5 M at km 18/6 of NH 219
Sl
Qty Description of Work Rate / Per Amount
No.
Earthwork excavation in all classes of soil except
soft rock not requiring blasting and hard rock
requiring blasting and depositing on bank with all
leads and lifts, including cost of all labour,
equipments and all incidental charges such as
baling our water, providing and maintaining
necessary cofferdams, sheeting, shoring bracing
and their subsequent removal, removal of all logs,
stumps, grubs and other deleterious matter and
1 121.72 cu.m obstructions, trimming bottom of excavation 110.27 /cu.m 13422
backfilling, and clearing the site and disposal of
all surplus materials etc., complete as per relevant
standard specification for foundation
DETAILED ESTIMATE
Measurements
Sl No Description of Work No Contents
L B D
1 Earthwork excavation in all classes of soil except hard rock requiring
blasting and depositing on bank with all leads and lifts as per SS20B
including cost of all labour equipment and all incidental charges such as
baling out water, providing and maintaining necessary coffer dams,
sheeting, shoring, bracing and their subsequent removal. Removal of all
logs, stumps grubs and other deleterious matter and obstruction, trimming
bottom of excavation, back filling, and clearing the site and disposal of all
surplus material etc., complete as per relevant standard specification for
foundation.
foundation for Base 1 x 1 3.30 15.20 0.53 26.58
Slab
1 x 2 0.30 3.30 0.67 1.33
(0.82/2)
1 x 2 0.41 3.30 0.67 1.81
For Wing Walls 1 2 x 2 5.00 2.30 2.00 92.00
121.72
(or) 121.72 cu.m
2 Vibrated Cement concrete in M-20, using ISS HBG including cost and
conveyance of all materials to site and cost of cement at site including soft
water, labour charges for mixing, transporting, laying and curing concrete,
tools and plants and incidental charges as baling out water, maintaining of
protective bunds, cofferdams, shorting, strutting etc., complete as per
relevant standard specification for foundation.
(1.12+0.3)/2
for key slab 1 x 2 3.10 0.710 0.82 3.61
Side walls 1 x 2 0.30 15.00 1.50 13.50
1/2 *.15*.15
haunch 1 x 4 15.00 0.15 0.075 0.68
Deck Slab 1 x 1 2.10 15.00 0.35 11.03
46.49
(or) 46.49 cu.m
4 Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.30 Kg/sqm on the Concrete surface
cleaded with mechanical broom all complete as per Technical
Specification MoRTH503
5 Providing and laying Bituminous concrete using CRMB with 100 - 120 THP
hot mix plant producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading premixed with bituminous binder
as specified by Job Mix Formula(JMF) by weight of total mix and filler,
trnsporting the hot mix to site, laid over a previously prepared surface with
a hydrostatic paver finisher with sensor control to the required grade, level
and alignment and rolled with smooth wheeled, vibratory and tandom
rollers to acheieve the desired compaction as per clause 507 of MORT & H
specifications complete in all respects. - Grading II
3.69
(or) 3.69 mt
7 Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST
drawing No.SD/205 with grating arrangements at top as shown in the
drawing including cost and conveyance of GI pipes and flats and fixing
them in position etc., complete
8 Vibrated cement concrete of grade M20 using ISS HBG metal including
cost and conveyance of all materials to site including cost of cement at site
including cost of form work, soft water, labour charges for mixing
transporting, laying, and curing concrete, working at depths, tools and
plants and maintaining of protective bunds, cofferdams, shoring, strutting,
etc, complete as per relevent standard specifications for Wings walls, Toe
walls, Curtain walls & parapet wall.
0.125
Haunch 150 x 150mm
0.50
0.35
L= 15.00
a= 1.50
b= 1.50
1.50 c= 0.50
0.30 1.50 0.30 d= 0.35
e= 0.38
f= 0.30
0.50 0.50
0.10 0.38
0.10
0.15
3.10
Wingwall Length= 5.00
3.30
0.45
15.00 0.50
0.54
0.35
1.50 1.85
0.38
1.20 1.12 12.76 2.10
0.15
0.82 0.82 0.15
0.10 0.30 2.30
0.82 Cross Section of PCC Wing wall
Name of Work :- Construction of BOX Culvert of 1.5 M X 1.5 M at km 18/6 of NH 219
BAR BENDING SCHEDULE - ( as per SD 108)Name of Work :- Construction of BOX Culvert of 1.5 M X 1.5 M at
km 18/6 of NH 219
TOTAL UNIT
Sl No SHAPE OF BARS TYPE OF DIA IN SPACING LENGTH Nos LENGTH (in WEIGHT ( in TOTAL WEIGHT ( in Kg)
BARS ‘mm’ IN ‘mm’ (in ‘m’) ‘m’) Kg/ m)
1 1 10 250 3.500 61 213.50 0.617 131.730
0.78 0.78
2.00
2 0.7 0.7 2 16 250 3.434 122 418.95 1.578 661.103
2.13
3 3 0 200 1.050 76 79.80 0 0.000
1.05
4 3.00 4 16 250 3.464 61 211.30 1.578 333.431
0.28 0.28
0.2 2.13
0.70
6 2.00 6 16 250 2.354 61 143.59 1.578 226.585
0.225 0.225
1.05
8 2.00 8 10 250 3.440 61 209.84 0.617 129.471
0.75 0.75
14.90
17 1.006 17 12 250 2.772 122 338.18 0.888 300.304
1.268
14.90
19 0.16 0.16 19 10 - 15.160 8 121.28 0.617 74.830
14.90
20 1.30 20 10 150 4.207 26 109.38 0.617 67.487
1.1 1.556
0.20
21 0.16 0.16 21 10 - 3.260 20 65.20 0.617 40.228
3.00
22 0.21 0.21 22 10 250 15.260 12 183.12 0.617 112.985
14.90
3692.977
3692.98 Kg
(or) 3.693 mt
COMMON DATA 2019 - 20 WITH SOR 2019-20
ROAD DATA AS ON 01.07.2019-HILLS-NH-181 EXTN- KM-50/0
- 171/4
II By Mechanical means
2.4 (ii). A. Dismantling Brick / Tile work in lime mortar: 401.37 / Cum
2.4 (ii). B. Dismantling Brick / Tile work in cement mortar: 532.02 / Cum
2.4 (ii). C. Dismantling Brick / Tile work in mud mortar: 349.12 / Cum
C. Extra over 2.4 (V) A and B for cutting rtivets: 19.49 /rivet
I. By Manual means:
A. By Manual means
Circle: SALEM
NH - 181 - Hills Km 50/0 - 171/4
Minor bridges in
Major and Minor
S. No. Description of item
Bridges
road packages and
culverts
B. Mechanical means:
497234822.xlsxabstract (2)
175
497234822.xlsxabstract (2)
176
497234822.xlsxabstract (2)
177
497234822.xlsxabstract (2)
178
497234822.xlsxabstract (2)
179
497234822.xlsxabstract (2)
180
497234822.xlsxabstract (2)
181
497234822.xlsxabstract (2)
182
497234822.xlsxabstract (2)
183
497234822.xlsxabstract (2)