering Standar SABP-A-012 New Projects Energy Efficiency Optimization Review Methodology SABP-A-014 Atmospheric Oil Degassing, Spheroids and Stabilizers Corrosion Control SABP-A-015 Chemical Injection Systems SABP-A-016 Crude Unit Corrosion Control SABP-A-018 GOSP Corrosion Control SABP-A-019 Pipeline Corrosion Control SABP-A-020 Corrosion Control in Sulfur Recovery Units SABP-A-021 Corrosion Control in Desalination Plants SABP-A-023 In-House Combined Heat and Power Optimization Model SABP-A-024 Sand Control Methods SABP-A-025 Corrosion Control in Vacuum Distillation Units SABP-A-026 Cooling Systems Corrosion Control SABP-A-028 Optimizing Design and Operation of Reverse Osmosis Plants SABP-A-029 Corrosion Control in Boilers SABP-A-030 Energy Assessment for Efficiency Optimization in GOSP SABP-A-032 Assets Repair History SAP Input SABP-A-034 Plant Performance and Capacity Testing Procedure for Upstream Crude SABP-A-036 Corrosion Monitoring Best Practice SABP-A-037 Chemical Automation System SABP-C-001 Guidelines for Technical Assessment of Manufacturers of Trays and Pac SABP-D-001 Guidelines for Technical Assessment of Manufacturers of Pressure Ves SABP-E-002 Guidelines for Retubing Heat Exchangers SABP-E-003 Performance Enhancement to Existing Air-Cooled Heat Exchangers SABP-F-001 Process Heaters Optimizations SABP-F-002 Guidelines for Conducting Heat Transfer Equipment Manufacturing Facili SABP-F-004 Sootblowers Operation, Inspection, and Maintenance Guidelines SABP-G-001 Centrifugal Pumps Dynamic Analysis Factory Acceptance Test SABP-G-002 General Purpose Steam Turbines Dynamic Analysis Factory Acceptance SABP-G-003 Special Purpose Steam Turbines Dynamic Analysis Factory Acceptance SABP-G-005 Synchronous Motors Dynamic Analysis Factory Acceptance Test SABP-G-006 Induction Motors Dynamic Analysis Factory Acceptance Test SABP-G-007 Packaged, Integrally Geared Centrifugal Air Compressor Dynamic Analy SABP-G-008 Field Reliability Unit Guidelines and Procedures SABP-G-009 Preventive Maintenance Optimization Guidelines and Procedures SABP-G-009A Preventive Maintenance Optimization Guidelines and Procedures SABP-G-010 Guidelines for Surveying Manufacturing Facilities of Rotating Equipment SABP-G-011 Air Cooled Heat Exchangers (Fin-Fans) Reliability Document SABP-G-012 A User Guide to Root Cause Analysis Guidelines and Procedures SABP-G-013 Rotating Equipment Piping Strain Diagnosis SABP-G-014 Procedure for Assessing the Accuracy of Field Data-Collectors and Alli SABP-G-015 Guidelines for Holset Coupling Setup SABP-G-016 Guidelines for Identifying and Eliminating The Root Cause of Rotor Parti SABP-G-017 Equipment Criticality Assessment SABP-G-018 Torsional Analysis Requirements for Synchronous Motor Driven Compres SABP-G-019 Rotordynamic Design Review - Lateral Analysis SABP-H-001 Selection and Application of Reinforced Fiber Glass Lay up System for SABP-H-003 Guidelines for Surveying Carbon Steel Pipe Coating Applicators and Coa SABP-H-004 Robotic Coating Application on Internal Girth Welds of Pipe Strings SABP-J-701 Troubleshooting Control Valve Seat Leakage SABP-J-711 Selection of Recycle Valves for Salt Water Disposal Pumps SABP-K-001 Energy-Efficient Buildings SABP-K-002 Introduction to Industrial Refrigeration Systems Targeting SABP-K-003 Guidelines for Technical Assessment of HVAC Equipment Manufacturing F SABP-K-100 Heavy Duty Gas Turbines Inspections SABP-K-401 Site Performance Testing of Centrifugal Compressors SABP-L-001 Wall Thickness Selection of Transportation Pipelines SABP-L-002 Design of Submarine Pipelines SABP-L-003 Guidelines for Conducting Pipe Mill Survey SABP-L-004 Guidelines for Surveying Manufacturing Facilities of Reinforced Thermos SABP-L-005 Piping Vibration Measurements and Assessment SABP-L-006 Piping Stress Analysis Review SABP-L-007 Guidelines for Conducting Flanges Manufacturing Facility Technical As SABP-L-008 Guidelines for Conducting Technical Assessment of Fitting Manufacturing SABP-L-010 Guidelines for Evaluating Pipe Movement SABP-L-012 Guidelines for On-Stream Scraping of Pipelines SABP-M-001 Inspection Guidelines of Offshore Structures SABP-M-006 Wind Loads on Piperacks and Open Frame Structures SABP-M-007 Steel Piperack Design SABP-P-001 Guidelines for the Condition Assessment of Large Electrical Generators SABP-P-002 Selection and Design of Battery Monitoring System SABP-P-003 Adjustable Frequency Drives - Selection and Application SABP-P-004 New Electrical Equipment Plant Assessment SABP-P-005 Transformer Factory Acceptance Tests SABP-P-006 Synchronous Generators and Associated Control Equipment Datasheets R SABP-P-008 Inspection and Maintenance for Wooden Poles SABP-P-009 Power Transformer Diagnostics SABP-P-010 Motor Partial Discharge Monitors - Selection and Application SABP-P-011 Captive Motor-Transformers: Design and Selection SABP-P-012 Preparation & Application Procedure for High Voltage Insulators Coating SABP-P-013 Electrical Design in Hazardous (Classified) Areas SABP-P-014 Guidelines for Designing Excitation Systems SABP-P-015 Troubleshooting, Repair Procedures, and Up-rating of Large Electrical G SABP-P-016 Power Transformer Maintenance SABP-P-017 Grassroots Project Energy Assessment Study Scope of Work SABP-P-018 Guide on Induction Motors Factory Acceptance Test Procedures SABP-P-019 Guide on Synchronous Motors Factory Acceptance Test Procedures SABP-P-020 Transformers Condition Assessment SABP-P-021 Investigation Process for Power Cable, Joint and Termination Failures SABP-P-022 Paralleling Mismatched Transformers SABP-P-023 Guide on Safe Handling of Metal Clad Switchgear SABP-P-024 Guidelines for Minor and Major Preventive Maintenance (PM) of UPS Sy SABP-P-024A Appendix A: Minor PM quarterly UPS system in operation SABP-P-024B Appendix B: Major PM - annual UPS system shutdown SABP-P-024C Appendix C SABP-P-035 Guidelines for Motors and Generators Condition Assessment SABP-P-036 Switchgear and Controlgear Condition Assessment Guidelines SABP-P-037 Battery Condition Assessment SABP-P-038 Guidelines for the Condition Assessment of Uninterruptable Power Supp SABP-P-039 Guidelines for the Condition Assessment of Rectifiers/Battery Chargers SABP-P-040 Adjustable Frequency Drive, Application Qualification Procedure SABP-P-041 Guidelines for Conducting Arc Flash Hazard Analysis SABP-Q-001 Anchor Bolt Design and Installation SABP-Q-002 Spread Footings Design SABP-Q-003 Vertical Vessel Foundation Design SABP-Q-004 Heat Exchanger and Horizontal Vessel Foundation Design SABP-Q-005 Storage Tank Ringwall Foundation Design SABP-Q-006 Wind Loads on Pressure Vessels SABP-Q-007 Deadman Anchor Design Guide SABP-Q-008 Design of Concrete Masonry Walls/Buildings SABP-Q-009 Pile Foundation Specifications and Bearing Capacities SABP-Q-010 Mix Design and Construction of Sulfur Extended Asphalt Concrete SABP-T-001 Proactive Monitoring and Alerting Solution for Plant Networks and Syste SABP-W-001 Best Practice for the Welding of Cast Iron SABP-W-002 Repair of Tube to Tubesheet Welds and Retubing of Sulfur Condensers SABP-X-001 Cathodic Protection Design Package Preparation SABP-X-002 Cathodic Protection Rectifier (Tap Adjustable) Factory Acceptance Tests SABP-X-003 Cathodic Protection Installation Requirements SABP-X-004 Plants Survey and Technical Assessment of Cathodic Protection Equipm SABP-Z-001 Plant Information System Data Compression SABP-Z-002 Functional Specifications for Process Control Systems SABP-Z-002A Project Specification for PCS Scope of Work SABP-Z-002B Functional Specification for Process Control Systems (PCS) and Integrat SABP-Z-002C Functional Specification for Distributed Control Systems (DCS) SABP-Z-002D Functional Specification for Emergency Shutdown Systems (ESD) SABP-Z-002E Functional Specification for Compressor Control Systems (CCS) SABP-Z-002F Functional Specification for Data Acquisition and Historization Systems SABP-Z-002G Functional Specification for Alarm Management Systems (ALMS) SABP-Z-002H Functional Specification for System Design Document (SDD) SABP-Z-002I Functional Specification for Maintenance Training System (MTS) SABP-Z-002J Functional Specification for Operator Training System (OTS) SABP-Z-002K Functional Specification for Supervisory Control and Data Acquisition SABP-Z-002L Functional Specification for Remote Terminal Unit (RTU) SABP-Z-002M Functional Specification for Leak Detection Systems (LDS) SABP-Z-002N Functional Specification for Terminal Management System (TMS) SABP-Z-002S Functional Specification for Production Operation Management (POM) SABP-Z-002T Functional Specification for Maintenance Operation Management (MnOM SABP-Z-002U Functional Specification for Quality Operation Management (QOM) SABP-Z-002V Functional Specification for Inventory Operation Management (IOM) SABP-Z-030 Wireless Process Remote Monitoring and Control Using SMS SABP-Z-031 Wash Water Injection Facilities for Hydroprocessing Units SAEP-1020 Capital Program Planning SAEP-1021 Surveying Services Division Project Control SAEP-1024 Chemical Cleaning of New Steam Generating Equipment SAEP-1025 Chemical Cleaning of Boilers SAEP-1026 Boilers Lay-Up Procedures SAEP-1027 Pressure Relief Valve Conventional and Balanced Types SAEP-1028 Chemical Cleaning and Flushing of Lube/Seal Oil and Fluid Power Syst SAEP-1050 Guideline for Disaster Recovery Plan Development for Process Automat SAEP-1125 Brazing Test Supplement S25 with TB, Copper and Copper Alloy Tubing SAEP-1132 Instructions for Using the Relief Valve Test Stand SAEP-1134 Relief Valve Technician Certification SAEP-1135 On-Stream Inspection Administration SAEP-1140 Qualification of Saudi Aramco NDT Personnel SAEP-1150 Inspection Coverage on Projects SAEP-1154 Guidelines for Contractor's Quality Plan SAEP-1161 Testing and Inspection (T&I) Reporting Procedure SAEP-119 Preparation of Saudi Aramco Materials System Specifications SAEP-12 Project Execution Plan SAEP-120 Security Drawings for Saudi Aramco Facilities SAEP-1200 Process Flow Requirements for Qualification Procedures of Industrial Co SAEP-121 Operating Instructions for New Facilities SAEP-125 Preparation of Saudi Aramco Engineering Standards SAEP-13 Project Environmental Impact Assessments SAEP-133 Instructions for the Development of "Regulated Vendors List" Engineeri SAEP-134 Preparation of Saudi Aramco Engineering Procedures SAEP-135 Saudi Aramco Process Automation System (PAS) Obsolescence Progra SAEP-1350 Design Basis Scoping Paper (DBSP) Preparation and Revision Procedur SAEP-136 Saudi Aramco Management of Electric Equipment Obsolescence Progr SAEP-14 Project Proposal SAEP-140 Project Training Impact Assessment SAEP-15 Preparation of Restricted Vendor Lists for Process Automation Systems SAEP-1510 Process Automation RVL Management Procedure SAEP-16 Project Execution Guide for Process Automation Systems SAEP-1610 Preparation of Functional Specification Documents SAEP-1622 Preparation of technical Bid Evaluation Plan Document for Process Aut SAEP-1624 Preparation of System Design Documents SAEP-1626 Configuration and Graphics Guidelines SAEP-1628 Preparation of Integration Specifications Document SAEP-1630 Preparation of Integration Test Procedure Document SAEP-1634 Factory Acceptance Test SAEP-1636 Installation and Checkout Plan SAEP-1638 Site Acceptance Test Plan SAEP-1650 Main Automation Contractor SAEP-1652 Process Automation Technology Focus Team (PATFTT) Technology Selec SAEP-1661 Waste Minimization Opportunity Assessments SAEP-1662 Cleaning of Heat Exchangers and Unfired Plant Equipment SAEP-1663 Design Guidelines for Gas Oil Separation Plant (GOSP) SAEP-1664 Design Guidelines for Crude Oil Stabilizer SAEP-201 Saudi Aramco Engineering Reports SAEP-21 Project Execution Requirements for Saudi Aramco Royalty/Custody Met SAEP-22 Tank Calibration Requirements SAEP-25 Estimate Preparation Guidelines SAEP-250 Safety Integrity Level Assignment & Verification SAEP-26 Capital Project Benchmarking Guidelines SAEP-27 Pipelines/Piping Hydraulic Surge Analysis SAEP-28 Radar Tank Gauging Equipment Verification Requirements SAEP-29 General Instructions and Guidelines for Online Valve Preventive Mainte SAEP-301 Instructions for Establishing and Maintaining Mandatory Saudi Aramco SAEP-302A Attachment A of SAEP-302 SAEP-302B Attachment B of SAEP-302 SAEP-305 Saudi Aramco Library Drawings SAEP-306 Assessment of the Remaining Strength of Corroded Pipes SAEP-306A Assessment of the Remaining Strength of Corroded Pipes SAEP-308 Operations Inspection Unit Reviews SAEP-309 Inspection of Community and Operations Support Facilities SAEP-310 Piping and Pipeline Repair SAEP-3101A Appendix A - Glossary of Terms SAEP-3101B Appendix B - Spare Parts Data Package Status Report (SPDPSR) Requi SAEP-3101C Appendix C - Instructions to Suppliers for Providing Spare Parts and O SAEP-3101D Appendix D - Spare Parts Data Package (SPDP) Checklists SAEP-3101E Appendix E - SPDP Waiver Procedure SAEP-3102 Equipment and Spare Parts Data Requirements for SAPMT Originated Re SAEP-3102A Appendix A - Glossary of Terms SAEP-3102B Appendix B - Spare Parts Data Package Status Report (SPDPSR) Requi SAEP-3102C Appendix C - Instructions to Suppliers for Providing Spare Parts and O SAEP-3102D Appendix D - Spare Parts Data Package (SPDP) Checklists SAEP-3102E Appendix E - SPDP Waiver Procedure SAEP-3103 Equipment and Spare Parts Data Requirements for Proponent/MRO Origi SAEP-3103A Appendix A - Glossary of Terms SAEP-3103B Appendix B - Spare Parts Data Package Status Report (SPDPSR) Requi SAEP-3103C Appendix C - Instructions to Suppliers for Providing Spare Parts and O SAEP-3103D Appendix D - Spare Parts Data Package (SPDP) Checklists SAEP-3103E Appendix E - SPDP Waiver Procedure SAEP-311 Installation of Hot Tapped and Stopple Connections SAEP-317 Testing and Inspection (T&I) of Shell and Tube Heat Exchangers SAEP-318 Pressure Relief Valve Program Authorization for Installation, Deletion SAEP-319 Pressure Relief Valves - Routine Test, Inspection, Quality Assurance an SAEP-319A Pressure Relief Valves - Routine Test, Inspection, Quality Assurance an SAEP-32 Environmental Performance Assessment (EPA) Program SAEP-321 Performance Qualification Testing and Certification of Saudi Aramco We SAEP-322 Performance Qualification Testing And Certification of Saudi Aramco Bra SAEP-323 Performance Qualification Testing of Contract Welders and Brazers SAEP-329 Project Close-Out Report SAEP-329A1 Project Close-Out Report SAEP-329A2 Project Close-Out Report SAEP-329A3 Project Close-Out Report SAEP-332 Cathodic Protection Commissioning SAEP-332A Cathodic Protection Commissioning SAEP-333 Cathodic Protection Monitoring SAEP-333A Cathodic Protection Monitoring SAEP-335 Boiler Condition Assessment SAEP-339 Marine Dredging and Landfilling Approval and Permitting SAEP-340 Air Quality Impact Analysis and Assessment SAEP-341 Equipment Life Cycle Cost Procedure SAEP-345 Composite Non-Metallic Repair Systems for Pipelines and Pipework SAEP-348 Chemical Cleaning, Disinfection, Post Treatment and Storage of Reve SAEP-349 Advanced Process Control (APC) Systems SAEP-35 Valves Handling, Hauling, Receipt Tests and Storage SAEP-350 Regular Maintenance and Testing for Industrial Stationary Batteries SAEP-354 High Integrity Protective Systems Design Requirements SAEP-355 Field Metallography and Hardness Testing SAEP-357 Fiber Reinforced Plastic Grating Installation Guide SAEP-358 Management of Technologically Enhanced Naturally Occurring Radioact SAEP-36 Proving Systems Calibration Requirements SAEP-360 Project Planning Guidelines SAEP-361 Storage, Handling and Installation of Weight-Coated Pipe SAEP-363 Pipeline Simulation Model Development and Support SAEP-364 Process Simulation Model Development and Support SAEP-365 Pump Spare Parts Reverse Engineering SAEP-366 Roles & Responsibilities of Company Organizations for Seismic Risk A SAEP-367 Value Improvement Practice Requirements SAEP-368 Alarm System Management SAEP-37 Pipelines Residual Magnetism Removal SAEP-370 Transportation of Radioactive Material SAEP-371 Hearing Conservation Program (HCP) SAEP-372 Inspection Performance Index for Operating Facilities SAEP-373 High Integrity Protection Systems - Tracking Program SAEP-374 High Integrity Protection Systems - Periodic Functional Testing Require SAEP-375 High Integrity Protection Systems - SAP Tracking System Workflows SAEP-376 High Integrity Protection Systems - Testing & Maintenance Reporting Re SAEP-377 High Integrity Protection Systems - Personnel Training & Qualifications SAEP-380 Equipment Deficiency Report SAEP-381 Project Quality Issues Escalation Process SAEP-390 Radiation Protection Assessment (RPA) Program SAEP-400 Guidelines for Facility Flaring Minimization Plan SAEP-400A Appendix 10 - Real-Time Flare Monitoring System (FMS) SAEP-50 Project Execution Requirements for Third Party Royalty/Custody Meteri SAEP-500 Guidelines for Screening and Qualification of Chemicals for Hydrate and SAEP-501 Drag Reducing Agent (DRA) Chemicals SAEP-701 Plant Ethernet Network Test Procedure SAEP-707 Risk Assessement Procedure for Plants Networks and Systems SAEP-717 Saudi Aramco Information Technology System Obsolescence Program SAEP-744 Preventive Maintenance and Condition Assessment for Communication SAEP-746 Lifecycle Management Procedures for Process Automation Systems SAEP-99 Process Automation Networks and Systems Security SAES-A-004 General Requirements for Pressure Testing SAES-A-005 Safety Instruction Sheet SAES-A-007 Hydrostatic Testing Fluids and Lay-Up Procedures SAES-A-020 Equipment Specific P&ID Templates (ESPT) SAES-A-100 Survey Coordinates, Datum's and Data Formats SAES-A-102 Ambient Air Quality and Source Emissions Standards SAES-A-103 Discharges to the Marine Environment SAES-A-104 Wastewater Treatment, Reuse and Disposal SAES-A-105 Noise Control SAES-A-109 Site Planning for Prayer Shelters SAES-A-111 Borrow Pit Requirements SAES-A-112 Meteorological and Seismic Design Data SAES-A-113 Geotechnical Engineering Requirements SAES-A-114 Excavation and Backfill SAES-A-115 Groundwater Monitoring Well Design, Installation, and Decommissioning SAES-A-202 Saudi Aramco Engineering Drawing Preparation SAES-A-204 Preparation of Structural Calculations SAES-A-205 Oilfield Chemicals SAES-A-206 Positive Material Identification SAES-A-207 Catalyst and Desiccant Selection and Replacement SAES-A-208 Water Treatment Chemicals SAES-A-210 Management of Pyrophoric Wastes SAES-A-302 Aviation Fuel Quality Assurance Design Requirement SAES-A-400 Industrial Drainage Systems SAES-A-401 Closed Drain Systems (CDS) SAES-A-403 Offshore Platform Drainage Systems SAES-B-005 Spacing and Diking for Atmospheric and Low-Pressure Tanks. SAES-B-006 Fireproofing for Plants SAES-B-008 Restrictions to Use of Cellars, Pits, and Trenches SAES-B-009 Fire Protection and Safety Requirements for Offshore Production Faciliti SAES-B-014 Safety Requirements for Plant and Operations Support Buildings SAES-B-017 Fire Water System Design SAES-B-018 Foam Systems SAES-B-019 Portable, Mobile and Special Fixed Firefighting Equipment SAES-B-053 Machine and Equipment Safety Guarding, Elevators, Escalators, and Co SAES-B-054 Access, Egress, and Materials Handling for Plant Facilities SAES-B-055 Plant Layout SAES-B-057 Safety Requirements: Refrigerated and Pressure Storage Tanks and Ves SAES-B-058 Emergency Shutdown, Isolation, and Depressuring SAES-B-060 Fire Protection for Piers, Wharves and Sea Islands SAES-B-061 Protective Shields for High Health Hazard Piping and Equipment SAES-B-062 Onshore Wellsite Safety SAES-B-063 Aviation Obstruction Marking and Lighting SAES-B-064 Onshore and Nearshore Pipeline Safety SAES-B-067 Safety Identification and Safety Colors SAES-B-068 Electrical Area Classification SAES-B-069 Emergency Eyewashes and Showers SAES-B-070 Fire and Safety Requirements for Bulk Plants, Air Fueling Terminals and S SAES-C-001 Process Design of Trays and Packing SAES-D-001 Design Criteria for Pressure Vessels SAES-D-008 Repairs, Alterations, and Re-rating of Process Equipment SAES-D-100 Design Criteria of Atmospheric and Low-Pressure Tanks SAES-D-101 Regulated Vendors List for Pressure Vessels and Tanks SAES-D-108 Repair, Alteration and Reconstruction of Storage Tanks SAES-D-109 Design of Small Metallic Storage Tanks SAES-D-110 Design of Fiberglass-Reinforced Plastic (FRP) Storage Tanks SAES-D-116 Underground Storage Tank System SAES-E-004 Design Criteria of Shell and Tube Heat Exchangers SAES-E-006 Design Criteria of Double Pipe Heat Exchangers SAES-E-007 Design Criteria of Air-Cooled Heat Exchangers SAES-E-014 Design Criteria of Plate and Frame Heat Exchangers SAES-E-015 Design Criteria of Electric Heat Exchangers SAES-E-101 Regulated Vendors List for Heat Transfer Equipment SAES-F-001 Design Criteria of Fired Heaters SAES-F-007 System Design Criteria of Flares SAES-G-005 Centrifugal Pumps SAES-G-006 Positive Displacement Pumps - Controlled Volume SAES-G-007 Submersible Pumps and Motors for Water Well and Offshore Service SAES-G-101 Regulated Vendors List for Pumps and Mechanical Seals SAES-G-115 Lubrication, Shaft Sealing and Control Oil Systems SAES-G-116 Cleanliness Standard for Lube/Seal Oil and Fluid Power Systems SAES-H-001 Coating Selection and Application Requirements for Industrial Plants a SAES-H-002 Internal and External Coatings for Steel Pipelines and Piping SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatin SAES-H-003 Protective Coatings for Industrial Concrete Structures SAES-H-004 Protective Coating Selection and Application Requirements for Offshore S SAES-H-101V Approved Saudi Aramco Data Sheets - Paints and Coatings SAES-H-102 Safety Requirements for Coating Applications SAES-H-200 Storage, Handling and Installation of Externally Coated Pipe SAES-H-201 General Specifications for Over-the-Ditch External and Internal FBE Coat SAES-H-204 General Specifications and Application Procedures of Heat-Shrink Sleev SAES-I-001 ESP System - Design and Procurement SAES-I-002 ESP System - Supplier Integration SAES-J-001 Instrumentation Index SAES-J-002 Technically Acceptable Instrument Manufacturers SAES-J-003 Instrumentation - Basic Design Criteria SAES-J-004 Instrumentation Symbols and Identification SAES-J-005 Instrumentation Drawings and Forms SAES-J-100 Process Flow Metering SAES-J-200 Pressure SAES-J-300 Level SAES-J-400 Temperature SAES-J-502 Analyzer Shelters SAES-J-504 Sample Conditioning Systems for Process Analyzers SAES-J-505 Combustible Gas and Hydrogen Sulfide in Air Detection Systems SAES-J-600 Pressure Relief Devices SAES-J-601 Emergency Shutdown and Isolation Systems SAES-J-602 Burner Management, Combustion and Waterside Control Systems for Wat SAES-J-603 Process Heaters Safety Systems SAES-J-604 Protective and Condition Monitoring Equipment for Rotating Machinery SAES-J-605 Surge Relief Protection Systems SAES-J-607 Burner Management Systems for SRU Trains SAES-J-700 Control Valves SAES-J-801 Control Buildings SAES-J-901 Instrument Air Supply Systems SAES-J-902 Electrical Systems for Instrumentation SAES-J-903 Intrinsically Safe Systems SAES-J-904 FOUNDATION TM Fieldbus (FF) Systems SAES-J-905 Instrument Asset Management Systems (IAMS) SAES-K-001 Design and Installation of Heating, Ventilating and Air Conditioning Syst SAES-K-002 Air Conditioning Systems for Essential Operating Facilities SAES-K-003 Air Conditioning Systems for Communications Buildings SAES-K-011 Building Management System SAES-K-100 Saudi Aramco Mechanical (HVAC) Code SAES-K-101 Regulated Vendors List for Heating, Ventilating and Air Conditioning ( SAES-K-110 Regulated Vendors List for Compressors, Expanders, Gears and Steam SAES-K-115 Regulated Vendors List for Combustion Gas Turbines SAES-K-400 Basic Selection of Compressors SAES-K-402 Centrifugal Compressors SAES-K-403 Reciprocating Compressors SAES-K-501 Steam Turbines SAES-K-502 Combustion Gas Turbines SAES-K-511 Diesel Engines SAES-K-600 Side-Entry Mixers SAES-L-100 Applicable Codes and Standards for Pressure Piping Systems SAES-L-101 Regulated Vendors List for Pipes and Fittings SAES-L-102 Regulated Vendors List for Valves SAES-L-105 Piping Material Specifications SAES-L-108 Selection of Valves SAES-L-109 Selection of Flanges, Stud Bolts and Gaskets SAES-L-110 Limitations on Pipe Joints and Components SAES-L-120 Piping Flexibility Analysis SAES-L-125 Safety Instruction Sheet for Piping and Pipelines SAES-L-131 Fracture Control of Line Pipe SAES-L-132 Material Selection for Piping Systems SAES-L-133 Corrosion Protection Requirements for Pipelines, Piping and Process E SAES-L-136 Pipe, Flange and Fitting Material Requirements SAES-L-140 Thermal Expansion Relief in Piping SAES-L-150 Pressure Testing of Plant Piping and Pipelines SAES-L-310 Design of Plant Piping SAES-L-350 Construction of Plant Piping SAES-L-410 Design of Pipelines SAES-L-420 Scraper Trap Station and Appurtenances SAES-L-440 Anchors for Buried Pipelines SAES-L-450 Construction of On-Land and Near-Shore Pipelines SAES-L-460 Pipeline Crossings Under Roads and Railroads SAES-L-610 Nonmetallic Piping in Oily Water Services SAES-L-620 Design of Nonmetallic Piping in Hydrocarbon and Water injection System SAES-L-650 Construction of Nonmetallic Piping in Hydrocarbon and Water Injection SAES-L-810 Design of Piping on Offshore Structures SAES-L-850 Design of Submarine Pipelines and Risers SAES-M-001 Structural Design Criteria for Non-Building Structures SAES-M-005 Design and Construction of Fixed Offshore Platforms SAES-M-006 Saudi Aramco Security and General Purpose Fencing SAES-M-009 Design Criteria for Blast Resistant Buildings SAES-M-100 Saudi Aramco Building Code SAES-N-001 Basic Criteria, Industrial Insulation SAES-N-004 Design and Installation of Building Thermal Insulation SAES-N-100 Refractory Systems SAES-N-110 Installation Requirements - Castable Refractories SAES-N-120 Installation Requirements - Extreme Erosion Resistant Refractories SAES-N-130 Installation Requirements - Fireclay Bricks SAES-N-140 Installation Requirements - Refractory Ceramic Fiber SAES-O-201 Application of Security Directives SAES-O-202 Security Fencing SAES-O-203 Security Gate SAES-O-204 Security Lighting SAES-O-205 Integrated Security System SAES-O-206 Security Devices SAES-O-207 Power Supply for Security Systems SAES-O-208 Communications for Security Systems SAES-O-209 Security Doors SAES-O-210 Security Locks SAES-O-211 Identification Cards SAES-O-212 Security Information Protection SAES-P-100 Basic Power System Design Criteria SAES-P-101 Regulated Vendors List for Electrical Equipment SAES-P-103 UPS and DC Systems SAES-P-104 Wiring Methods and Materials SAES-P-107 Overhead Distribution Systems SAES-P-111 Grounding SAES-P-113 Motors and Generators SAES-P-114 Power System and Equipment Protection SAES-P-116 Switchgear and Control Equipment SAES-P-119 Onshore Substations SAES-P-121 Transformers and Reactors SAES-P-123 Lighting SAES-P-126 Power System Automation SAES-Q-001 Criteria for Design and Construction of Concrete Structures SAES-Q-004 Installation of Piles and Conductors for Offshore Structures SAES-Q-005 Concrete Foundations SAES-Q-006 Asphalt and Sulfur Extended Asphalt Concrete Paving SAES-Q-007 Foundations and Supporting Structures for Heavy Machinery SAES-Q-009 Concrete Retaining Walls SAES-Q-010 Cement Based, Non-Shrink Grout for Structural and Equipment Grouting SAES-Q-011 Epoxy Grout for Machinery Support SAES-Q-012 Criteria for Design and Construction of Precast and Prestressed Concret SAES-R-004 Building Architectural Finishes Requirements SAES-R-004A Appendix A - Architectural Interior Finishes Requirements SAES-R-004B Appendix B - Architectural Interior Requirements/Healthcare Facilities SAES-R-004C Appendix C - Architectural Exterior Finishes Requirements SAES-S-007 Solid Waste Landfill Requirements SAES-S-010 Sanitary Sewers SAES-S-020 Oily Water Drainage Systems SAES-S-030 Storm Water Drainage Systems SAES-S-040 Saudi Aramco Water Systems SAES-S-050 Sprinkler and Standpipe Systems in Buildings SAES-S-060 Saudi Aramco Plumbing Code SAES-S-070 Installation of Utility Piping Systems SAES-T-000 Telecommunications Standards Introduction and Indices SAES-T-018 Telecommunications - Symbols, Abbreviations and Definitions SAES-T-101 Regulated Vendors List for Communications Equipments and Materials SAES-T-151 D.C. Power Systems SAES-T-360 Synchronous Digital Hierarchy Transmission Systems SAES-T-481 In-Plant Voice Paging System SAES-T-492 VHF/UHF Land-Mobile and Fixed Radio Communication SAES-T-493 Digital Trunked Radio System SAES-T-494 Very Small Aperture Terminal (VSAT) Network Design SAES-T-500 Central Office (CO) Digital Telephone Switching Systems SAES-T-521 Circuit Measuring Techniques SAES-T-555 IP Based Closed-Circuit Television (CCTV) SAES-T-556 Circuit Quality and Performance SAES-T-570 Design Residential Telecommunications Infrastructure SAES-T-603 Telecommunications - Safeguards and Warning Devices SAES-T-624 Telecommunications Outside Plant - Fiber Optics SAES-T-625 Inter and Intra Building Fiber Optic Communication Cables SAES-T-628 Telecommunications - Underground Cable SAES-T-629 Telecommunications Buried Cable and Wire SAES-T-631 Communications Cable Terminals SAES-T-632 Communications Cable Splicing SAES-T-633 Communications Splice Closures SAES-T-634 Telecommunications - Cable Testing and Acceptance SAES-T-744 Design Criteria and Installation of Communication Towers SAES-T-795 Communications Facility Grounding Systems SAES-T-820 Narrow-band Videoconferencing Systems SAES-T-830 Voice Frequency Loop Transmission Objectives SAES-T-883 Telecommunications - Inductive Coordination SAES-T-887 Telecommunications: Electrical Coordination - Protection at Power Plant SAES-T-903 Outside Plant Electrical Protection and Grounding SAES-T-906 Telecommunications - Structural Coordination SAES-T-911 Telecommunication Conduit System Design SAES-T-912 Communications Feeder Cable SAES-T-914 Comunications Distribution Cable SAES-T-916 Communications Building Cable SAES-T-919 Submarine Fiber Optic Cable SAES-T-920 Telecommunications Cable Information SAES-T-928 Telecommunications - OSP Buried Plant SAES-T-938 Telecommunications: Outside Plant Systems - Design SAES-W-010 Welding Requirements for Pressure Vessels SAES-W-011 Welding Requirements for On-Plot Piping SAES-W-012 Welding Requirements for Pipelines SAES-W-013 Welding Requirements for Offshore Structures SAES-W-014 Weld Overlays and Welding of Clad Materials SAES-W-015 Strip Lining Application SAES-W-016 Welding of Special Corrosion-Resistant Materials SAES-W-017 Welding Requirements for API Tanks SAES-W-019 Girth Welding Requirements for Clad Pipes SAES-X-300 Cathodic Protection of Marine Structures SAES-X-400 Cathodic Protection of Buried Pipelines SAES-X-500 Cathodic Protection of Vessel and Tank Internals SAES-X-600 Cathodic Protection of Plant Facilities SAES-X-700 Cathodic Protection of Onshore Well Casings SAES-X-800 Cathodic Protection for Existing Reinforced Concrete Structures SAES-Y-100 Regulated Vendors List for Custody Measurement Equipment SAES-Y-101 Custody Metering of Hydrocarbon Gases SAES-Y-103 Royalty/Custody Metering of Hydrocarbon Liquids SAES-Y-301 Royalty/Custody Measurement of Hydrocarbon Liquids using Radar Tan SAES-Y-501 Dynamic Sampling of Hydrocarbon Liquids for Royalty/Custody Transfer SAES-Z-000 Process Control Standards Index SAES-Z-001 Process Control Systems SAES-Z-002 Technically Accepted Process Automation Systems SAES-Z-003 Pipelines Leak Detection Systems SAES-Z-004 Supervisory Control and Data Acquisition (SCADA) System SAES-Z-010 Process Automation Networks SAES-Z-020 Design and Installation of Fiber Optic Cable Systems for Process Contro ments Due Date (March 31 2012)
Committee Title Issue Date
Materials and Corrosion Cont 11-APR-07 Materials and Corrosion Cont 25-AUG-08 Piping 08-AUG-10 Standards Coordination 19-JAN-10 Engineering Knowledge & Res 17-FEB-10 Inspection Engineering 21-APR-09 Inspection Engineering 22-APR-09 Inspection Engineering 22-APR-09 Inspection Engineering 14-JUN-09 Inspection Engineering 26-APR-09 Inspection Engineering 26-APR-09 Inspection Engineering 27-APR-09 Inspection Engineering 27-APR-09 Inspection Engineering 06-JUN-09 Inspection Engineering 06-JUN-09 Inspection Engineering 06-JUN-09 Inspection Engineering 06-JUN-09 Inspection Engineering 06-JUN-09 Inspection Engineering 06-JUN-09 Inspection Engineering 06-JUN-09 Inspection Engineering 06-JUN-09 Inspection Engineering 06-JUN-09 Inspection Engineering 31-JUL-10 Inspection Engineering 04-JUL-10 Environmental 08-DEC-10 Non-Destructive Testing 19-MAY-09 Non-Destructive Testing 19-MAY-09 Non-Destructive Testing 08-MAY-11 Non-Destructive Testing 08-MAY-11 Non-Destructive Testing 20-SEP-08 Inspection Engineering 02-AUG-09 Inspection Engineering 10-JUL-11 Project Management Office D 21-MAR-12 Engineering Knowledge & Res 17-FEB-10 Inspection Engineering 07-SEP-11 Standards Coordination 08-MAY-11 Consulting Services Dept. 13-DEC-11 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Inspection Engineering 04-AUG-08 Inspection Engineering 27-SEP-09 Inspection Engineering 29-JUL-09 Environmental 10-MAR-10 Engineering Knowledge & Res 12-APR-10 Engineering Knowledge & Res 17-FEB-10 Inspection Engineering 02-AUG-09 Inspection Engineering 10-SEP-11 Piping 07-NOV-06 Welding 20-OCT-09 Inspection Engineering 18-AUG-09 Inspection Engineering 19-AUG-09 Inspection Engineering 19-AUG-09 Inspection Engineering 01-NOV-98 Inspection Engineering 19-AUG-09 Inspection Engineering 18-APR-09 Inspection Engineering 05-OCT-08 Inspection Engineering 10-JUN-09 Inspection Engineering 17-JAN-11 Inspection Engineering 01-AUG-09 Inspection Engineering 25-JUL-09 Inspection Engineering 10-JUN-09 Inspection Engineering 10-JUN-09 Inspection Engineering 25-JUL-09 Inspection Engineering 03-DEC-03 Inspection Engineering 26-NOV-07 Inspection Engineering 19-AUG-09 Inspection Engineering 10-JUN-09 Inspection Engineering 25-JUL-09 Inspection Engineering 18-AUG-09 Paints and Coatings 07-MAY-11 Piping 25-MAY-11 Offshore Structures 21-AUG-10 Materials and Corrosion Cont 20-MAR-12 Piping 13-OCT-10 Materials and Corrosion Cont 10-MAY-11 Piping 21-JUN-11 Materials and Corrosion Cont 19-FEB-11 Materials and Corrosion Cont 24-APR-11 Piping 21-JUN-11 Materials and Corrosion Cont 24-APR-11 Materials and Corrosion Cont 04-MAY-11 Materials and Corrosion Cont 06-FEB-12 Materials and Corrosion Cont 13-DEC-11 Materials and Corrosion Cont 21-JUN-11 Materials and Corrosion Cont 21-JUN-11 Materials and Corrosion Cont 29-OCT-11 Materials and Corrosion Cont 13-DEC-11 Materials and Corrosion Cont 21-JUN-11 Materials and Corrosion Cont 17-JUL-10 Materials and Corrosion Cont 13-DEC-11 Materials and Corrosion Cont 01-MAR-11 Piping 21-FEB-12 Materials and Corrosion Cont 21-JUN-11 Materials and Corrosion Cont 10-MAY-11 Inspection Engineering 02-AUG-09 Materials and Corrosion Cont 20-FEB-12 Materials and Corrosion Cont 06-SEP-11 Piping 13-FEB-12 Piping 01-FEB-12 Piping 09-AUG-11 Materials and Corrosion Cont 21-JUN-11 Materials and Corrosion Cont 20-NOV-11 Valves 11-OCT-10 Valves 11-OCT-10 Valves 11-OCT-10 Valves 11-OCT-10 Valves 20-FEB-12 Valves 11-OCT-10 Valves 11-OCT-10 Valves 11-OCT-10 Valves 17-MAY-11 Valves 11-OCT-10 Valves 11-OCT-10 Valves 11-OCT-10 Valves 11-OCT-10 Valves 11-OCT-10 Valves 11-OCT-10 Plumbing and Utilities 21-JUN-11 Materials and Corrosion Cont 11-SEP-11 Onshore Structures 21-JUN-11 Paints and Coatings 22-JUN-11 Paints and Coatings 22-JUN-11 Paints and Coatings 22-JUN-11 Paints and Coatings 12-JUL-11 Paints and Coatings 13-JUL-11 Paints and Coatings 13-JUL-11 Paints and Coatings 21-MAR-12 Paints and Coatings 16-JUL-11 Paints and Coatings 16-JUL-11 Onshore Structures 16-JUL-11 Paints and Coatings 17-JUL-11 Paints and Coatings 27-MAR-12 Civil 19-DEC-10 Paints and Coatings 25-OCT-11 Paints and Coatings 27-MAR-12 Paints and Coatings 15-OCT-11 Onshore Structures 15-MAR-11 Paints and Coatings 01-OCT-11 Paints and Coatings 04-OCT-11 Civil 19-DEC-10 Civil 11-OCT-11 Paints and Coatings 11-OCT-11 Paints and Coatings 11-OCT-11 Paints and Coatings 22-MAY-11 Paints and Coatings 21-MAY-11 Paints and Coatings 27-MAR-12 Paints and Coatings 22-MAY-11 Paints and Coatings 11-JUN-11 Paints and Coatings 22-MAY-11 Inspection Engineering 18-APR-09 Materials and Corrosion Cont 07-MAY-11 Onshore Structures 17-MAY-11 Onshore Structures 09-MAY-11 Onshore Structures 10-MAY-11 Materials and Corrosion Cont 14-MAY-11 Materials and Corrosion Cont 15-MAY-11 Materials and Corrosion Cont 16-MAY-11 Compressors, Gears and Ste 16-MAY-07 Compressors, Gears and Ste 09-SEP-06 Electrical Substations Equip 22-SEP-08 Electrical Substations Equip 31-JUL-10 Electrical Substations Equip 22-SEP-08 Electrical Substations Equip 11-OCT-08 Electrical Systems Designs 20-OCT-08 Electrical Systems Designs 19-OCT-08 Electrical Systems Designs 19-OCT-08 Inspection Engineering 18-APR-09 Inspection Engineering 18-APR-09 Electrical Systems Designs 19-OCT-08 Electrical Systems Designs 25-MAR-12 Electrical Systems Designs 25-MAR-12 Inspection Engineering 18-APR-09 Electrical Substations Equip 08-AUG-10 Electrical Substations Equip 19-OCT-08 Electrical Substations Equip 18-OCT-09 Electrical Substations Equip 27-SEP-11 Electrical Substations Equip 21-FEB-11 Electrical Substations Equip 31-JUL-10 Electrical Substations Equip 14-OCT-08 Electrical Substations Equip 29-NOV-11 Electrical Systems Designs 06-FEB-11 Electrical Systems Designs 23-DEC-09 Electrical Substations Equip 14-OCT-08 Motors and Generators 01-NOV-08 Electrical Substations Equip 01-OCT-11 Electrical Substations Equip 14-OCT-08 Electrical Systems Designs 19-OCT-08 Electrical Substations Equip 12-NOV-08 Electrical Substations Equip 10-APR-11 Electrical Substations Equip 10-OCT-11 Inspection Engineering 18-APR-09 Cathodic Protection 30-MAR-05 Cathodic Protection 28-DEC-11 Cathodic Protection 28-FEB-10 Cathodic Protection 31-DEC-11 Cathodic Protection 31-MAR-08 Cathodic Protection 13-DEC-11 Cathodic Protection 06-SEP-11 Cathodic Protection 28-DEC-11 Motors and Generators 10-MAR-12 Motors and Generators 27-FEB-11 Motors and Generators 10-MAR-12 UPS, DC Systems and Power 20-OCT-08 UPS, DC Systems and Power 20-OCT-08 Electrical Substations Equip 14-OCT-08 UPS, DC Systems and Power 20-OCT-08 Motors and Generators 23-FEB-11 Motors and Generators 10-MAR-12 Motors and Generators 28-SEP-05 Communications 06-NOV-10 Communications 23-JAN-11 Welding 13-FEB-12 Loss Prevention 02-SEP-09 Fire Protection Dept. 21-NOV-11 Fire Protection Dept. 28-NOV-11 Loss Prevention 15-APR-09 Fire Protection Dept. 28-NOV-11 Fire Protection Dept. 15-NOV-06 Fire Protection Dept. 15-NOV-06 Loss Prevention 15-APR-09 Materials and Corrosion Cont 05-DEC-11 Materials and Corrosion Cont 05-DEC-11 Process Control 19-OCT-10 Process Control 24-OCT-09 Process Control 10-SEP-11 Process Control 24-OCT-09 Process Control 24-OCT-09 Process Control 24-OCT-09 Process Control 14-SEP-09 Process Control 24-OCT-09 Process Control 20-DEC-09 Communications 19-OCT-09 Lubrication Systems and Lubr 17-MAR-09 Lubrication Systems and Lubr 17-MAR-09 Lubrication Systems and Lubr 17-MAR-09 Lubrication Systems and Lubr 17-MAR-09 Lubrication Systems and Lubr 17-MAR-09 Lubrication Systems and Lubr 17-MAR-09 Lubrication Systems and Lubr 17-MAR-09 Lubrication Systems and Lubr 17-MAR-09 Lubrication Systems and Lubr 17-MAR-09 Lubrication Systems and Lubr 17-MAR-09 Lubrication Systems and Lubr 16-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 31-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 28-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 28-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Lubrication Systems and Lubr 25-MAR-09 Flow Assurance 28-JUN-10 Inspection Engineering 22-AUG-09 HVAC 27-DEC-06 HVAC 27-MAY-06 HVAC 27-MAR-12 HVAC 18-APR-10 HVAC 14-MAY-11 Fire Protection Dept. 28-NOV-11 Fire Protection Dept. 30-NOV-04 Industrial Security 24-AUG-09 Industrial Security 24-AUG-09 Industrial Security 21-MAR-07 Industrial Security 25-AUG-09 Fire Protection Dept. 28-NOV-11 Fire Protection Dept. 28-NOV-11 Gas Turbines and Diesel Eng 10-JUL-11 Compressors, Gears and Ste 09-AUG-09 Compressors, Gears and Ste 30-SEP-09 Compressors, Gears and Ste 18-OCT-09 Pumps, Seals and Mixers 26-JUL-09 Compressors, Gears and Ste 10-APR-11 Pumps, Seals and Mixers 30-NOV-08 Pumps, Seals and Mixers 13-OCT-08 Pumps, Seals and Mixers 01-DEC-08 Inspection Engineering 18-APR-09 Compressors, Gears and Ste 16-MAY-07 Vessels 13-DEC-11 Vessels 15-JAN-12 Vessels 26-JAN-11 Vessels 16-SEP-08 Heat Transfer Equipment 23-JUN-10 Gas Turbines and Diesel Eng 12-MAY-08 Compressors, Gears and Ste 26-JAN-09 Compressors, Gears and Ste 23-DEC-09 Heat Transfer Equipment 23-JUN-10 Lubrication Systems and Lubr 02-JUL-08 Compressors, Gears and Ste 10-APR-11 Pumps, Seals and Mixers 09-JUN-10 Heat Transfer Equipment 06-SEP-08 Trays and Packing Process D 14-NOV-09 Heat Transfer Equipment 27-JAN-10 Flare Systems Design 18-FEB-12 Heat Transfer Equipment 06-SEP-08 Heat Transfer Equipment 23-JUN-10 Heat Transfer Equipment 19-DEC-09 Vessels 13-DEC-11 Vessels 02-NOV-11 Materials and Corrosion Cont 06-SEP-08 Materials and Corrosion Cont 23-MAY-09 Heat Transfer Equipment 26-DEC-09 Vessels 15-JAN-12 Materials and Corrosion Cont 01-NOV-11 Gas Turbines and Diesel Eng 01-DEC-07 Custody Measurement 14-OCT-09 Custody Measurement 17-SEP-07 Instrumentation 21-JUN-09 Instrumentation 29-JAN-12 Custody Measurement 21-DEC-11 Custody Measurement 28-NOV-10 Custody Measurement 28-JAN-12 Custody Measurement 02-MAY-09 Custody Measurement 10-APR-11 Custody Measurement 17-APR-11 Instrumentation 04-MAR-12 Instrumentation 14-DEC-11 Custody Measurement 27-MAR-12 Instrumentation 28-JUN-10 Instrumentation 06-JUN-11 Instrumentation 26-JAN-09 Instrumentation 13-DEC-11 Instrumentation 13-DEC-11 Custody Measurement 28-NOV-10 Instrumentation 09-AUG-09 Instrumentation 27-APR-11 Instrumentation 04-MAR-12 Instrumentation 25-OCT-11 Instrumentation 01-DEC-10 Instrumentation 06-JAN-09 Instrumentation 27-DEC-08 Instrumentation 18-AUG-09 Instrumentation 28-JUN-10 Instrumentation 24-AUG-11 Instrumentation 04-JAN-12 Instrumentation 13-DEC-11 Instrumentation 01-JAN-12 Instrumentation 23-JAN-12 Instrumentation 05-MAR-12 Instrumentation 06-SEP-11 Instrumentation 01-NOV-10 Instrumentation 21-JUN-09 Instrumentation 06-FEB-12 Custody Measurement 02-MAY-09 Custody Measurement 19-OCT-09 Custody Measurement 02-MAY-09 Custody Measurement 03-MAY-09 Instrumentation 22-MAY-10 Instrumentation 24-JAN-12 Energy Optimization & Cogen 30-SEP-02 Drilling Workover Wellhead a 29-JAN-11 Drilling Workover Wellhead a 23-JAN-12 Drilling and Workover Engine 23-JAN-12 Drilling Workover Wellhead a 23-JAN-12 Drilling Workover Wellhead a 23-JAN-12 Drilling Workover Wellhead a 11-MAR-12 Electric Submersible Pump 26-APR-11 Electric Submersible Pump 26-APR-11 Electric Submersible Pump 26-APR-11 Electric Submersible Pump 27-APR-11 Offshore Structures 23-MAY-11 Materials and Corrosion Cont 31-JUL-05 Process and Control Systems 12-MAR-11 Process and Control Systems 06-MAR-11 Process and Control Systems 12-MAR-11 Process and Control Systems 12-MAR-11 Process and Control Systems 12-MAR-11 Process and Control Systems 16-MAR-11 Process and Control Systems 16-MAR-11 Materials and Corrosion Cont 08-SEP-09 Materials and Corrosion Cont 01-JUL-07 Materials and Corrosion Cont 25-JUN-07 Materials and Corrosion Cont 27-APR-08 Materials and Corrosion Cont 08-MAR-10 Materials and Corrosion Cont 12-MAR-08 Materials and Corrosion Cont 06-SEP-08 Energy Optimization & Cogen 12-MAR-11 Civil 28-FEB-09 Materials and Corrosion Cont 06-JAN-09 Materials and Corrosion Cont 17-JUL-10 Materials and Corrosion Cont 14-SEP-09 Materials and Corrosion Cont 27-JAN-10 Process and Control Systems 12-MAR-11 Other 05-JUL-10 Process and Control Systems 18-SEP-11 Materials and Corrosion Cont 04-DEC-11 Other 12-FEB-12 Trays and Packing Process D 29-JUN-11 Vessels 27-MAR-08 Heat Transfer Equipment 23-NOV-10 Heat Transfer Equipment 20-APR-10 Consulting Services Dept. 07-FEB-07 Heat Transfer Equipment 05-OCT-08 Heat Transfer Equipment 14-NOV-10 Pumps, Seals and Mixers 25-JUL-09 Consulting Services Dept. 31-OCT-04 Consulting Services Dept. 31-OCT-04 Consulting Services Dept. 29-DEC-04 Consulting Services Dept. 22-AUG-10 Consulting Services Dept. 30-MAR-05 Consulting Services Dept. 31-JUL-05 Consulting Services Dept. 31-JAN-06 Consulting Services Dept. 31-JAN-06 Gas Turbines and Diesel Eng 14-APR-07 Lubrication Systems and Lubr 19-JUL-08 Pumps, Seals and Mixers 01-JUL-07 Pumps, Seals and Mixers 08-OCT-07 Consulting Services Dept. 08-JUN-08 Pumps, Seals and Mixers 16-NOV-08 Pumps, Seals and Mixers 20-OCT-09 Pumps, Seals and Mixers 11-MAY-10 Compressors, Gears and Ste 25-OCT-10 Consulting Services Dept. 18-OCT-10 Paints and Coatings 24-JUN-09 Paints and Coatings 21-MAR-10 Paints and Coatings 20-FEB-11 Instrumentation 30-JAN-11 Instrumentation 05-JUN-11 HVAC 17-MAY-09 Consulting Services Dept. 11-JUL-07 HVAC 01-APR-09 Gas Turbines and Diesel Eng 11-NOV-07 Compressors, Gears and Ste 07-MAY-11 Piping 28-JAN-07 Piping 19-MAY-07 Materials and Corrosion Cont 09-JAN-10 Materials and Corrosion Cont 09-JAN-10 Piping 05-SEP-09 Piping 31-JAN-10 Materials and Corrosion Cont 29-MAR-10 Materials and Corrosion Cont 29-MAR-10 Piping 01-NOV-11 Piping 18-FEB-12 Offshore Structures 11-MAY-08 Onshore Structures 31-MAY-05 Onshore Structures 11-NOV-06 Consulting Services Dept. 31-MAY-06 Consulting Services Dept. 05-JUN-06 Consulting Services Dept. 30-JUN-06 Electrical Substations Equip 03-APR-10 Consulting Services Dept. 28-OCT-06 Consulting Services Dept. 08-OCT-06 Consulting Services Dept. 21-JAN-07 Electrical Substations Equip 15-JAN-07 Motors and Generators 03-JAN-09 Electrical Substations Equip 07-JAN-08 Electrical Systems Designs 11-DEC-07 Electrical Substations Equip 13-JAN-08 Motors and Generators 10-JUN-08 Motors and Generators 07-JAN-08 Electrical Substations Equip 12-MAY-08 Process and Control Systems 12-MAR-11 Motors and Generators 22-NOV-09 Motors and Generators 03-JAN-09 Electrical Substations Equip 15-FEB-11 Electrical Systems Designs 06-DEC-09 Electrical Substations Equip 15-FEB-10 Electrical Substations Equip 09-MAR-10 UPS, DC Systems and Power 23-FEB-10 UPS, DC Systems and Power 23-FEB-10 UPS, DC Systems and Power 23-FEB-10 UPS, DC Systems and Power 23-FEB-10 Electrical Substations Equip 11-JUN-11 Electrical Substations Equip 26-MAR-11 UPS, DC Systems and Power 29-MAY-11 UPS, DC Systems and Power 28-MAY-11 UPS, DC Systems and Power 28-MAY-11 Motors and Generators 31-DEC-11 Electrical Systems Designs 06-SEP-11 Onshore Structures 24-MAY-09 Onshore Structures 31-JAN-05 Onshore Structures 30-APR-05 Onshore Structures 06-NOV-07 Onshore Structures 26-MAR-08 Consulting Services Dept. 02-OCT-06 Onshore Structures 30-JUL-08 Onshore Structures 28-FEB-05 Onshore Structures 20-SEP-10 Civil 15-SEP-10 Communications 29-NOV-11 Welding 31-MAR-08 Welding 11-Dec-11 Cathodic Protection 24-SEP-07 Cathodic Protection 26-NOV-07 Cathodic Protection 01-APR-12 Cathodic Protection 25-AUG-10 Process Control 02-JAN-12 Process Control 09-MAR-10 Process Control 17-NOV-07 Process Control 17-NOV-07 Process Control 17-NOV-07 Process Control 17-NOV-07 Process Control 17-NOV-07 Process Control 17-NOV-07 Process Control 17-NOV-07 Process Control 17-NOV-07 Process Control 17-NOV-07 Process Control 17-NOV-07 Process Control 17-NOV-07 Process Control 17-NOV-07 Process Control 11-JAN-09 Process Control 24-OCT-09 Process Control 09-MAR-10 Process Control 09-MAR-10 Process Control 09-MAR-10 Process Control 09-MAR-10 Process and Control Systems 21-NOV-06 Process Control 23-OCT-11 Facilities Planning Dept. 30-JUN-04 Project Management Office D 30-APR-07 Materials and Corrosion Cont 02-AUG-11 Materials and Corrosion Cont 23-AUG-11 Materials and Corrosion Cont 01-NOV-11 Instrumentation 19-AUG-08 Materials and Corrosion Cont 12-JAN-09 Process Control 02-OCT-10 Inspection Engineering 14-JUN-09 Inspection Engineering 01-JUL-08 Inspection Engineering 01-JUL-08 Inspection Engineering 26-APR-09 Non-Destructive Testing 21-AUG-11 Inspection Engineering 02-AUG-09 Inspection Engineering 02-AUG-09 Inspection Engineering 15-MAR-10 Standards Coordination 15-OCT-08 Project Management Office D 19-JUN-11 Safety and Security 16-SEP-08 Paints and Coatings 04-SEP-11 Project Management Office D 06-FEB-11 Standards Coordination 15-OCT-08 Environmental 03-MAR-09 Consulting Services Dept. 04-JAN-06 Standards Coordination 04-MAR-09 Process Control 09-OCT-10 Facilities Planning Dept. 15-NOV-11 Electrical Substations Equip 31-MAY-11 Project Management Office D 13-FEB-11 Training and Development 27-AUG-11 Process and Control Systems 15-MAY-10 Process Control 15-MAY-10 Process Control 24-OCT-09 Process Control 24-OCT-09 Process Control 18-JAN-12 Process Control 16-SEP-09 Process Control 16-SEP-09 Process Control 16-SEP-09 Process Control 16-SEP-09 Process Control 16-SEP-09 Process Control 16-SEP-09 Process Control 14-SEP-09 Process Control 31-JUL-11 Process and Control Systems 12-JUL-10 Environmental 31-DEC-08 Materials and Corrosion Cont 23-AUG-11 Process and Control Systems 07-JUL-09 Process and Control Systems 12-OCT-10 Technical Information Center 12-APR-10 Custody Measurement 28-APR-09 Custody Measurement 22-MAY-11 Project Management Office D 15-AUG-06 Process Control 24-OCT-09 Project Management Office D 22-APR-07 Process and Control Systems 19-JUL-09 Custody Measurement 07-SEP-11 Valves 24-NOV-10 Standards Coordination 16-FEB-08 Standards Coordination 04-JAN-09 Standards Coordination 04-JAN-09 Engineering Knowledge & Res 17-FEB-10 Piping 29-JUN-05 Piping 29-JUN-05 Inspection Engineering 10-APR-11 Inspection Engineering 18-JAN-11 Piping 14-MAR-12 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Project & Strategic Purchasin 19-NOV-08 Piping 13-SEP-09 Inspection Engineering 04-AUG-08 Inspection Engineering 09-JUN-10 Inspection Engineering 04-AUG-08 Inspection Engineering 13-MAY-07 Environmental 14-FEB-11 Inspection Engineering 01-JUL-08 Inspection Engineering 01-JUL-08 Inspection Engineering 01-JUL-08 Project Management Office D 27-APR-11 Project Management Office D 23-NOV-05 Project Management Office D 23-NOV-05 Project Management Office D 23-NOV-05 Cathodic Protection 25-DEC-11 Cathodic Protection 25-DEC-11 Cathodic Protection 13-DEC-11 Cathodic Protection 31-JUL-04 Heat Transfer Equipment 10-MAR-09 Environmental 11-MAY-10 Environmental 05-JUN-10 Pumps, Seals and Mixers 26-JUL-09 Materials and Corrosion Cont 23-JAN-12 Materials and Corrosion Cont 23-JUL-11 Process Control 24-OCT-09 Valves 02-DEC-10 UPS, DC Systems and Power 12-SEP-09 High Integrity Protective Sys 09-OCT-10 Materials and Corrosion Cont 11-APR-09 Materials and Corrosion Cont 12-JUL-11 Environmental 08-DEC-10 Custody Measurement 02-JAN-12 Facilities Planning Dept. 25-JUN-11 Paints and Coatings 31-MAY-05 Process and Control Systems 23-DEC-09 Process and Control Systems 01-DEC-09 Pumps, Seals and Mixers 06-SEP-11 Onshore Structures 10-MAR-09 Project Management Office D 24-APR-11 Process Control 15-JAN-11 Welding 22-OCT-11 Environmental 16-MAR-09 Environmental 17-MAY-11 Inspection Engineering 10-SEP-11 Inspection Engineering 06-SEP-11 Inspection Engineering 06-SEP-11 Inspection Engineering 06-SEP-11 Inspection Engineering 28-NOV-11 Inspection Engineering 06-SEP-11 Inspection Engineering 10-APR-11 Inspection Engineering 28-JAN-12 Environmental 28-JAN-12 Process and Control Systems 30-NOV-11 Process and Control Systems 30-NOV-11 Custody Measurement 15-MAR-10 Flow Assurance 13-JUN-10 Flow Assurance 26-JUN-10 Communications 06-SEP-11 Communications 15-MAY-10 Communications 06-SEP-11 Communications 01-JUN-08 Process Control 25-MAR-12 Communications 06-NOV-10 Inspection Engineering 30-JAN-11 Standards Coordination 21-MAR-10 Materials and Corrosion Cont 27-SEP-11 Equipment Specific P&ID Te 06-APR-08 Project Management Office D 30-APR-07 Environmental 10-MAR-10 Environmental 06-SEP-11 Environmental 28-DEC-11 Environmental 19-APR-10 Onshore Structures 28-SEP-08 Environmental 20-NOV-07 Environmental 07-DEC-11 Onshore Structures 11-MAY-09 Onshore Structures 23-FEB-10 Environmental 20-NOV-07 Engineering Knowledge & Res 09-JUN-10 Onshore Structures 28-APR-09 Materials and Corrosion Cont 10-MAR-12 Materials and Corrosion Cont 30-APR-11 Process and Control Systems 18-FEB-08 Materials and Corrosion Cont 17-NOV-08 Environmental 12-APR-11 Terminal Dept. 12-OCT-09 Industrial Drainage 23-JAN-11 Industrial Drainage 15-MAY-11 Industrial Drainage 30-JUN-10 Loss Prevention 14-JUN-11 Loss Prevention 20-NOV-11 Loss Prevention 15-APR-09 Loss Prevention 15-MAR-06 Loss Prevention 29-FEB-04 Loss Prevention 15-MAR-06 Loss Prevention 17-MAY-11 Loss Prevention 14-MAY-11 Loss Prevention 20-SEP-08 Loss Prevention 29-AUG-10 Loss Prevention 25-MAR-12 Loss Prevention 29-AUG-10 Loss Prevention 29-AUG-10 Loss Prevention 23-JAN-12 Loss Prevention 22-JUN-08 Loss Prevention 23-JUL-09 Loss Prevention 29-AUG-10 Loss Prevention 11-MAY-11 Loss Prevention 17-FEB-10 Loss Prevention 28-APR-09 Loss Prevention 23-JAN-12 Loss Prevention 06-FEB-12 Trays and Packing Process D 14-NOV-09 Vessels 13-DEC-11 Vessels 17-MAY-11 Vessels 29-JAN-11 Vessels 27-SEP-11 Vessels 29-JAN-11 Vessels 13-DEC-11 Vessels 13-DEC-11 Environmental 12-APR-10 Heat Transfer Equipment 30-MAR-05 Heat Transfer Equipment 18-MAY-09 Heat Transfer Equipment 31-MAY-05 Heat Transfer Equipment 18-MAY-09 Heat Transfer Equipment 18-MAY-09 Heat Transfer Equipment 08-NOV-06 Heat Transfer Equipment 29-JUN-10 Flare Systems Design 10-JUL-11 Pumps, Seals and Mixers 28-JUL-09 Pumps, Seals and Mixers 30-NOV-08 Pumps, Seals and Mixers 13-OCT-08 Pumps, Seals and Mixers 11-OCT-09 Lubrication Systems and Lubr 28-JUL-09 Lubrication Systems and Lubr 17-MAR-09 Paints and Coatings 10-APR-11 Paints and Coatings 08-MAY-11 Paints and Coatings 13-DEC-11 Paints and Coatings 12-OCT-05 Paints and Coatings 07-JUL-10 Paints and Coatings 19-APR-09 Paints and Coatings 11-AUG-07 Paints and Coatings 24-OCT-11 Paints and Coatings 16-NOV-11 Paints and Coatings 25-OCT-11 Electric Submersible Pump 26-APR-11 Electric Submersible Pump 26-APR-11 Instrumentation 10-DEC-11 Instrumentation 08-JAN-12 Instrumentation 25-MAR-12 Instrumentation 10-DEC-11 Instrumentation 27-FEB-12 Instrumentation 22-JAN-12 Instrumentation 08-OCT-08 Instrumentation 25-DEC-11 Instrumentation 10-OCT-11 Instrumentation 04-MAY-11 Instrumentation 17-JAN-12 Instrumentation 26-JAN-09 Instrumentation 22-SEP-10 Instrumentation 08-FEB-09 Instrumentation 29-FEB-12 Instrumentation 28-JUN-10 Instrumentation 15-OCT-11 Instrumentation 06-SEP-08 Instrumentation 04-MAR-12 Instrumentation 06-SEP-11 Instrumentation 26-DEC-10 Instrumentation 29-JUN-09 Instrumentation 06-SEP-11 Instrumentation 26-JAN-10 Instrumentation 22-SEP-10 Instrumentation 31-MAY-11 HVAC 10-MAR-12 HVAC 31-MAY-04 HVAC 19-DEC-10 HVAC 27-MAR-12 HVAC 31-MAY-04 HVAC 13-DEC-11 Compressors, Gears and Ste 15-JUN-11 Gas Turbines and Diesel Eng 21-NOV-09 Compressors, Gears and Ste 13-NOV-10 Compressors, Gears and Ste 11-AUG-09 Compressors, Gears and Ste 21-NOV-09 Compressors, Gears and Ste 19-DEC-10 Gas Turbines and Diesel Eng 18-FEB-08 Gas Turbines and Diesel Eng 19-DEC-09 Pumps, Seals and Mixers 09-JUN-10 Piping 20-FEB-12 Materials and Corrosion Cont 05-MAR-11 Valves 18-FEB-12 Piping 22-AUG-11 Valves 11-OCT-10 Piping 28-APR-09 Piping 05-JAN-11 Piping 29-JUN-10 Piping 22-FEB-12 Materials and Corrosion Cont 23-JUL-11 Materials and Corrosion Cont 10-MAY-11 Materials and Corrosion Cont 23-JAN-12 Materials and Corrosion Cont 19-DEC-11 Piping 16-MAR-11 Piping 25-APR-10 Piping 29-APR-07 Piping 22-APR-09 Piping 05-JUN-10 Piping 02-NOV-08 Onshore Structures 27-SEP-09 Piping 31-DEC-11 Piping 06-MAY-09 Piping 08-FEB-09 Piping 21-MAR-10 Piping 10-FEB-09 Piping 16-MAY-07 Offshore Structures 23-MAY-11 Onshore Structures 19-DEC-10 Offshore Structures 11-MAY-11 Civil 04-JUL-10 Onshore Structures 19-OCT-05 Onshore Structures 06-SEP-11 Heat Transfer Equipment 06-SEP-08 Onshore Structures 07-OCT-08 Heat Transfer Equipment 30-JAN-07 Heat Transfer Equipment 30-JAN-07 Heat Transfer Equipment 30-JAN-07 Heat Transfer Equipment 30-JAN-07 Heat Transfer Equipment 30-JAN-07 Safety and Security 10-MAR-12 Safety and Security 10-MAR-12 Safety and Security 10-MAR-12 Safety and Security 10-MAR-12 Safety and Security 10-MAR-12 Safety and Security 10-MAR-12 Safety and Security 10-MAR-12 Safety and Security 10-MAR-12 Safety and Security 10-MAR-12 Safety and Security 10-MAR-12 Safety and Security 10-MAR-12 Safety and Security 10-MAR-12 Electrical Systems Designs 01-MAR-11 Electrical Substations Equip 16-SEP-08 UPS, DC Systems and Power 20-OCT-08 Electrical Systems Designs 08-AUG-10 Electrical Systems Designs 19-OCT-08 Electrical Systems Designs 02-MAR-11 Motors and Generators 21-NOV-09 Electrical Systems Designs 19-OCT-08 Electrical Substations Equip 05-OCT-09 Electrical Substations Equip 05-OCT-09 Electrical Substations Equip 22-SEP-08 Electrical Systems Designs 02-MAR-11 Electrical Systems Designs 25-JAN-11 Civil 15-MAY-10 Offshore Structures 05-JUL-10 Onshore Structures 28-JUN-09 Civil 23-FEB-11 Onshore Structures 04-APR-09 Onshore Structures 28-SEP-08 Civil 22-AUG-09 Civil 22-AUG-09 Civil 11-JUL-06 Architectural Engineering 02-JUN-09 Architectural Engineering 02-JUN-09 Architectural Engineering 02-JUN-09 Architectural Engineering 02-JUN-09 Environmental 01-AUG-09 Plumbing and Utilities 21-NOV-09 Plumbing and Utilities 13-MAR-11 Civil 16-MAR-11 Plumbing and Utilities 10-MAR-12 Plumbing and Utilities 27-JAN-07 Plumbing and Utilities 28-JAN-04 Plumbing and Utilities 09-FEB-11 Communications 23-MAR-10 Communications 09-JUN-10 Communications 03-NOV-09 Communications 05-JUN-11 Communications 08-JUN-11 Communications 12-JUN-11 Communications 08-MAR-09 Communications 13-DEC-11 Communications 20-MAR-10 Communications 25-MAR-09 Communications 05-JUN-11 Communications 30-NOV-11 Communications 12-JUN-10 Communications 13-APR-11 Communications 13-JUN-10 Communications 03-NOV-09 Communications 02-JUN-09 Communications 10-OCT-11 Communications 11-MAY-09 Communications 04-MAY-09 Communications 06-SEP-09 Communications 07-JUN-11 Communications 21-FEB-11 Communications 10-SEP-11 Communications 27-JAN-09 Communications 18-JAN-09 Communications 04-JAN-09 Communications 15-JUN-10 Communications 12-JUN-11 Communications 12-JUN-11 Communications 07-JUN-11 Communications 15-JAN-11 Communications 08-JUN-11 Communications 16-JUN-10 Communications 12-JUN-11 Communications 31-JAN-10 Communications 14-FEB-09 Communications 20-MAY-09 Communications 10-MAR-09 Welding 04-OCT-09 Welding 04-OCT-09 Welding 05-OCT-09 Welding 15-DEC-09 Welding 13-DEC-11 Welding 13-DEC-11 Welding 04-OCT-09 Welding 13-DEC-11 Welding 10-OCT-11 Cathodic Protection 02-SEP-09 Cathodic Protection 13-DEC-11 Cathodic Protection 02-SEP-09 Cathodic Protection 02-SEP-09 Cathodic Protection 07-OCT-09 Cathodic Protection 02-SEP-09 Custody Measurement 18-JAN-12 Custody Measurement 31-MAY-11 Custody Measurement 02-MAY-09 Custody Measurement 06-SEP-11 Custody Measurement 02-MAY-09 Process Control 24-OCT-09 Process Control 25-OCT-10 Process Control 23-JAN-12 Process Control 24-OCT-09 Process Control 25-OCT-10 Process Control 10-SEP-11 Process Control 24-OCT-09