128467-Aircraft Signage QA

You might also like

You are on page 1of 4
MEMORANDUM r- AR & EP Director of Monitoring 7 LM/HICR/3627/07/2017 i Monday, July 24, 2017 ae wee! DATE gu SUBJECT: Comments on Work Notification, JCR Ref # 03/1707/SCR, for the aircraft crossing signage at QA Taxiways near to the main fire station. With reference to the above subject please be informed that we have ‘No Objection’ to proceed with ‘the works detailed in the work notification subject to compliance to our below comments: ‘eneral and FM Interior & Plants Co1 Incase of any emergencies at work, immediately call JCR at +97145045000 or 050 4575009. Barricade the working area with safety cone markers. ‘The working area to be cleaned after completed the work. ‘The working area to be cleaned after completed the work. Contractor staff shall mandatorily undergo Safety Induction Program before commencing project work in Airport Premises of DI 6. Obtain approval from all relevant Departments/ Authorities before the commencement of work. 7. PTW approval indicating the date and time of work shall be obtained from JCR before the ‘commencement of work. 8, Before start/finish of the work activity, contact the concemed Shift Duty Engineer for document verification / Safety compliance of the work activity that to be performed. Contact details given below as per location for reference. ie Duncans of Contac Other Airlines (Terminal 1,Con D) | Serco Duty Manager | 0543062233 Cargo and Ancillary Buildings ‘Serco — Duty Manager | 0543062234 Concourse B, Terminal 3 Duty Engineer 050-1076678 Concourse A Duty Engineer 050-2811067 Concourse C Duty Engineer 050-5889906 9. Local Area access permits shall be obtained from Shift Duty Engineer if the scope / location of work require access to AL&SS (Airport Logistics and Special Systems), AU (Airport Utilities) Facilities. For further information on LOCAL AREA ACCESS PERMIT, call THD# 0097145055099. ube Argon ser asoaasee savy sovssres Cont'd Page quot 5 POBox Jes Outs Teri azosser savy aveerran 9 2525 woe Ute ab Emratoe Snipers se ubaiaipors.se > boc Soll hia wus Glas 3, Dubai Airports LM/HJCR/3627/07/2017 Page 2 of 5 FM Electrical Comments : Te Electrical room and substation access, Switching operation and disconnection of power liaise with FM shift engineer 0505889906/0501076678/05028 1 1067/0501078036 2. Do not cause any hindrance to the live operational electrical system 3. Do not work on any live electrical DB, SMDB, and MCC ete. If required separate work Nae Fit Out Construction Job No: 128467 ( WN 132334) Comments L 10. ML. 12. notification shall be submitted with detail method statement and risk assessment. All Electrical works should be carried out under proper supervision by the contractor. Design, quality and safety at work is sole responsibility of contractor, consultant and DAEP. Contractor has to coordinate with relevant sections in DA for the above works. Separate WN shall be submitted to work on live electrical Distribution panels (SMDB, MCC and DB Ete.) Contractor to coordinate with DA Development-Fitout Construction (FOC) team before starting the work at site. The DA Fitout coordinator for this job is (Mr. TAUQUIR : phone: 050-3474665: Email: Tauquir. Khan @dubaiairports.ae Site Kick-off meeting (with DA Fitout Team) is essential before starting any works at site. All Documents to be presented in the kick-off meeting to ensure all the required approvals are obtained such as the NOC, Permit To Work, scope of work, method statement, Risk Assessment, approved proposed drawings, material submittals approvals, Work Program, ete. Alll the above documents to be approved by DA Fitout, if not; then it has to be resubmitted for approval prior to start any physical works at site. All materials used at site to be with written approvals, otherwise will be instructed to remove them from site. All materials to be Fire Rated. All material and practices shall be as per the NFPA standards and Dubai Civil Defence regulations, and contactor shall adhere to any comments or instructions raised by The DA Fire and Life Safety. Any structural works to be designed by certified consultant and to be performed by professional contactors. Contractor shall call for inspections with DA-Fitout team during the construction period for the services installations & removals, for ceiling closure, for Electrical Isolation Test/ Insulation Resistance Test, waterproofing test, slab coring, etc. Upon completion, a Final Inspection is required along with DA Fire & Life Safety to ensure the project is ready occupation or operation. Entering any Electrical Rooms or Technical Rooms will require pre-approved Entry Pass for doing any kind of works related to the Electrical connectivity. Connecting & Disconnecting of any power supply/feeder/distributor will require written approval from the DA- Utility Management. (The Form will be provided when needed). Fire Fighting and Fire Alarm systems temporary arrangements shall in place during the construction period. This shall be performed only by the DA designated Fire Fighting contractor. Cont'd Page 3 of 5 Dubai Atpons waa 9v) socteree we wile Po Bor 2825, Dita F Tarazmoaann sav arrerTai es BSS Utes eb reais Warmers se ubaiarpors.2e. sass bt Reternee® D371) 09 [U_ Werk Notification é 2656 1.0 Permit Request Details RECEIVED DARWISH ALUMINIUM AND ctass co. tic! 7 JUL 207 128467 Department/Organisation gxuew Project/Contract reference: Project Title: _Aircraft crossing signage at QA-Taxiways Project Scope: [-] New (7 urerade/ Update [3] Medication [7] Total Makeover Project Exact Location: _Qubic Alpha Taxiway near to the Main Fire Station Project location's exstingorgial conditions are absolutely known? [x] YES Ono suring Date: _24/07/2017_Suning Time _06:00 EndingDte:_24/10/2017 _ Ending Tine: _18:00 1.1 Permit Work Type(s) Welding Confined entry Cable work Dismanting [7] Manus anding [7] Dare eats Cine ining] Wauerteee [7] Fionn [—] Bea wets [7] Pag camunns Dewatee Sate [7] Gevepemen [] Deting Coie — Sele Atuwoa [7] Stmmce [7] Deeonpesion [] Dainng wos [| Dentioe Sore nptavacwoas [¥] ontwets [7] sapsnnarn |] Sm Te] sipwmatins [| sets onan titetning [] befting Frcratwots [I tegag wats [T] concn Other: 0/7/2014 pro) serinens [of ob card/ Const Matod statement Leyoudrawing Others: Location Photo we 17/07/2017 Qu! : 17/07/2017 Project Manager Signature Date Projet Saley Manager Sanatre Date Contact Number: 0565045916 Contact Number: 0565045908 Final Authorization (Police / DA Permit controller) 7 Please submit Perit request and avtachients via mall” personally To the Touat Contral Roam — Terminal 3 srking davs) for approvals processing andor feed back. Please ensure that you ae fully aware of ll rrangements scope prior to sending this request, in order avoid delays. For further assistance andor follow-up, tv jeradubalairports.ae 2.0 Permit Review & Authorisation Aor reviewing the request, work details, document precautions are eeqleeds 2.1 Permit Precautions & Requirements safe ne Seley cones aut Inperon eed ‘ion gue ‘Se col requ Fs onl eed Tsing eures Sock cred requ Vinson Boe eared ‘Fates Spi oa! ions and physically inspecting the sie / locaton; the following work Innlason regu Fame are Pre’ Tepid] Fae wach equi reaigeprs Frvengmt ond Uifing port emuied T] Feta Ambulance Sparcomatrqares | [—] Conteiems ont War& arco! Prcelize conse Netecontlceqied [] Weaht cool Usomingegares| Cerfaton equ hing equ Barons ‘Winn Sineeqazet [] Speval ms slopes Evaporation cero) Soe coo is cud Lee Stine Pers equi es Seon cure examin oat Water conn Radon onet Lens NOC eared Stet mectipnee Sen Vinton Nowe sal Maing one! Fallarets Manx Cons wae ota Trine ters: (attach) After reviewing the permit and is attachments, AREF have no objection to authorise this permit subject tot N pyre of bor) Tul After reviewing the permit and its attachments, DA Engincer have no objection to authorise this permit subject to; After reviewing the permit and its attachments, OUSE Enzingtr have no objection fo authorise this permit subject to: ‘ner eg he ermit nd aehien Aer DAL MANA sent ator permit et ae Cots Ltt! po ood bakes. 2P-7N7 Da Eager ae Daz a qo Dale SnseSipawe Ol F201 ‘QHSE Engineer's Signature Date por Date BAe ui Terminal Manager

You might also like