Job No : 10/jodb011-ke/3703/viii/2014
Owner : PT.KRAKATAU STEEL
Main Cont : PT KRAKATAU ENGINEERING
Inspection & test Description
ELECTRICAL INSTRUMENT
Scope of Quality Plan by
No. Quality Plan (Activity)
CPK PT KE
I. ELECTRICAL WORKS
1.1 Material / Equipments Receiving / Verification I W
1.2 SUBSTATION I W
1.2.1 SWGR/MCC I W
a. Visual Inspection I W
b. Install & Termination I W
c. Tightening Check of Bus Bar I W
d. Dielectric Test I W
e. Operation Test - W
f. Input Test (If Any) I W
g. Insulation Resitance Test I W
h. Loop Test I W
3.6 TRANSFORMER
a. Visual Inspection I W
- Hy Pot Test (If Any) I W
- Wearing Diagram Check I W
- Bolt Tigning (torsi) I W
b. Insulation Resistance Test & Wiring I W
c. Install I W
d. Terminating I W
e. Function Test I I
II INSTUMENT WORKS
2.1 Material & Equipments Receiving Inspection I W
2.2 FIELD INSTRUMENTS
a. Visual Inspection I W
- Loop Test I W
b. Continyity Test I W
c. Install I W
d. Function Test I I
2.4 PLC
a. Visual Inspection I W
b. Loop Check from Marshalling Rack I I
c. Marshalling Cabinet Check / Inspection I W
d. Install I W
e. Function Test I I
Revi: 0
Dat: 26 sept 2014
SW SW x
SW SW x
Eng Spec./Data Sheets,PC Drawing, QA/QC Procedure
SW SW x
SW SW x
SW SW x Eng.Spec./Data Sheets, Vendor's Doc,Matl/Equip.List, FC. Drawing
SW SW x Eng.Spec./Data Sheets,FC Drawing,QA/QC Procedure
26 sept 2014
Drawing,QA/QC Procedure
Drawing,QA/QC Procedure
Drawing,QA/QC Procedure
Drawing,QA/QC Procedure
Drawing,QA/QC Procedure
Drawing,QA/QC Procedure
ndor's Doc,Matl/Equip.List, FC. Drawing
Drawing,QA/QC Procedure
Drawing,QA/QC Procedure
Drawing,QA/QC Procedure
Drawing,QA/QC Procedure
Drawing,QA/QC Procedure
Drawing,QA/QC Procedure