All relative statements are with respect to GE technology unless otherwise noted.
2
© 2020 General Electric Company. Confidential information. All rights reserved.
Agenda
- Completed programs
- Active programs
Best Practices
- Hex-Chromium Findings
3
© 2019
2020 General Electric Company. Confidential information. All rights reserved.
Participants
LM2500 Participants
Participant Title
GE Gas Power
Erika Chapa LM2500 Lead Engineer (Package)
Bob Hammond LM2500 Product Line PSE Lead
Nam Tran LM2500 Product Line Ldr. (Package)
JV – Aero Alliance
Mike Carlson LM2500/LMS100 Fleet Program Mgr.
GE Aviation
Tad Stokley LM2500 Fleet Support Leader
Fieldcore
Alec Duncan Service Manager - Central NAM Region
7
© 2020 General Electric Company. Confidential information. All rights reserved.
Engine programs
Completed engine
programs
Overview of Completed Programs
ISSUE ENGINEERING ENHANCEMENT APPLICABILITY SB ISSUANCE
Base Plus +G4 SB 287 (LSPT field), SB 288 (LSPT depot),
IGB Spline Wear Forward and aft oil dams
SAC DLE SB 297 (HSPT)
Incorporate washers and dampers to prevent metal-to- Base Plus +G4
VSV Turnbuckle Wear SB 290 issued
metal contact SAC DLE
De-Bonding of HPC Air Duct Base Plus +G4
Incorporate high-temperature adhesive SB 277 issued
Wear Strip SAC DLE
HPC Stage 12-14 Blade Tip Base Plus +G4
Clearance changes SB 286 issued
Losses SAC DLE
HPC Stage 15 & 16 Platform Base Plus +G4 New S16 blade introduced in 2015; new
Introduction of platform corner crop
Corner Loss SAC DLE S15B in production since 1Q17
Base Plus +G4
DLE CRF Baffle Cracking Added stiffening ring for resonance frequency avoidance SB 278 issued
SAC DLE
Bearing events due hard Base Plus +G4
Nitrided 4B, 5R, 7B & IGB Duplex Bearing SB 304, 305, 306 & 309 issued
particle contamination SAC DLE
LM2500+G4 HP Recoup Updated based on additional tests data and included Base Plus +G4
O&M Manual Updates
Algorithm V4.2 effect for water injection SAC DLE
Base Plus +G4 1Q2019
HPT S1B Field Limits New modeling of serviceability limits to extend blade life
SAC DLE
Base Plus +G4
IGB Duplex Bearing Events Radial clearance change in aft ball Implemented April, 2018
SAC DLE
Base Plus +G4
DLE Gas Manifold Distress Incorporation of gas circuit check valves Service evaluation in process
SAC DLE
High Vane Count HPC Increased vane counts, material upgrades, Base Plus +G4 Hardware available now
SAC DLE
updated blade geometry
HPC Corrosion Anti-corrosion coating & Inco Stage 2 Disk Base Plus +G4 Coating in field service evaluation
SAC DLE
HPT Rub and Unnecessary Software version 5.0.0 – Trip reduction and hot Base Plus +G4 4Q2019
Engine Trips rotor re-burst protection SAC DLE
Base Plus +G4
TMF Liner Axial Shift Stiffer TMF liner support 4Q2020
SAC DLE
VSV Actuator Bracket Improve bearing retention Base Plus +G4 TBD
Wear SAC DLE
Manual Language
WARNING: THIS ENGINE, MODULE AND ATTACHING PARTS MAY HAVE RESIDUES PRESENT ON THEIR SURFACES THAT MAY CONTAIN
HEXAVALENT CHROMIUM . WHEN YOU WORK WITH THIS ENGINE YOU MUST OBEY THE PRECAUTIONS THAT FOLLOW. • YOU MUST OBEY ALL
APPLICABLE ENVIRONMENTAL, HEALTH AND SAFETY REGULATORY PRECAUTIONS BEFORE YOU MOVE, TOUCH, REPLACE OR DISCARD
HARDWARE THAT CONTAINS HEXAVALENT CHROMIUM. • HEXAVALENT CHROMIUM MAY CAUSE ADVERSE HEALTHEFFECTS IF INGESTED,
INHALED, OR CONTACTED WITH SKIN AND REQUIRES CARE IN HANDLING . AVOID CONTACT WITH SKIN, EYES AND MUCUS MEMBRANES.-AVOID
INHALATION OR INGESTION OF RESIDUE. -WEAR DISPOSABLE NITRILE GLOVES AND EYE PROTECTION WHENEVER INSPECTING OR HANDLING
PARTS WITH THE SUSPECTED RESIDUE. -IN CASE OF CONTACT,IMMEDIATELY IRRIGATE AFFECTED AREA WITH RUNNING WATER.-IF CONTACT IS
SEVERE, OBTAIN MEDICAL ATTENTION. • FOLLOW STANDARD PRACTICES MANUAL TASK 70-00-10.
Engine systems:
• IR gas sampling probe installed upside down • Trailer enclosure roof connection (TM Gen 7)
• Uninterruptible power supply for HMI desktop (TM Gen 8) • Generator MLO pump coupling
• Inlet pulse air filtration MCC retrofit • Gas flow calculation and operating hours software update
• Direct driven fan (Classic pkg) (TM Gen 4/6/7)
• Fire System communication cable (TM Gen 8) • HYDAC Pressure Transmitter Firmware Update
Enhancements Enhancements
• All HYDAC Pressure Transmitters must be updated with new • Need to raise the demisters and/or
firmware; increase P-trap height
• A HART modem (“MicroLink_101-0027”) is required as physical • Pressures will drop down and vapors will
interface - must be connected to a free USB port on the PC. disappear
Field recommendations Field recommendations
• Product Bulletin #311, issued 10/24/19 • Product Bulletin planned for 4Q 2020
COMPLETED ACTIVE
© 2020 General Electric Company. Confidential information. All rights reserved.
.
Universal Power
Turbine (UPT)
Applicable to: SAC DLE
New +G4
What is it?
AVAILABLE TO QUOTE
• UPT is the new LSPT that GPS is going to install on
new LM2500 and TM2500 Packages starting in 2021
How does it work?
• UPT provides improved power output and heat rate Expected performance comparison
primarily 50 Hz operation without requiring a
reduction gear (3000 rpm PT speed). It also provides
some improvement for 60 Hz operation at 3600rpm
PT speed
• UPT does maintain overall Gas Turbine length to
enable it to fit into the same package size as the
existing Low Speed Power Turbine (LSPT, aka 6-pack)
Customer benefits
• Increased power with the same GG
• Better efficiency
Asset modification
• On Engine: TMF and Piping
• Package: Collector, Diffuser/Tunnel, TRF mounting
20
© 2020 General Electric Company. Confidential information. All rights reserved.
FieldCore
AERO FIELD
SERVICES
WTUI 2020
United States
Canada
North America Europe Asia Pacific
LATIN AMERICA
✓ 63 Countries
979 ✓ 12,300+ Employees
Aero PS FieldCore NAM Overview
KPI 2018 2019
EHS I&I 0.0 0.58 2019Achievements
# Recordables 0.0 1.0 EHS POWRA & Risk register
# Unique Field EE’s 131 148 Talent Competency model progression
# Safety Observations 379 499 RTS Improved Outage Demand/forecast visibility
# Safety Audits 15 20
Quality NCR implementation using PowerNow
# Stop Work Events 47 71
Productivity Shift handover standardization
# ORR’s 603 834
# Projects 1252 1122
# Mobilizations 3458 3137 2020 Priorities
Hours (k) 208 223 Positive outcomes Customer sentiment & feedback
# Power Awards 100+ 80
EHS & Quality Lifting Operations Planning & Procedural compliance
# Sites 323 301
Talent Recruiting & Training
# Technical reports 1095 985
RTS Weekly ORR rigor with CSL’s to plan 14 milestones
# NCR’s related to FC 39 49
Productivity Measure Actual Execution vs Standards for each scope
COPQ (MM$) 2.0 1.1
Investment required
• Minimal Cost
Associated risks
• Injury to personnel
• Damage to Engine and/or Package
Investment required
• Very low investment, just time for cleaning
Associated risks /
rewards
• Limit Force outages
• Stop injuries and EHS incidents
28