BOQ
Sr.No. Description of Item Units Qty Rate Amount Remarks
1 Earth Work Excavation Work
Earth work excavation for foundations of buildings & trenches, using manual or
mechanical means, and depositing at site with an initial lead of 100 Mts including all
Cft 4,509.36 -
operational, incidental, labour charges such as shoring sheeting, planking, strutting etc.,
complete for finished item of work including dewatering .
Filling with good earth available at site, in trenches, plinth, sides of foundations, sub
base course to roads etc., including transporting, unloading, spreading, watering proper
consolidating with 10 tonne power roller (wherever 10 tonne power roller cannot be
Cft 973.68 -
operated the consolidation shall be done using 1 tonne vibro roller or heavy duty
powered earth rammer) in layers not exceeding 150mm thick and dressing the surface
complete as directed (Degree of consolidation 95% proctor density).
Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH
BATCHER / MIXER with 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and conveyance of all materials
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all
operational, incidental and labour charges such as weigh batching, machine mixing,
laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished.with minimum cement content as per IS code from standard
suppliers approved by the department including pumping, centering, shuttering, laying
concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication
charges for finished item of work for RCC FOOTINS, COLUMNS, PLINTH BEAM,
RETAINING WALLS, ROOF AND SLAB BEAMS.
Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The
exact quantities will be as per mix design. 2) As per mix design, if the cement content is
found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.
Providing rigid and water tight centering and shuttering using best quality water proof
plyboard sheets/ steel centering sheets including strutting, propping, bracing
etc.,complete for all R.C.C.items fixed in position as required including labour for careful
removal of form work etc.,complete all as per specifications in horizontal / vertical /
slanting surface Including lift charges in centering and formwork. Steel props and
adjustable spans only to be used. (Rate shall include for providing and applying
approved make demoulding / centring oil. Burnt oil shall not be used. Use of waste oil
or other oils will not be permitted).
Supply,Fabricating and fixing in position High yield Strength Deformed Bars Fe-500 /
500D grade conforming to IS: 1786-2008 of different diameters including
cutting ,cranking and bending to required sizes and shapes, Placing in position with
cover blocks of approved materials and sizes,tieing with 18guage soft drawn MS binding
wire forming reinforcement steel as per approved design and drawing to be supplied at
the time of execution of works including cost and coveyance, deformed bars,binding
wire,cover blocks and all operational and incidental labour charges such as
cutting,bending,placing in position,tieing etc. complete for finished item of work.
(Payment will be made on the basis of weight of fabricated deformed bars only) at all
heights, in all floors.The work shall be executed as per drawings and checked and
recorded.Bar bending schedule to be prepared by the contractor and got approved from
client before starting the cutting work.
Sr.No. Description of Item Units Qty Rate Amount Remarks
Footings MT 1.01 -
Plinth below Column MT 1.47 -
Retaining Wall MT 4.29 -
+103.50M Level Roof Beams and Slab MT 0.67 -