CONSTRUCTION METHODOLOGY ON BONDING NEW TO OLD CONCRETE
In construction, there is always a time that happens unexpectedly the need to bond
hardened concrete with fresh concrete pouring/overlay especially when circumstances
are unexpected and beyond the control of the Contractor. Some circumstances are
inadequate supply of concrete or sudden breakdown of machinery. This is where we
ate attest of strategic and immediate solutions.
Proper bonding is very important when fresh concrete is used to overlay an existing
hardened concrete. This construction feature is usually encountered during concrete
slab pouring. Proper bonding is guaranteed by considering precautions and proper
approach.
For adequate bonding, it is very important to prepare the surface of the hardened
concrete adequately. Preparation of the surface usually involves roughening of the
surface and removal of dirt on the existing concrete, Old concrete surface should be
firm, clean and free from loosened particles. This can be done by using chipping
hammers or wire brushing the surface. After this is done, the exposed concrete surface
can be cleaned by using pressurized water, air or any other methods applicable.
‘After surface preparation, the need to apply properly bonding agents of the surface on
the existing concrete in order to facilitate the bonding. Epoxy bonding agents or
cementitious grout can be used or both agents can be applied.
To execute the corrective measures, provide the angle key pattern of standard
structural construction joint not perfectly to attain the S-pattern but strongly to
emphasize the additional extra shear bar and attaining a pattern adequate to function
and bonding of joint between old and new concrete. (See attached blow-up detail)
In particular, shown with this is the Omicron/Tekton Construction Corporation-Joint
Venture proposed methodology for the continuity of pouring the slab for Capitol
Project. Following are the guides to be used in casting a topping layer of fresh concrete
on old concrete.
. Prepare the surface properly.
. Clear and clean.
. Use bonding agents approved by the Designer (JV to use cementitious grout.
Product Data Sheet is attached.)
4, Follow the attached/sketch drawing for a finish joint accuracy. (see attached)
5. Thorough inspection during this process until its application progress.
wNeGANIVLAY 3d OL
ALAYONOD SO NOILYOd
G3AOW3e 39d OL
SLAYONOO AO NOILYOd
SS (aaunod 3g OL)
SLFYONOD ONILSIXS
OL AXOd3 HIM GaTWeG__
D0 wwUi9dT Ouwgsz
SLBYONOO MSN JO ONINNOd
OL YOld AXOd3 SLAYONOD
Alddv 8 3OV4NNS NAHONOY
ALSYONOD MAN JO ONINNOd
OL YOId HSNYE THALS /M SYVEaY
NV319 8 ALHYONOD SS3OXA SAOWSY
‘S.LON