REFERENCES
Project Drawings
Vendor’s data sheets
Project Quality Plan (PQP)
Inspection & Test Plan
Task Risk Assessment (TRA)
3. RESPONSIBILITIES
4. PROCEDURES
Fill the loop testing check list and take signature of all the concerned .
The following tools and equipment shall be required to perform the works.
Multi-meter
Radio
Process calibrator
Hart communicator
DECADE boxes
Any other equipment as recommended by manufacturers.
6. HSE INSTRUCTIONS
Prior to start the job, DESCON HSE Officer or Site Engineer shall deliver the
specific safety instruction to the concerned personnel
The workers will be made aware of safety requirements related to this activity
through daily, weekly and monthly toolbox and safety talks.
Waste management should be strictly followed to keep the jobsite neat and
clean.