to required camber, grade

and density. With 6%


Bitumen and 2" thick
Cement concrete plain
including placing,
compacting, finishing and
17 6/5(f) Cft 330
curing complete(including
screening and washing of
stone aggregate) Ratio 1:2:4
Construction of
Rate
18 chamberies 2x4 etc No 3
Analysis
complete in all respect
Removal of malba from
Rate
19 site lead upto three mile Cft 58039
Analysis
etc complete in all respect
unexpected damage
services like (Sui Gas,
20 water supply line, ptcl Job 1
,optical fiber cables etc )
Required if any
Rehabilitation of suction pipe at Disposal 2/4L
Providing, laying, cutting,
jointing, testing and
disinfecting high density,
21 23/42 (d) polyethyene pipe Rft 8
(HDPE.100) working
pressure pipe in trench etc
complete in all respect
Replacement of bend 18"
22 NS dia with HDPE etc No 1
complete in all respect.
Labour charges for fixing
of pipe and bend with
23 NS Job 1
special arrangements
(30' to 35' deep in well)

Contractor