Professional Documents
Culture Documents
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
1
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 6/7/2012
STATE DAYS
Texas 2
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
2
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 6/8/2012
STATE DAYS
Texas 3
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
3
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 6/9/2012
STATE DAYS
Texas 4
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
4
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 6/10/2012
STATE DAYS
Texas 5
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
5
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 6/11/2012
STATE DAYS
Texas 6
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
6
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 6/12/2012
STATE DAYS
Texas 7
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
7
ENGINEERING REPORTED BY
Jon Dews
COUNTY DATE
Hardin 01-
STATE DAYS
Texas 8
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
8
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 0
STATE DAYS
Texas 9
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
9
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 1
STATE DAYS
Texas 10
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
10
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 2
STATE DAYS
Texas 11
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
11
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 3
STATE DAYS
Texas 12
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
12
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 4
STATE DAYS
Texas 13
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
13
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 5
STATE DAYS
Texas 14
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
14
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 6
STATE DAYS
Texas 15
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
15
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 7
STATE DAYS
Texas 16
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
16
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 8
STATE DAYS
Texas 17
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
17
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 9
STATE DAYS
Texas 18
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
18
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 10
STATE DAYS
Texas 19
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
19
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 11
STATE DAYS
Texas 20
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
20
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 12
STATE DAYS
Texas 21
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
21
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 13
STATE DAYS
Texas 22
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
22
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 14
STATE DAYS
Texas 23
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
23
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 15
STATE DAYS
Texas 24
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
24
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 16
STATE DAYS
Texas 25
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
25
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 17
STATE DAYS
Texas 26
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
26
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 18
STATE DAYS
Texas 27
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
27
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 19
STATE DAYS
Texas 28
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
28
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 20
STATE DAYS
Texas 29
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
29
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 21
STATE DAYS
Texas 30
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
30
ENGINEERING REPORTED BY
WOOCO WHITE OAK OPERATING CO. Ron Porterpan
COUNTY DATE
Hardin DAILY COMPLETION REPORT 22
STATE DAYS
Texas 31
TANGIBLES
OD ID Length Top Conductor Pipe 0
KB Surface Casing 0
0 Intermediate Casing 0
0 Production Casing 0
0 Tubing 0
0 Wellhead Equipment 0
0 Pumping Unit / Base 0
0 Rods 0
0 Motor Controls 0
0 Valves & Fittings 0
0 Electrical 0
0 Submersible Pump/ Equipment 0
0 Gas Lift Equipment 0
0 Tanks 0
0 Dehydrator 0
0 Heater / Treater / Line Heater 0
0 Separator 0
0 Packer & Downhole Equipment 0
0 Flowline 0
0 Cattle Guard / Gates/ Fences 0
0 Metering Equipment 0
0 Materials & Supplies 0
0 Compressors 0
0 Pipelines 0
0 Installation Costs 0
0 Contingencies 0
TOTAL TANGIBLES 0 0
TOTAL 0 11,762
31