The document discusses construction and rehabilitation work including:
1) Construction of cement concrete pavement 2 inches thick for roadways including placing, compacting, finishing, and curing.
2) Removal of debris from the site up to three miles.
3) Providing and installing high density polyethylene pipes in trenches for water supply lines.
The document discusses construction and rehabilitation work including:
1) Construction of cement concrete pavement 2 inches thick for roadways including placing, compacting, finishing, and curing.
2) Removal of debris from the site up to three miles.
3) Providing and installing high density polyethylene pipes in trenches for water supply lines.
The document discusses construction and rehabilitation work including:
1) Construction of cement concrete pavement 2 inches thick for roadways including placing, compacting, finishing, and curing.
2) Removal of debris from the site up to three miles.
3) Providing and installing high density polyethylene pipes in trenches for water supply lines.
Bitumen and 2" thick Cement concrete plain including placing, compacting, finishing and 17 6/5(f) Cft 330 curing complete(including screening and washing of stone aggregate) Ratio 1:2:4 Construction of Rate 18 chamberies 2x4 etc No 3 Analysis complete in all respect Removal of malba from Rate 19 site lead upto three mile Cft 58039 Analysis etc complete in all respect unexpected damage services like (Sui Gas, 20 water supply line, ptcl Job 1 ,optical fiber cables etc ) Required if any Rehabilitation of suction pipe at Disposal 2/4L Providing, laying, cutting, jointing, testing and disinfecting high density, 21 23/42 (d) polyethyene pipe Rft 8 (HDPE.100) working pressure pipe in trench etc complete in all respect Replacement of bend 18" 22 NS dia with HDPE etc No 1 complete in all respect. Labour charges for fixing of pipe and bend with 23 NS Job 1 special arrangements (30' to 35' deep in well)