Professional Documents
Culture Documents
I. PLANNING INFORMATION
A. Effectivity
(1) PRODUCTS:
LM2500 Plus DLE GR, GY, PR, and PY Models
OPTIONAL
PAGE 1 of 5
LM2500-IND-0307
May 09, 2019
(1) Objective:
The purpose of this Service Bulletin is to introduce an Xtend™ hot section kit
to LM2500 Plus DLE engines.
(2) Condition/Events:
(4) Improvement:
C. Description
This Service Bulletin provides instructions to install the Xtend™ kit.
D. Compliance
E. Manpower
Once the engine is removed from the enclosure, approximately 144 man-hours are
required to accomplish this Service Bulletin in the field as a rotable exchange.
PAGE 2 of 5
F. Tooling
G. Material Requirements
For cost and lead time estimates, contact your GE Customer Service Manager.
Not applicable.
I. Material Interchangeability
J. Material Disposition
Per hot section exchange/service center sales contract.
K. Material Reidentification
LM2500 Plus DLE Operation and Maintenance (O&M) Manual, GEK 105048
M. Previous Modifications
None.
PAGE 3 of 5
Compliance with this Service Bulletin must be properly documented. The preferred
method of documentation is to directly enter the compliance details through My
Dashboard at https://mydashboard.gepower.com. If you do not have access to My
Dashboard, please visit https://www.gepower.com to register and request access. Within
My Dashboard, you can access all of the bulletin data associated with your equipment by
selecting “Aero Bulletins”.
Should you have any issues, please contact the FDQ Team at aerotechdata@ge.com.
PAGE 4 of 5
PAGE 5 of 5
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.