1. AB Ltd is organized into two large divisions – A and B. Division A produces a component which is
used by division B in making a final product. The final product is sold for Rs.480. Division A has a
capacity to produce 2,400 units and the entire quantity can be purchased by division B.
Division A informed that due to installation of new machines, its depreciation cost has gone up and
hence wanted to increase the price of the component to be supplied to division B at Rs.264. Division B,
however, can buy the component from the outside market at Rs.264 each. The variable cost of division
A is Rs.228 and fixed cost is Rs.24 per component. The variable cost of division B in manufacturing
the final product by using the component is Rs.180 (excluding the component cost).
If division B purchases the entire component from division A, the total contribution of the company as
a whole is
(a) Rs.5,47,200 (b) Rs. 86,400 (c) Rs.1,72,800 (d) Rs.7,20,000 (e) Rs.1,15,200.
(1 mark)
2. Chakri Ltd. has furnished the following data relating to its product for the year 2003-04:
Annual production (units) 30,000
Material cost (Rs.) 90,000
Other variable costs (Rs.) 1,80,000
Fixed cost (Rs.) 60,000
Total cost (Rs.) 3,30,000
Apportioned investment (Rs.) 3,00,000
Assuming income tax rate of 40%, if the company desires to earn a post tax profit of 15% on listed sale
price when trade discount is 35%, the net sale price per unit would be
(a) Rs.35.00 (b) Rs.30.00 (c) Rs.27.50 (d) Rs.25.00 (e)
Rs.17.88.
(2 marks)
3. Karuna Ltd. has two divisions - A and B. Division A has the capacity to manufacture 1,50,000 units of
a special component LKJ annually and it has some idle capacity currently. The budgeted residual
income for the division A is Rs.10,00,000. The relevant details extracted from the budget of A are as
under:
Sales (to outside customers) 1,20,000 units @ Rs.180 per unit
Variable cost per unit Rs.160
Divisional fixed cost Rs.8,00,000
Capital employed Rs.75,00,000
Cost of capital 12% per annum
Division B received an order for which it requires 30,000 units of a component similar to LKJ. An
additional variable cost of Rs.5 per unit will be incurred to make minor modifications to LKJ to suit the
requirements of Division B.
The minimum transfer price per unit which Division A should quote to Division B to achieve its
budgeted residual income is
(a) Rs.185 (b) Rs.170 (c) Rs.165 (d) Rs.160 (e) Rs.175.
(2 marks)
4. A timber merchant purchased 1,000 cft. of timber logs on April 01, 2004 at the rate of Rs.100 per cft
and stored them in his timber yard for six months for seasoning. In the timber yard the following items
of expenses were incurred during the period of seasoning
Rent –Rs. 1,250 per month
Salaries of 4 guards at the rate of Rs. 250 per month
Incidental expenditure for maintenance, power, lighting, etc. Rs. 750 per month
Annual share of administration overheads Rs. 10,000.
50% of the floor area of the godown and other connected operations were incurred for stocking the
seasoned timber. Loss in volume of the logs due to seasoning should be taken at 10%.
If the timber merchant desires a profit of 15% on cost, the selling price of the seasoned timber per cft as
on October 01, 2004 is
(a) Rs. 142.47 (b) Rs. 128.23 (c) Rs. 111.50 (d) Rs. 123.89 (e) Rs. 132.28.
(2 marks)
5. Which of the following pricing techniques ignores fixed cost?
(a) Standard cost based pricing (b) Full cost pricing
(c) Cost plus profit pricing (d) Return on investment based pricing
(e) Differential cost pricing.
(1 mark)
6. John Ltd. produces and sells 500 units of a product each month with total variable costs of Rs.6,000 and
total fixed costs of Rs.6,000. Idle capacity would permit the acceptance of a special sales order for 100
units each month. The average unit cost per month of producing and selling the total output, if the
special order is accepted, would be
(a) Rs.12 (b) Rs.18 (c) Rs.22 (d) Rs.24 (e) Rs.20.
(1 mark)
7. The standard and actual data for a product are as under
Standard Actual
Particulars
Quantity Rs. Quantity
Raw Material I 300 Kg 4 per unit 350 Kg
Raw Material II 200 Kg 3 per unit 160 Kg
Skilled labour 20 hours 10 per hour 22 hours
Unskilled labour 10 hours 7 per hour 6 hours
There are no price variances .The standard process loss is 10% of input .But actual loss is 14% of
output .The total prime cost variance is
(a) Rs.8.82(Adverse) (b) Rs.99.82(Adverse)
(c) Rs8.82(Favorable) (d) Rs.84.10(Adverse)
(e) Rs.84.10(Favorable).
(2 marks)
8. Sarada Vilas Bank (SVB) sells services rather than tangible products. It makes auto and home loans,
processes other companies’ credit card transactions, and provides account services to individual and
commercial checking account customers. SVB managers want to determine how far service revenues
could fall below budgeted revenues before losses occur from operations. The managers want to know
the bank’s
(a) Sales mix (b) Relevant revenue range
(c) Margin of safety (d) Variable costs
(e) Contribution margin.
(1 mark)
9. The variable-cost percentage in sales plus the contribution margin percentage in sales equals to
(a) Gross margin (b) Operating leverage
(c) 100% (d) Target net income (e) Contribution to sales ratio.
(1 mark)
10. ABC Ltd.’s managers want to control, and reduce if possible, the company’s production costs. They
must determine how production costs are related to and affected by various business activities. These
managers need to understand
(a) Variable costs (b) Cost behaviors
(c) Fixed costs (d) Relevant ranges (e) Variable and fixed costs.
(1 mark)
11. Which of the following statements is false?
(a) Differential cost pricing could bring about pricing decisions that tend to disregard the necessity of
recovering total costs in the long run
(b) Differential cost pricing is not related to economic marginal analysis
(c) Full cost pricing ignores the vital economic considerations of demand and competition
(d) Full cost pricing is prone to distortion by accounting misapplication such as an unjustifiable
inclusion of manufacturing overhead based on predetermined rates
(e) ROI pricing method guides management in determining what selling price will provide a given
rate of return.
(1 mark)
12. A calculated target selling price based on mark-up percentages may be adjusted depending on factors
such as
I. Future capacity available
II. Extent of competition from other firms
III. Management’s general knowledge about the market.
(a) Only (I) above (b) Only (II) above
(c) Only (III) above (d) Both (I) and (III) above
(e) (I), (II) and (III) above.
(1 mark)
13. Which of the following is/are particularly associated with operating a system of transfer pricing?
I. Ensuring that goal congruence is retained among the organization’s separate divisions
II. Ensuring that divisional performance measurement is not affected
III. Ensuring that corporate profits are maximized
IV. Ensuring that the group remains competitive.
(a) Only (I) above (b) Only (IV) above (c) Both (II) and (III) above
(d) (I), (II) and (III) above (e) (I), (II), (III) and (IV) above.
(1 mark)
14. The transfer price which is usually based on the listed price of an identical or similar product or service,
or the price of a competitor is called
(a) Marginal cost transfer pricing (b) Cost plus a mark up transfer pricing
(c) Negotiated transfer pricing (d) Full cost transfer pricing
(e) Market based transfer pricing.
(1 mark)
15. Which of the following statements is/are true?
I. Quarterly manufacturing cost budgets may legitimately show widely varying manufacturing costs
per unit if production is not evenly distributed
II. The first financial budget prepared is the cash budget
III. A flexible budget is a budget prepared for different levels of activity
(a) Only (I) above (b) Only (II) above (c) Only (III) above
(d) Both (I) and (III) above (e) (I), (II) and (III) above.
(1 mark)
16. Which of the following statements is/are false?
I. The first step in preparing a master budget is the preparation of the cash budget
II. Normally, the last budget prepared is the budgeted balance sheet
III. Planned production for the period can be expressed as the budgeted sales units plus the
desired ending inventory less the beginning inventory
(a) Only (I) above (b) Only (II) above (c) Only (III) above
(d) Both (I) and (II) above (e) (I), (II) and (III) above.
(1 mark)
17. Which of the following statements is/are true?
I. The average time required for the cash invested in inventories to be converted into the cash
ultimately collected on sales made to customers is called the operating cycle
II A budget is a comprehensive financial plan setting forth the expected route for achieving the
financial and operational goals of an organization
III. One of the benefits derived from budgeting is the assignment of decision-making
responsibilities
(a) Both (I) and (III) above (b) Only (II) above
(c) Both (II) and (III) above (d) Both (I) and (II) above
(e) (I), (II) and (III) above.
(1 mark)
18. Which of the following statements is/are false?
I. The budget director or chief budget officer, should not only consider financial resources
when preparing the budget, but should also take into consideration human resources.
II. A set of written instructions that specifies who will provide budgetary data and its form, and
who should receive various schedules comprising the budget, can be found in the budget
manual.
III. The master budget reflects the impact of only operating decisions.
(a) Only (I) above (b) Only (II) above
(c) Only (III) above (d) Both (I) and (II) above
(e) (I), (II) and (III) above.
(1 mark)
19. Which of the following statements is true with regard to the difference between a flexible budget and a
fixed budget?
(a) A flexible budget primarily is prepared for planning purposes while a fixed budget is prepared for
performance evaluation
(b) A flexible budget provides cost allowances for different levels of activity whereas a fixed budget
provides costs for one level of activity
(c) A flexible budget includes only variable costs whereas a fixed budget includes only fixed costs
(d) A flexible budget is established by operating management while a fixed budget is determined by
management
(e) The variances are usually larger with a flexible budget than with a fixed budget.
(1 mark)
20. Consider the following data of a company:
Quarters 1st 2nd 3rd 4th
Budgeted direct-labor hours 60,000 80,000 75,000 70,000
Variable overhead rate per labor hour Rs.3.00 Rs.3.00 Rs.3.00 Rs.3.00
Fixed manufacturing overhead Rs.80,000 Rs.80,000 Rs.80,000 Rs.80,000
The fixed manufacturing overhead includes depreciation of Rs.35,000 per quarter.
Ninety percent of the cash payments for manufacturing overhead for each quarter are made during the
quarter, and the remaining 10% is made in the following quarter. The amount of overhead costs to be
paid during the 2nd quarter is
(a) Rs.274,500 (b) Rs.279,000 (c) Rs.314,000 (d) Rs.349,000 (e) Rs.354,000.
(1 mark)
21. Consider the following sales forecast, the manufacturing cost budget, and the schedules of cash
payment of a company:
Quarter 1st 2nd
Planned production units 7,000 7,500
Budgeted variable overhead costs Rs.15,000 Rs.18,750
Budgeted fixed manufacturing overhead costs unknown unknown
Budgeted depreciation included in total overhead Rs. 3,000 Rs. 3,000
Budgeted cash payments for total overhead Rs.20,000 Rs.23,750
All budgeted overhead costs, except for budgeted fixed manufacturing overhead, are shown. What is
the amount of budgeted fixed manufacturing overhead for 1st quarter?
(a) Rs.2,000 (b) Rs.6,000 (c) Rs.7,000 (d) Rs.8,000 (e) Rs.9,000.
(1 mark)
22. Consider the following production schedule of Telectron Ltd:
Quarter 1st 2nd 3rd
Beginning inventory (Units) 5,0000 4,000 12,000
Budgeted unit sales (Units) 50,000 40,000 1,20,000
Desired ending finished goods (Units) 4,000 12,000 15,000
Direct labor completes 2 units per hour at Rs.8 per hour. Which of the following statements is false?
(a) Desired ending inventory is 10% of the next quarter's sales units
(b) Direct labor cost for the 4th quarter cannot be determined
(c) Direct labor cost for the 2nd quarter will be Rs.192,000
(d) Sales units of 150,000 are projected for the 4th quarter
(e) Direct labor hours for the 3rd quarter will be 66,000.
(2 marks)
23. Santa Ltd. has furnished the following payment schedule related to purchases of direct materials:
60% of purchase payment in the month of purchase
30% of purchase payment in the month following the month of purchase
10% of purchase payment in the second month following the month of purchase.
The company purchased the same amount of goods in the months of July and August 2004.Total credit
purchases in the month of September 2004 were Rs.100,000, and total payments on credit purchases in
the month of September 2004 were Rs.140,000. What were the credit purchases in the month of July
2004?
(a) Rs.1,00,000 (b) Rs.2,00,000 (c) Rs.2,40,000 (d) Rs.3,00,000 (e) Rs.4,00,000.
(2 marks)
24. Kavita Ltd. had following production costs:
Direct wages Rs.1,50,000
Direct material Rs.2,25,000
Production overhead
Fixed Rs. 60,000
Variable Rs.1,00,000
Following are the budgeted values for the current year:
Labor rate is expected to decrease from Re.1.00 per hour to Re.0.80 per hour,
Production efficiency is expected to fall by 10%. Production will increase by 40%.
The budgeted cost of production for the year is
(a) Rs.6,00,000 (b) Rs.6,59,800 (c) Rs.7,13,800 (d) Rs.7,17,223 (e) Rs.7,23,000.
(2 marks)
25. Economic value added (EVA) is
(a) A variant of residual income
(b) Net operating income minus shareholders' equity
(c) Cost of capital
(d) Net operating income minus weighted average cost of capital multiplied by sum of long-term
liabilities and shareholders' equity
(e) Both (a) and (d) above.
(1 mark)
26. Moin Limited manufactures plastic bags. The company’s directors have projected the following sales
for the next three months:
October 2004 2,10,000 Units
November 2004 3,60,000 Units
December 2004 4,10,000 Units
Opening stock of finished goods on October 01, 2004 is 30,000 units. The company has some problems
recently in supplying its customers promptly and the directors have decided to aim for a 10% increase
in finished goods closing stock at the end of each of the three months.
Each bag uses 1.5 kg of plastic that costs Rs.6 per kg. The stock of plastic on October 01, 2004 is
50,000 kg. The raw material is readily obtainable, but in order to ensure that the company will not run
out of stock, the directors would like to increase the closing stock of plastic by 10% each month for the
next three months.
The amount of raw material to be purchased during the month of December 2004 will be
(a) Rs.41,67,060 (b) Rs.42,10,260 (c) Rs.38,47,260 (d) Rs.37,58,970 (e)
Rs.38,40,060.
(2 marks)
27. An ABC (Activity Based Costing) cost allocation system excludes consideration of
(a) Variable non-manufacturing costs
(b) Direct costs of materials
(c) Committed fixed costs
(d) Costs allocated to service departments using the reciprocal costing method
(e) Manufacturing fixed overhead costs.
(1 mark)
28. To identify the interrelationships between key activities and resources consumed is a part of the
(a) Activity Based Costing method of cost allocation
(b) Classification of costs as either fixed, mixed, variable or semi-fixed
(c) Absorption costing method
(d) Step-down method to allocate cost pools from one service department to other service departments
(e) Reciprocal services method.
(1 mark)
29. Basha Ltd. has furnished the following data:
Particulars Budgeted Actual
Fixed Overheads Rs.3,75,000 Rs.3,77,500
Output per labor hour 2 units 1.9 units
Number of working days 25 27
Labor hours per day 5,000 5,500
Fixed overhead volume variance is
(a) Rs.40,225 (favorable) (b) Rs.40,225 (adverse)
(c) Rs.45,225 (favorable) (d) Rs.45,225 (adverse) (e) Rs.48,225 (favorable).
(2 marks)
30. Budgets are an important management process for
(a) Planning and costing (b) Directing and process analysis
(c) Planning and controlling (d) Investing and financing
(e) Implementation of accounting system.
(1 mark)
31. The master budget is a proforma financial statement. It summarizes all the planned activities of all
subunits. The information comprises
(a) General estimates of financial targets and costs
(b) Detailed schedules and financial statements
(c) Activity cost drivers and cost-volume-profit analyses
(d) Planned expenditures for new facilities and financing plans
(e) Changes in financial cash flows only.
(1 mark)
32. There is no conceptual difference between a budget amount and a standard amount if standards are
(a) Ideal standards (b) Perfection standards
(c) Currently attainable standards (d) Flexible standards (e) Controllable standards.
(1 mark)
33. When a normal costing system is used, budgeted rates would be used for applying costs by the
absorption-costing method for
(a) Direct labour and variable factory overhead
(b) Variable factory overhead and fixed factory overhead
(c) Fixed factory overhead and direct materials
(d) Direct materials and direct labour
(e) Fixed factory overhead and direct labour.
(1 mark)
34. Quality cost may include
I. Inspection costs
II. Rework costs
III. Lost sales
IV. Redesign of the production process
(a) Only (I) above
(b) Both (I) and (III) above
(c) (I), (II) and (III) above
(d) Both (I) and (II) above
(e) All (I), (II), (III) and (IV) above.
(1 mark)
35. Rama Ltd. produces a single product – ‘k’. The following budgeted data are available for the month of
September 2004:
Production (units) 15,000 25,000
Flexible budget data: (Rs.) (Rs.)
Material 30,000 50,000
Labor 45,000 75,000
Factory overhead:
Indirect material 15,000 25,000
Indirect labor 30,000 50,000
Supervision 26,250 33,750
Heat, Light and Power 15,250 22,750
Depreciation 63,000 63,000
Insurance and Taxes 8,000 8,000
Total factory overhead 1,57,500 2,02,500
Total Manufacturing cost 2,32,500 3,27,500
Other information for the month of September 2004:
Standard time 0.5 direct labor hour per unit of product
Normal capacity 10,000 direct labor hours
iii. Units produced 22,000 units
iv. Actual labor hours 10,700 hours.
Factory overheads incurred Rs.1,91,000.
Standard factory overhead rates are based on direct labor hours.
The overhead efficiency variance and overhead capacity variance are
(a) Rs.2,700 (F) and Rs.4,700 (A) respectively (b) Rs.2,700 (F) and Rs.9,000 (F) respectively
(c) Rs.2,700 (A) and Rs.4,700 (F) respectively (d) Rs.2,700 (A) and Rs.9,000 (A) respectively
(e) Rs.4,700 (A) and Rs.2,700 (A) respectively.
(2 marks)
36. Yasoda Garments Ltd. (YGL) sells a line of women’s dresses. YGL’s performance report of
September 2004 is as follows:
The company uses a flexible budget to analyze its performance and to measure the effect on operating
income of the various factors affecting the difference between budgeted and actual operating income.
Particulars Actual Budget
Dresses sold (units) 5,000 6,000
Sales (Rs.) 2,35,000 3,00,000
Variable costs (Rs.) (1,45,000) (1,80,000)
Contribution margin (Rs.) 90,000 1,20,000
Fixed costs (Rs.) (84,000) (80,000)
Operating income (Rs.) 6,000 40,000
The effect of the sales quantity variance on the contribution margin and the variable cost flexible
budget variance for October 2004 is
(a) Rs. 20,000 unfavorable and Rs. 5,000 favorable respectively
(b) Rs. 18,000 unfavorable and Rs. 5,000 unfavorable respectively
(c) Rs. 20,000 unfavorable and Rs. 4,000 favorable respectively
(d) Rs. 15,000 unfavorable and Rs. 4,000 unfavorable respectively
(e) Rs. 30,000 favorable and Rs. 5,000 favorable respectively.
(2 marks)
37. Zinta Ltd. uses a Standard costing system. The following details have been extracted from the standard
cost card in respect of direct materials for the month of September 2004:
Material usage per unit – 8 kg at the rate of Re.0.80 per kg
Budgeted production – 850 units
The company has furnished the following data relating to direct material for the month of September
2004:
Materials purchased 8,200 kgs at a price of Rs.6,888
Materials issued to production 7,150 kgs
Actual production 870 units
The material price and material usage variances are
(a) Rs.286 (A) and Rs.152 (A) respectively (b) Rs.286 (A) and Rs.280 (A) respectively
(c) Rs.286 (A) and Rs.294 (A) respectively (d) Rs.328 (A) and Rs.152 (A) respectively
(e) Rs.328 (A) and Rs.280 (A) respectively.
(2 marks)
38. Deekay Ltd. uses a standard absorption costing system. The following data have been extracted from
its budget for the month of September 2004:
Fixed production overhead cost Rs.48,000
Production 4,800 units
In September 2004, the fixed production overhead cost was under absorbed by Rs.8,000 and the fixed
production overhead expenditure variance was Rs.2,000 (Adverse).
The actual number of units produced was
(a) 5,800 units (b) 5,400 units (c) 5,000 units (d) 4,200 units (e) 3,800 units.
(2 marks)
39. The data relating to Mehar Ltd. for the month of September 2004 are as follows:
Output (units) 6,500
Wages paid for 16,250 hours Rs. 48,750
Material 4,000 kg Rs. 34,000
Variances Rs.
Labor rate 1,875 (A)
Labor efficiency 1,275 (F)
Labor idle time 700 (A)
Material price 1,850 (F)
Material usage 1,200 (F)
The standard prime cost per unit is
(a) Rs. 13.00 (b) Rs. 12.73 (c) Rs. 7.30 (d) Rs. 7.50 (e) Rs. 5.70.
(2 marks)
40. Monarch Ltd.has furnished the following production budget pertaining to a single product for the
month of September 2004:
Production quantity 2,40,000 units
Production costs:
Material 3,36,000 kg at Rs.4.10 per kg
Direct labor 2,16,000 hours at Rs.4.50 per hour
Variable overheads Rs. 4,75,200
Fixed overheads Rs.15,21,600
The variable overheads are absorbed at a predetermined direct labor hour rate and the fixed overheads
are absorbed at a predetermined rate per unit of output.
During the month the actual production was 2,20,000 units and the following costs were
incurred:
Material 3,13,060 kg at Rs.12,45,980
Direct labor 1,94,920 hours at Rs.8,86,886
Variable overheads Rs.4,33,700
Fixed overheads Rs.15,01,240
The variable overhead efficiency variance and fixed overhead volume variance are
(a) Rs.1,900 (F) and Rs.1,26,800 (A) respectively
(b) Rs.6,776 (F) and Rs.1,06,440 (A) respectively
(c) Rs.6,776 (F) and Rs.4,876 (A) respectively
(d) Rs.6,776 (F) and Rs.1,26,800 (A) respectively
(e) Rs.4,876 (A) and Rs.1,26,800 (F) respectively.
(2 marks)
41. Performance reports should be designed to meet organizational needs. In this regard, which of the
following are normally included in performance reports?
I. Specific time horizons
II. Strategic plans
III. Exceptional items that are controllable
IV. A relationship to the organizational structure
V. A user focus.
(a) (I), (II) and (IV) above (b) (I), (II), (III) and (IV) above
(c) (I), (II), (IV) and (V) above (d) (I), (III), (IV) and (V) above
(e) (I), (II), (III), (IV) and (V) above.
(1 mark)
42. For information to be relevant
(a) The accounting department is responsible for all cost accounting and financial reporting activities
(b) Critical processes and key success factors are the primary activities for which accounting data is
gathered
(c) Lower-level managers are responsible for meeting specific objectives and reporting on the results
(d) Everyone in the organization is accountable for achieving corporate goals
(e) An accounting system where activity based costing is implemented.
(1 mark)
46. In which type of responsibility center the manager is held accountable for its profits?
I. Cost center
II. Profit center
III. Revenue center
IV. Investment center
(a) (II), (III) and (IV) above (b) Only (II) above
(c) Both (I) and (II) above (d) Both (II) and (III) above
(e) Both (II) and (IV) above.
(1 mark)
47. While preparing a performance report for a cost center using flexible budgeting techniques, the planned
cost column should be based on
(a) Cost incorporated in the master budget
(b) Budgeted amount in the original budget prepared before the beginning of the period
(c) Budget adjusted to the actual level of activity for the period being reported
(d) Actual amount for the same period in the preceding year
(e) Budget adjusted to the planned level of activity for the period being reported.
(1 mark)
48. The following data pertain to Division X of Pioneer Ltd. for the year 2003-04:
Sales Rs.6,20,000
Operating Margin 11.29%
Capital turnover 4
Imputed interest rate 13%
63. Moti Ltd. pays commission to its salesmen in the month the company receives cash for sales, which is
equal to 4% of the cash inflows. The company has budgeted sales of Rs.3,15,000 for October 2004,
Rs,4,25,000 for November 2004 and Rs.4,85,000 for December 2004. 50% of the sales are on credit.
Experience indicates that 70% of the budgeted credit sales will be collected in the month following the
sales. 25% are expected to be realized in the second month following the month of sales and remaining
5% will be non-recoverable.
The total amount of sales commission for the month of December 2004 is
(a) Rs.24,750 (b) Rs.21,250 (c) Rs.18,750 (d) Rs.17,225 (e) Rs.15,650.
(2 marks)
64. Leo Toys manufactures a toy monkey with moving parts and a built-in voice box. Projected sales for 5
months are as follows:
Month Projected sales in units
November 2004 4,000
December 2004 4,300
January 2005 4,500
February 2005 4,250
March 2005 4,400
Each toy requires direct materials from a supplier at Rs.35 for moving parts. Voice boxes are purchased
from another supplier at Rs.10 per toy. Labor cost is Rs.20 per toy and variable overhead cost is Rs.5 per
toy. Fixed manufacturing overhead applicable to production is Rs.41,000 per month. It is the practice of
the company to manufacture an output in a month which is equivalent to 1.2 times of the following
month’s sales.
The production budget for the month of December 2004 and the production cost budget for the month of
January 2005 are
(a) 4,800 units and Rs.3,78,000 respectively
(b) 5,400 units and Rs.3,98,000 respectively
(c) 5,160 units and Rs.3,98,000 respectively
(d) 5,400 units and Rs.3,57,000 respectively
(e) 5,280 units and Rs.3,24,000 respectively.
(2 marks)
65. ABC Ltd. is producing three complimentary products .The demand for the products is very much
fluctuative. The demand estimates for the products at normal capacity are as follows:
Product Selling price (Rs.) Unit Variable cost (Rs.) Sales units
A 10 4 15,000
B 15 8 20,000
C 18 9 5,000
Fixed cost is Rs.80,000(totally indirect cost).At the end of the budget period the total sales margin
variance is found to be Rs.1,65,000 (Adverse) but the same sales mix, cost and price were maintained
because of the complimentary nature. If there are no opening and closing inventories of WIP, finished
goods and raw materials, the fixed overhead cost variance is
(a) Rs.48,000 (Favorable) (b) Rs.48,000 (Adverse)
(c) Rs.85,000 (Adverse) (d) Rs.85,000(Favorable) (e) Nil.
(2 marks)
66. Eslow Ltd. manufactures a single product using three raw materials J, K and L. The details of standard
cost and actual cost for the month of September 2004 are as under:
Standard Cost
Particulars Kg Price per kilogram (Rs.)
Material J 15 4
Material K 12 3
Material L 8 6
35
Less: Standard loss 3
Standard Yield 32
Actual Cost
Particulars Kg Price per kilogram (Rs.)
Material J 1,680 4.25
Material K 1,650 2.80
Material L 870 6.40
4,200
Less: Loss 552
Actual Yield 3,648
The material yield variance is
(a) Rs.2484 (A) (b) Rs. 864 (A) (c) Rs.2484 (F)
(d) Rs. 791 (F) (e) Rs 791 (A).
(2 marks)
67. Shivam Ltd. uses standard process costing method. The standard process cost card per month shows that
3 hours of direct labor is required to produce one kg. of finished product and the fixed overheads, which
are recovered on direct labor hours, amount to Rs.180 per kg. of output. The budgeted output is 1,000 kg.
per month. Actual production during the month of September 2004 is 1200 kg. and the direct labor hours
utilized during the month were 3,300.
The details of opening and closing work-in progress (WIP) are as under:
Opening work-in-progress – 250 kg. (Degree of completion of labor and overheads – 60%)
Closing work-in-progress – 450 kg. (Degree of completion of labor and overheads – 20%)
The company uses FIFO method for evaluation of stocks.
The fixed overhead efficiency variance is
(a) Rs.25,200 (Adverse) (b) Rs.18,000 (Favorable)
(c) Rs.18,000 (Adverse) (d) Rs. 7,200 (Favorable)
(e) Rs. 7,200 (Adverse).
(2 marks)
68. Alpha Ltd. Is preparing sales budget for 3rd quarter .The details of the first two quarters are
69. Free Flow Ltd. presently sells 50,000 executive model pens per month. In next budget period it wants to
produce economy model. The details are as follows:
71. The standard and actual data for a product are as under
Standard Actual
Particulars
Quantity Kg Rs. Quantity Kg Rs.
Raw Material I 300 4 per unit 350 4.50 per unit
Raw Material II 200 3 per unit 160 2.80 per unit
Out put (units) 1,200 1,160
By how much percentage, the deviation of actual prices from standard prices has contributed in material
cost variance?
(a) 50.53% (b) 54.53% (c) 60.53% (d) 55.33% (e) 61.33%.
(2 marks)
= Rs.9,000 (F)
36 : (a)
. Reason : The sales quantity variance is the difference between the actual and budgeted units,
times the budgeted unit contribution margin. (5,000-6,000) x Rs. 1,20,000/6,000 = Rs.
20,000 unfavorable. The variable cost flexible budget variance is equal to the
difference between actual variable costs and the product of the actual quantity sold
and the budgeted unit variable cost (Rs.1,80,000¸6,000 = Rs.30), (Rs. 30 x 5,000) –
Rs. 1,45,000 = Rs. 5,000 favorable.
37 : (d)
. Reason : Material price variance = 8,200 kgs x Rs.0.80 – Rs.6,888
= Rs.6,560 – Rs.6,888 = Rs.328 (Adverse)
Material usage variance = Rs.0.80 (870 units x 8 kgs – 7,150 kgs)
= Rs.0.80 (6,960 kgs – 7,150 kgs) = Rs.152 (Adverse)
38 : (d)
. Reason :
Budgeted cost Rs.48, 000
Rs.10
Budgeted output 4, 800
Standard fixed overhead rate =
Overheads incurred = Budgeted fixed production overhead cost +
Expenditure variance = Rs.48,000 + Rs.2,000 =
Rs.50,000
Overheads absorbed = Actual overhead – Underabsorption of overheads
= Rs.50,000 – Rs.8,000 = Rs.42,000
Actual number of units = Rs.42,000 ¸ Rs.10 = 4,200 units.
39 : (a)
. Reason : Actual cost
Standard material cost = Actual material cost + Favorable material price variance +
Favorable material usage variance
Standard wages = Actual wages paid + favorable labor efficiency variance – adverse
labor rate variance – adverse labor idle time variance
Particulars Total Per unit
Standard material cost (34,000 + 1,850 + 1,200) 37,050 5.70
Standard wages (48,750+1,275 – 1,875 – 700) 47,450 7.30
Total 84,500 13.00
40 : (d)
. Reason :
Standard variable overhead rate=Rs.4,75,200¸2,16,000 hrs = Rs.2.20 per hour
Standard hours per unit = 2,16,000 hours¸2,40,000 units= 0.9 hours
Fixed overhead rate per unit = Rs.15,21,600¸2,40,000 units= Rs.6.34
Variable overhead efficiency variance:
=(Standard hours for actual production- Actual hours) x Standard rate per hour
=(2,20,000 units x 0.9 hours ~ 1,94,920) x Rs.2.20=3,080 x Rs. 2.20 = Rs.6,776 (F)
Fixed overhead volume variance
=(Actual output ~ Budgeted output) x Standard rate
=2,20,000 units ~ 2,40,000 units) x Rs.6.34= 20,000 units x Rs.6.34= Rs.1,26,800
(A)
41 : (d)
. Reason : Performance reports should be related to the organizational structure and it should
have a user focus. It should have specific time horizons and all controllable items
should be included in the performance report, even extraordinary items. Strategic
plans, however, are not included in a performance report because they are long-range
and concern the environment in which the organization operates.
42 : (c)
. Reason : Relevant information is defined as information which is related to the future and is
different under alternative courses of action and is accurate.
43 : (d)
. Reason : The reports for the lower level of management are fairly detailed though limited in
scope and they are quantitative in nature and less financial data. The reports for the
management are highly summarized.
44 : (b)
. Reason : Scrap and costs of spoiled units that cannot be salvaged are examples of internal
failure costs. These are the costs associated with materials and products that fail to
meet quality standards and result in manufacturing losses. These defects are identified
before the goods are shipped to customers. Hence the is (b). Appraisal costs are
incurred to ensure that materials, products and services meet quality standards. They
begin with the inspection of raw materials and parts from vendors. External failure
costs are the costs incurred when inferior-quality products or services are sold to
customers. Prevention costs are the costs incurred to reduce the number of defective
units produced or the incidence of poor-quality service. Committed cost is fixed costs
which results from the decision of the management in the prior period and is not
subject to the management control in the present on a short-run basis.
45 : (c)
. Reason : Responsibility accounting systems assign responsibility for a group of organizational
activities and objectives to lower-level managers, and then monitor and report on the
results. Lower-level managers play a key role in responsibility accounting systems.
46 : (e)
. Reason : The managers of a profit center or an investment center are accountable for the
center's profit.
47 : (c)
. Reason : When preparing a performance report for a cost center using flexible budgeting
techniques, the planned cost column should be based on budget adjusted to the actual
level of activity for the period being reported
48 : (e)
. Reason : Capital Turnover = Sales/Capital
4 = Rs.6,20,000 / Capital
So Capital = Rs.6,20,000/4 = Rs.1,55,000
Residual Income = Operating Income- (Capital*Imputed Interest rate) = Rs.6,20,000
11.29
x 100 – (Rs.1,55,000 x 0.13) = Rs.69,998 – Rs.20,150= Rs.49,850 (Approx).
49 : (b)
. Reason : A production budget is based on sales forecasts, in units, with adjustments for
beginning and ending inventories. It is used to plan when items will be produced.
After the production budget has been completed, it is used to prepare materials
purchases, direct labor, and factory overhead budgets.
(a) is incorrect because a production budget is usually prepared in terms of units of
output rather than costs. s (c) and (d) are incorrect because the direct labor and
materials purchases budgets are prepared after the production budget. (e) is incorrect
because the production budget is not summarization of discretionary costs.
50 : (a)
. Reason : Establishment and maintenance of an internal control structure rests with the
management. An internal control structure is established to provide able assurance
that the organization’s objectives are achieved.
Options (b) and (e) are not correct because these individuals are only responsible to
the extent that they are a part of the management team.
Options (c) and (d) are not correct because auditors must consider the internal control
structure, but they do not establish and maintain it.
51 : (b)
. Reason : Goal congruence occurs when employees, working in their own interests, make
decisions that help meet the overall goals of the organization.This condition exists
when individuals and groups aim to achieve the same organizational goals.
52 : (d)
. Reason : Generally accountancy is the language of the business through which different
information’s can be provided to different groups of people. In case of Management
accountancy the recipient of the information is Management. Obviously the purpose
of Management accountancy is to facilitate the functions of the recipient of
information i.e. management which includes control. So ,the two internal roles of
management accounting are to supply information to assist managers in making better
planning decisions and using management accounting information as controls to
ensure the organization's members are acting in the organization's best interest. Hence
(d) is correct.
53 : (a)
. Reason : Machine activity cost per hour =
Particulars Rs.
Sales (40,000 units) 14,40,000
Less: Profit margin – 20% 2,88,000
Cost of sales – (80% of Rs.14,4,000) 11,52,000
Less: Variable overheads –
Rs.2,40,000
Semi-variable overheads –
Rs.2,60,000
Fixed overheads – 7,00,000
Rs.2,00,000
Prime cost 4,52,000
2. Semi-variable overheads:
Change in cos t Rs.3,00,000-Rs.2,60,000
Change in units 50,000 units-40,000 units
Variable cost = =
Rs.40, 000
10, 000 units
= = Rs.4per unit
At 40,000 units
Fixed cost = Total cost – Variable cost
= Rs.2,60,000 – 40,000 units ´ Rs.4 = Rs.1,00,000
At 45,000 units
Total cost = 45,000 units ´ Rs.4 + Rs.1,00,000=Rs.2,80,000
Computation of differential cost of production of 5,000 additional units (i.e. 10%
of normal capacity):
Differential cost
40,000 units 45,000 units
Element of cost for 5000
(Rs.) (Rs.)
units (Rs.)
Prime cost – (Working Note 1) 4,52,000 5,08,500 56,500
Variable overhead 2,40,000 2,70,000 30,000
Semi variable overhead (Working Note 2) 2,60,000 2,80,000 20,000
Fixed overhead 2,00,000 2,00,000 –
11,52,000 12,58,500 1,06,500
Rs.1, 06, 500
Cost per unit of new order = 5, 000 = Rs.21.30
Profit margin 25% (20% on sale = 25% on cost)= Rs. 5.33
Minimum selling price per unit = Rs.26.63
63 : (d)
. Reason :
Cash sales for December 2004 (Rs.4,85,000 x 0.5) Rs.2,42,500
Cash flows for the credit sales in the month of October 2004
Rs.39,375
(Rs.3,15,000 x 0.5 x 0.25)
Cash flows for the credit sales in the month of November 2004
Rs.1,48,750
(Rs.4,25,000x 0.5 x 0.7)
Rs.4,30,625
Total commission payable to salesmen = Rs.4,30,625 x 4% = Rs.17,225
64 : (b)
. Reason : The production budget for December 2004= 4,500 units x 1.2 = 5,400 units
The production cost budget for January 2005
= 1.2 x 4,250 units x (Rs.35 + Rs.10 + Rs.20 + Rs.5) + Rs.41,000
= Rs.3,57,000 + Rs.41,000 = Rs.3,98,000.
65 : (b)
. Reason : Here the Total sales Margin variance is Rs.1,65,000 (Adverse ) implies the actual
sales margin (contribution) = Budgeted sales margin –Rs.1,65,000
= [15,000 x Rs.6+20,000 x Rs.7+5,000 x Rs.9] –Rs.1,65,000
= Rs.2,75,000-Rs.1,65,000 = Rs.1,10,000.
Here sales mix ratio is 3:4:1.Let us assume a composite unit has 3 units of product
A,4units of product B and 1 unit of product C. So, contribution from composite unit =
3 x Rs.6+4 x Rs.7+1 x Rs.9=Rs.55.
Number of composite units to be sold and produced = Contribution of Rs.1,10,000 /
Rs.55 = 2,000 units .i.e.
A-2,000 x 3=6,000 units
B-2000 x 4=8,000 units
C-2000 x 1=2,000 units.
The budgeted number of composite units is 5,000 units.
Standard rate per composite unit=Rs.80,000/5,000=Rs.16
Total overhead cost variance = Actual units x Standard rate – Actual cost
= 2,000 x Rs.16 – Rs.80,000 = Rs.48,000 (adverse)
66 : (b)
. Standard cost per unit of output
15 4 12 3 8 6 144
= 32 = 32
= Rs.4.50
Material yield variance = (Actual yield – Standard yield for actual input) ´ Standard
cost per unit of output
4, 200
3, 648 35 32 4.50
= = (3,648 – 3,840) ´ 4.50 = 864 (A)
67 : (d)
. Reason :
Completed stock:
Total 1,140
From opening work-in-progress 250 40 % 100
Closing work-in-progress 450 20 % 90
Current production 950 100 % 950
Units Degree of completion Overheads
Budgeted rate per unit = Rs.180
No. of direct labor hours per unit = 3
Budgeted rate per hour = Rs.60
Standard hours for actual production = 1,140 x 3 = 3,420 hours
Fixed overhead efficiency variance = (Standard hours for actual production – Actual
hours) x budgeted rate per hour = (3,420 hours – 3,300 hours ) x Rs.60 = Rs.7,200 (F)
68 : (c)
. Reason : Profit for 1st quarter = Rs.8,000 – (4,00+3,000) = Rs.1,000
Variable portion of production overheads:
For 200 units= Rs.4,000
For 240 units = Rs.4,100 ( if there is no reduction in fixed overheads)
So, variable over head per unit =(Rs.4,100 –Rs.4,000)/(240-200) = Rs.2.50
Fixed over heads = Rs.4,000 – (200 x 2.50) = Rs.3,500
Because of decrease in fixed over heads , the actual fixed overheads = Rs.3,300
Total variable cost per unit = Prime cost per unit + variable overhead per unit=
(Rs.3,000/ 200)+Rs.2.50= Rs.17.50
Actual variable cost after 20% increase = Rs.17.50 ´ 1.2 = Rs.21
Selling price per unit = Rs.8,000 / 200 = Rs.40 (same as 1st quarter)
Profit per unit = Rs.1,000/ 200 = Rs.5 (same as 1st quarter)
Contribution per unit = Rs.40-Rs.21=Rs.29
Let the number of units to be sold to make a profit per unit of Rs.5 be X then
29X – Rs.3,300 = Rs.5X
X=138 units.
69 : (d)
. Reason : Additional profit required = 10% of 3,00,000 = Rs.30,000.
Contribution per unit of executive model = Rs.10-Rs.6 = Rs.4
Contribution per unit of economy model = Rs.2.00 - Rs.0.70 = Rs.1.30, but sale of
every 10 units of economy model decreases the sales of executive model by 1 unit i.e.
decrease in contribution per unit of sale of economy model = Rs.4.00 /10 = Re.0.40
So, the net contribution per unit of sale of one unit of economy model
= Rs.1.30 –Re.0.40 =Re.0.90
Number of units of economy model to be sold to get a profit of Rs.30,000
= (Rs.20,000+Rs.30,000) /Re 0.90 = 55,556 units
70 : (c)
. Reason : Now ROI = (Rs.2,00,000 x 100)/Rs.10,00,000 = 20%.
Profit Margin Ratio =(Rs.2,00,000 x 100 )/Rs.18,00,000 =Rs.11.11%
In next year the assets = Rs.10,00,000 + 5% of 10,00,000 = Rs.10,50,000
Since ROI is same, profit for next year = 20% of Rs.10,50,000 = Rs.2,10,000
Since profit margin ratio is also same , the sales will be = Rs.2,10,000 / 0.1111
= Rs.18,90,190
Increase in sales = Rs.18,90,190 – Rs.18,00,000 = Rs.90,190.
% increase in sales =(Rs.90,190 x 100 )/Rs.18,00,000 = 5%.
71 : (a)
. Reason : Standard cost per unit of output = (300 x Rs.4 +200 x Rs.3.00) / 1200 = Rs.1.50
Material cost variance = Actual cost of materials – Standard cost of actual output
= (350 x Rs.4.50 + 160 x Rs.2.80)-(1,160 x Rs.1.50) = Rs.2,023 – Rs.1,740 = Rs.283
(A)
Material price variance = Actual quantity ( Actual price – Standard price) = 350
(Rs.4.50- Rs.4)+160 (Rs.2.80- Rs.3.00) = Rs.175 – Rs.32 = Rs.143 (A)
Material price variance represents variance due to deviation of actual prices from
standard prices. It’s percentage in total variance = (143/283) x 100 = 50.53%.
72 : (d)
. Reason : At 50% capacity loss = Rs.8,000
At 40% capacity loss = Rs.20,000
So every 1% increase in capacity utilization increases profit by Rs.1,200
(i.e. (Rs.20,000 – Rs. 8,000)/10%).
To get a profit of Rs.10,000 the extra profit required above 50% = Rs.10,000 +
Rs.8,000
= Rs.18,000
The extra capacity required for an extra profit of Rs.18,000 = Rs.18,000/Rs.1,200
=15%
So, the capacity utilization for a profit of Rs.10,000 = 50% + 15% =65%.
OF THE DOCUMENT