GE Industrial AeroDerivative
Gas Turbines
SERVICE BULLETIN LM2500-IND-164
4 December 2001

GE PROPRIETARY INFORMATION

The information contained in this document is GE proprietary information and is disclosed in


confidence. It is the property of GE and shall not be used, disclosed to others, or reproduced
without the express written consent of GE, including, but without limitation, it is not to be used
in the creation, manufacture, development, or derivation of any repairs, modifications, spare
parts, design, or configuration changes or to obtain FAA or any other government or
regulatory approval to do so. If consent is given for reproduction in whole or in part, this
notice and the notice set forth on each page of this document shall appear in any such
reproduction in whole or part. The information contained in this document may also be
controlled by U.S. export control laws. Unauthorized export or reexport is prohibited.

Copyright (2001) General Electric Company, USA

SUBJECT: 2-Cup Fuel Nozzle Improvement (LM2500+ DLE Models)

I. PLANNING INFORMATION

A. Effectivity

LM2500+ gas generators, serial numbers 636-050, 636-051, and 636-101 through
636-106, are affected by this Service Bulletin.

LM2500+ gas turbines, serial numbers 559-101 through 559-110, 642-101 through
642-107, 642-109 through 642-135, and 642-137 through 642-144, are affected by
this Service Bulletin.

B. Reason

This Service Bulletin introduces an improved 2-cup fuel nozzle which has a modified
A-cup fuel circuit effective area requirements that reduce the ELBO flow from
14 percent to 9 percent of the overall A-ring fuel flow. The improved fuel nozzle
should reduce NOx emissions by 2-4 ppm at the uprated T48 limit of 1546° F
(841.1° C) at ambient temperatures of 10-120°F (-12.2 to 48.9°C).

OPTIONAL
Page 1 of 5
SERVICE BULLETIN LM2500-IND-164
4 December 2001

I. PLANNING INFORMATION - Continued

C. Description

This Service Bulletin provides instructions for replacing the 2-cup fuel nozzles.

D. Compliance

Category: Optional (O) Level: Field (F) Timing Code: 7

GE recommends this Service Bulletin be accomplished at the customer’s option.

E. Manpower

Approximately eighteen (18) man-hours are required to accomplish this Service


Bulletin.

F. Materials

The following materials are required to accomplish this Service Bulletin:

Part Number Nomenclature Quantity


L47197P06 Nozzle, Fuel 15

The following materials may be required to accomplish this Service Bulletin:

Part Number Nomenclature Quantity


L47618P01 Seal, Fuel Nozzle 15

The cost and delivery for this material will be quoted upon request or upon receipt of
purchase order submitted to the address below:

GE Marine & Industrial AeroDerivative Gas Turbines


Mail Drop S-133
One Neumann Way
PO Box 156301
Cincinnati, OH 45215-6301, USA

Attn: GE Customer Account Manager

Ensure all materials required by technical manual procedures referenced in


ACCOMPLISHMENT INSTRUCTIONS are on hand prior to performing this Service
Bulletin.

Page 2 of 5

GE PROPRIETARY INFORMATION – Subject to the restrictions on the cover or first page.


SERVICE BULLETIN LM2500-IND-164
4 December 2001

I. PLANNING INFORMATION - Continued

G. Tooling

No special tools are required.

Ensure all tooling required by technical manual procedures referenced in


ACCOMPLISHMENT INSTRUCTIONS are on hand prior to performing this Service
Bulletin.

H. References

CID 705440 (For GE Internal Use Only)


GEK 105048 Operation and Maintenance Manual

I. Previous Modifications

None.

J. Reidentification

Not applicable.

II. ACCOMPLISHMENT INSTRUCTIONS

A. Remove fuel nozzles per GEK 105048, WP 101 00.

B. Install new fuel nozzles, PN L47197P06, per GEK 105048, WP 101 00.

III. MATERIAL INFORMATION

A. Configuration Chart

Old Part New Part


Number Nomenclature Qty Action Number Qty
L47197P05 Fuel Nozzle, 2-Cup 15 Replace L47197P06 15

B. Interchangeability

Physical interchangeability is not affected by this Service Bulletin. Functional


interchangeability is affected in that the nozzles should be replaced as a set to
achieve full NOx reduction potential.

C. Parts Disposition

Scrap removed hardware.

Page 3 of 5

GE PROPRIETARY INFORMATION – Subject to the restrictions on the cover or first page.


SERVICE BULLETIN LM2500-IND-164
4 December 2001

IV. COMPLIANCE RECORD

Compliance with this Service Bulletin must be entered in local records. The attached
Service Bulletin Compliance Record form must be completed and returned to the
address indicated on the compliance form.

Page 4 of 5

GE PROPRIETARY INFORMATION – Subject to the restrictions on the cover or first page.


SERVICE BULLETIN LM2500-IND-164
4 December 2001

2-CUP FUEL NOZZLE IMPROVEMENT (LM2500+ DLE MODELS)


SERVICE BULLETIN COMPLIANCE RECORD

Gas Turbine SN:___________________________________ Total Time: _______


(Hours)

ACCOMPLISHED AT (LOCATION): ______________________________________

BY WHOM: ____________________________________ DATE: _______________

MATERIAL INFORMATION
(ADDED, DELETED, OR REPLACED HARDWARE)

HARDWARE REMOVED HARDWARE INSTALLED

NOMENCLATURE PART NO. SERIAL NO. QTY NOMENCLATURE PART NO. SERIAL NO. QTY

Mail this form to: Strategic Power Systems, Inc. PHONE: (704) 544-5501
Piedmont Bldg. - Koger Center FAX: (704) 544-5505
Suite 308
11301 Carmel Commons Blvd.
Charlotte, NC 28226, USA

Attention: Program Manager, ORAP

Comments:

Page 5 of 5