Professional Documents
Culture Documents
Kiran Jose Paul Raj - Old
Kiran Jose Paul Raj - Old
Piping Engineer
Oil & Gas, Petrochemical & Chemical
Experience with Atkins, a member of SNC-Lavalin group (October 2019 – April 2020) – Sharjah-
UAE
Piping Engineer:
Projects involved:
Kiran Jose Paul Raj │Error! No document variable supplied.Error! No document variable supplied. CV │April
2020 41
1. Feed for Modification of Seawater intake facility of LNG train 1,2&3 (ADNOC LNG,
DAS Island):
Developing plot plan and layouts.
Preparing project design basis.
Preparing Piping Material specification, Valve and speciality items datasheets.
Guiding the designer to prepare Isometrics and other drawings.
Piping MTO, EPC Scope of work, FEED report.
Co-ordinating with inter-departments like process, mechanical, instrumentation and
civil.
3. Estimation for Shedgum and Uthmaniyah Gas plant project bidding (Saudi Aramco).
Saudi Aramco plans to construct three Gas Compression Plants (GCP) located at
Shedgum and Uthmaniyah areas.
Estimation included extensive calculation of pipes, fittings, valves in the scope.
Prepared MR material-wise for cost estimation purpose.
Experience with NesteJacobs (July 2015 – September 2019)- Abu Dhabi- UAE
Design Engineer, Layout & Piping:
Projects involved:
1. 42” Flare Pipe replacement project BAB CDS: ADNOC Onshore (Detail
Eng).
Kiran Jose Paul Raj │Error! No document variable supplied.Error! No document variable supplied. CV │April
2020 42
1. FUNDABAC Filter unit in Venator Tio2 plant (FEED and Detail Engg), Finland.
Plot plan and equipment location plan for LPG and APH(Air-preheater) units.
PMS and datasheets of valves, speciality items.
Reviewing of piping layout, GA’s.
Participation in plot plan review and design review sessions.
Worked closely with lead engineer on site survey and Tie-in verification.
Isometric preparation and checking.
MTO preparation and checking.
Assisted in constructability study of the new Air-preheater unit, LPG unit and other vessels and
equipment in the project.
Kiran Jose Paul Raj │Error! No document variable supplied.Error! No document variable supplied. CV │April
2020 43
5. Propylene Production Upgrade- Borealis Finland: Detail Eng.
Handled the overall responsibility for Tie-in packages which included approx. 150 Tie
packages.
Successfully coordinated remote office team that worked on the Tie-package preparation.
Solving queries of the remote office team by clarifying the Tie-in issues with the respective
designer.
Handled effectively the difficult and congested brown field Tie-ins and got appreciation from
the client.
Prepared the location drawing for Tie-ins.
Experience with Power infra project contracting LLC- Abu Dhabi UAE (Aug 2013 – June 2015)
Piping Engineering Trainee:
Projects involved:
Kiran Jose Paul Raj │Error! No document variable supplied.Error! No document variable supplied. CV │April
2020 44