PROJECT

Doc. No.

BILL OF QUANTITIES FOR CIVIL AND ARCHITECTURAL


PARTICULARS
WORKS

Sl.
Item No. Description of Work Unit Quantity
No.
I CIVIL WORK
A FOUNDATION AND CONCRETING
1 EXCAVATOR, FILLING & ANTITERMITE.
1.1 Earthwork

Earth work in excavation by mechanical means


(Hydraulic excavator) / (manual ) means in foundation
trenches or drains, including dressing of sides and
ramming of bottoms, lift upto 10ft, including getting out
the excavated soil and disposal of surplus excavated soil
as directed, within a lead of 50 m. (All kinds of soil)

Foundation upto 5' CFT 4338

Foundation beyond 5' upto 10' CFT 4338


Plinth CFT 300

1.2 Backfilling
Filling available excavated earth (excluding rock) in
trenches, plinth,sides of foundations etc. in layers not
exceeding 20cm in depth,consolidating each deposited
layer by ramming and watering, lead upto 50 m and lift
upto 1.5 m.
In foundation CFT 6873
In Beneath Non suspended floor CFT 2361

1.3 Supplying and Fillings


Supplying and filling with sand under footing, plinth
including
watering, ramming, consolidating and dressing
complete.
Sand in foundation CFT 217
Sand in Plinth CFT 100
Sand in Non suspended floor CFT 240

1.4 Antitermite Treatment


Providing pre- constructional anti-termite treatment
and creating a continuous chemical barrier by using
Chlorpyrifos emulsifiable concentrate 20% with 1%
concentration under raft slab and beam and all-round
the footings, column pits, trenches, pits, tunnels, wall
trenches, back fill, plinth filling, junction of wall and
floor, side walls of basement floor external perimeter of
building upto the natural ground level ,surrounding of
pipes, expansion joints, etc. as per IS specification and
as per instruction of chemical manufacturer. The
treatment shall be carried out strictly in accordance with
IS6313(Part-2). Plinth area of the building at ground
floor will be measured and paid for.

SFT 1350

1.5 Polythene sheet

Supplying, providing, laying/spreading, lapping, sealing


150 microns polythene sheets of approved manufacturer
on top of blinding concrete as per manufacturer's
recommendations and all material and measures
required to complete the job.
In foundation SFT 868
In Plinth SFT 400

1.6 Bitumen paint

Providing and applying two coats of bituminous paint


at the rate of 1.2kg/m2, hot applied with bitumen of
grade 20-30, to external faces of underground concrete
structures after thorough cleaning the concrete surface
including all materials and measures required to
complete the job.
Footing SFT 1024
Base column SFT 669
Lift pit SFT 352
Plinth SFT 749

2 CONCRETOR
2.1 PCC 1:4:8 (MACHINE MIX)
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering - All work up to plinth level : 1:4:8 (1
Cement : 4 sand : 8 40mm aggregate)

In foundation CFT 217


In Plinth CFT 100
In Non suspended floor CFT 240

2.2 RCC - Sub Structure


MACHINE MIX M20
Providing and laying in position specified grade of
reinforced cement concrete, excluding the cost of
centering, shuttering, finishing and reinforcement - All
work up to plinth level : 1:1.5:3 (1 cement : 1.5 sand : 3
20mm aggregate)

Footing CFT 723


Base Column upto plinth level CFT 151
Plinth Beam CFT 281
Lift pit CFT 242
Belt beam CFT 89

2.3 RCC - Super Structure


2.3.1 Column (MACHINE MIX M20)
Reinforced cement concrete work in beams, spended
floors, roofs having slope up to 15° landings, balconies,
shelves, chajjas, lintels, bands, plain window sills,
staircases and spiral stair cases up to floor five level,
excluding the cost of centering, shuttering, finishing and
reinforcement, with 1:1.5:3
(1 cement : 1.5 sand : 3 20mm aggregate)

Column - From Plinth Beam Top to FFL CFT 34


Column - From FFL to Ground Floor Roof CFT 186
Column - From Ground Floor Roof to First floor Roof CFT 186
Column - From First Floor Roof To Second floor Roof CFT 186
Column - From Second Floor Roof To OHT base CFT 47
Column - From Second Floor Roof To Parapet wall
Level CFT 39

2.3.2 Beam (RMC M20)


Providing and laying in position ready mixed M-20
grade concrete for reinforced cement concrete work,
using cement content as per approved design mix,
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads,
having continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced cement
concrete work, including pumping of R.M.C. from
transit mixer to site of laying , excluding the cost of
centering, shuttering finishing and reinforcement,
including cost of admixtures in recommended
proportions as per IS : 9103 to accelerate/ retard setting
of concrete, improve workability without impairing
strength and durability as per direction of the Engineer -
in - charge. (All work above plinth upto floor V)

Ground floor roof beam CFT 261


First floor roof beam CFT 261
Second floor roof beam CFT 261
Head room roof beam CFT 34
OHT base beam CFT 34
Staircase - Mid landing beams(3nos) CFT 18

2.3.3 Slabs (RMC M20)


Providing and laying in position ready mixed M-20
grade concrete for reinforced cement concrete work,
using cement content as per approved design mix,
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads,
having continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced cement
concrete work, including pumping of R.M.C. from
transit mixer to site of laying , excluding the cost of
centering, shuttering finishing and reinforcement,
including cost of admixtures in recommended
proportions as per IS : 9103 to accelerate/ retard setting
of concrete, improve workability without impairing
strength and durability as per direction of the Engineer -
in - charge. (All work above plinth upto floor V)

Ground floor roof slab CFT 423


First floor roof slab CFT 423
Second floor roof slab CFT 437
Head room roof slab CFT 34
2.3.4 Staircase (RMC M20)
Providing and laying in position ready mixed M-20
grade concrete for reinforced cement concrete work,
using cement content as per approved design mix,
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads,
having continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced cement
concrete work, including pumping of R.M.C. from
transit mixer to site of laying , excluding the cost of
centering, shuttering finishing and reinforcement,
including cost of admixtures in recommended
proportions as per IS : 9103 to accelerate/ retard setting
of concrete, improve workability without impairing
strength and durability as per direction of the Engineer -
in - charge. (All work above plinth upto floor V)

Staircase - Ground floor CFT 39


Staircase - First floor CFT 39
Staircase - Second floor CFT 39

2.3.5 Lintels (MACHINE MIX)

Reinforced cement concrete work in beams, spended


floors, roofs having slope up to 15° landings, balconies,
shelves, chajjas, lintels, bands, plain window sills,
staircases and spiral stair cases up to floor five level,
excluding the cost of centering, shuttering, finishing and
reinforcement, with 1:1.5:3 (1
cement : 1.5 sand : 3 20mm aggregate)

1 Lintels - Ground floor 9" CFT 80


2 Lintels - First floor 9" CFT 71
3 Lintels - First floor 4.5" CFT 19
4 Lintels - Second floor 9" CFT 71
5 Lintels - Second floor 4.5" CFT 19

2.3.6 Sunshade & Loft( MACHINE MIX)


Reinforced cement concrete work in beams, spended
floors, roofs having slope up to 15° landings, balconies,
shelves, chajjas, lintels, bands, plain window sills,
staircases and spiral stair cases up to floor five level,
excluding the cost of centering, shuttering, finishing and
reinforcement, with 1:1.5:3 (1 cement : 1.5
sand : 3 20mm aggregate)
Sunshade (MACHINE MIX)
First floor CFT 19
Second floor CFT 19
Loft (MACHINE MIX)
First floor CFT 13
Second floor CFT 13
Over head tank (MACHINE MIX) CFT 129

3 FORMWORK
FORMWORK FOR FOOTING AND BASE
3.1
COLUMN
Centering and shuttering including strutting, propping
etc. and removal of form for : Foundations, footings,
bases of columns, etc. for mass concrete

1 Footing SFT 500


2 Base Column upto plinth level SFT 669
3 Lift pit SFT 424

3.2 FORMWORK FOR COLUMN


Centering and shuttering including strutting, propping
etc. and removal of form for columns for mass concrete

1 Column - From Plinth Beam Top to FFL SFT 150


2 Column - From FFL to Ground Floor Roof SFT 825
3 Column - From Ground Floor Roof to First floor Roof SFT 825
4 Column - From First Floor Roof To Second floor Roof SFT 825
5 Column - From Second Floor Roof To OHT base SFT 200
6 Column - From Second Floor Roof To Parapet wall
Level SFT 177

FORMWORK FOR PLINTH, BEAM AND


3.3 LINTEL
Centering and shuttering including strutting, propping
etc. and removal of form for : Lintels, beams, plinth
beams, girders, bressumers and cantilevers

3.3.1 Plinth Beam SFT 749


3.3.2 Belt beam SFT 237
3.3.3 Staircase - Mid landing beams(3nos) SFT 55
3.3.4 Roof beams
1 Ground floor roof beam SFT 747
2 First floor roof beam SFT 747
3 Second floor roof beam SFT 738
4 Head room roof beam SFT 103
5 OHT base beam SFT 100

3.3.5 Lintels
1 Lintels - Ground floor SFT 234
2 Lintels - First floor 9" SFT 224
3 Lintels - First floor 4.5" SFT 109
4 Lintels - Second floor 9" SFT 224
5 Lintels - Second floor 4.5" SFT 109

FORMWORK FOR SLABS, STAIRCASE,


3.4 SUNSHADE AND LOFT
Centering and shuttering including strutting, propping
etc. and removal of form for : Suspended floors, roofs,
landings, balconies, staircases, sunshades. Loft and
access platform
3.4.1 Slabs
1 Ground floor roof slab SFT 1017
2 First floor roof slab SFT 1017
3 Second floor roof slab SFT 1050
4 Head room roof slab SFT 83

3.4.2 Staircase
1 Staircase - Ground floor SFT 102
2 Staircase - First floor SFT 102
3 Staircase - Second floor SFT 102

3.4.3 Sunshade
1 First floor SFT 83
2 Second floor SFT 83
3.4.4 Loft
1 First floor SFT 47
2 Second floor SFT 47

3.5 FORMWORK FOR OVER HEAD TANK


Centering and shuttering including strutting, propping
etc. and removal of form for over head tank. SFT 348

4 Steel Reinforcement
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and
binding all complete upto plinth level and above plinth.
(TMT BARS)

4.1 Footing KG 633


4.2 Lift pit KG 731
4.3 Column complete KG 4001
4.4 Plinth Beam KG 937

4.5 Beams
1 Belt beam KG 204
2 Ground floor roof beam KG 807
3 First floor roof beam KG 807
4 Second floor roof beam KG 807
5 Head room roof & OHT base beam KG 0
6 Mid landing beam KG 52

4.6 Slabs
1 Ground floor roof slab KG 949
2 First floor roof slab KG 949
3 Second floor roof slab KG 1031
4 Head room roof slab KG 78

4.7 Staircase
1 Staircase - Ground floor KG 150
2 Staircase - First floor KG 165
3 Staircase - Second floor KG 165

4.8 Lintels
1 Lintels - Ground floor 9" KG 282
2 Lintels - First floor 9" KG 39
3 Lintels - First floor 4.5" KG 0
4 Lintels - Second floor 9" KG 39
5 Lintels - Second floor 4.5" KG 0

4.9 Sunshade
1 First floor KG 39
2 Second floor KG 39
Loft
1 First floor KG 19
2 Second floor KG 19

4.10 Over head tank KG 316

B MASONRY & PLASTERER


1 MASONRY WORK
BRICK MASONRY ABOVE PLINTH UPTO
1.1 FLOOR V WITH CM (1:5)
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level in
all shapes and sizes in : Cement mortar 1:5

Above plinth to FFL CFT 267


Ground floor CFT 1385
First floor CFT 1157
Second floor CFT 1157
Head room CFT 176
Parapet wall CFT 268

HALF BRICK MASONRY ABOVE PLINTH


1.2 UPTO FLOOR V WITH CM (1:4)
Half brick masonry with common burnt clay F.P.S.
(non modular) bricksof class designation 7.5 in
superstructure above plinth level up to floor III level.
Cement mortar 1:4

First floor SFT 765


Second floor SFT 765
Over head tank SFT 194

2 PLASTERING WORK

Providing & applying 15mm thick cement plaster with


fine sand in cement mortar 1:5 (1 cement: 5 sand) at
2.1
all floors and at all heights with necessary scaffolding,
curing, making grooves, forming pattas etc., all
materials and labour complete.
2.1.1 Inner plastering
Ground Floor SFT 3198
First Floor SFT 4210
Second Floor SFT 4210
Head room SFT 293

2.1.2 Outer plastering


From FGL to Parapet wall SFT 4941
Head room SFT 334
Parapet inner side SFT 326
Lift portion SFT 666
Terrace column SFT 50
OHT tank including base column SFT 741
Providing & applying 15mm thick cement plaster with
fine sand in cement mortar 1:3 (1 cement: 3 sand) at
2.2 all floors and at all heights with necessary scaffolding,
curing, making grooves, forming pattas etc., all
materials and labour complete.

2.2.1 Ceiling plastering


Ground Floor SFT 1180
First Floor SFT 1062
Second Floor SFT 1062
Head room SFT 83

3 SUMP TANK LTS 15304


4 SEPTIC TANK LTS 9210
JOB No. SHEET

REV. No. DATE

CALCULATED CHECKED

Unit Rate Amount RA REF.

4.47 19398.6

6.17 26764.3
4.47 1339.4

4.02 27631.7
4.02 9491.0

69.04 14973.4
69.04 6908.0
69.04 16597.9

30.00 40500.00

80 69405.00
80 32020.12

45 46082.81
45 30121.88
45 15820.31
45 33693.75
123.74 26838.7
123.74 12382.1
123.74 29750.6

177.14 127985.3
177.14 26704.2
177.14 49862.8
177.14 42896.1
177.14 15765.7

216.61 7310.6
216.61 40208.2
216.61 40208.2
216.61 40208.2
216.61 10153.6

216.61 8529.0
211.87 55207.9
211.87 55207.9
211.87 55207.9
211.87 7249.8
211.87 7249.8
211.87 3873.2

211.87 89668.0
211.87 89668.0
211.87 92532.5
211.87 7304.3
211.87 8186.6
211.87 8186.6
211.87 8186.6

216.61 17433.7
216.61 15331.9
216.61 4142.7
216.61 15331.9
216.61 4142.7
216.61 4174.5
216.61 4174.5

216.61 2894.3
216.61 2894.3
216.61 27868.2

22.75 11375.0
22.75 15228.3
22.75 9648.8

27.2 4080.0
27.2 22440.0
27.2 22440.0
27.2 22440.0
27.2 5440.0

27.2 4814.4

27.2 20366.0
27.2 6453.2
27.2 1503.2

27.2 20329.6
27.2 20329.6
27.2 20085.8
27.2 2812.6
27.2 2730.2

27.2 6373.3
27.2 6092.8
27.2 2968.2
27.2 6092.8
27.2 2968.2

26.1 26553.5
26.1 26553.5
26.1 27401.7
26.1 2163.0

26.1 2668.8
26.1 2668.8
26.1 2668.8

26.1 2157.0
26.1 2157.0

26.1 1223.3
26.1 1223.3

26.1 9086.1

49.484 31306.4
49.484 36190.2
49.484 198007.7
49.484 46364.5

49.484 10072.1
49.484 39925.6
49.484 39925.6
49.484 39925.6
49.484 12.1
49.484 2552.2

49.484 46958.5
49.484 46958.5
49.484 51000.9
49.484 3878.8

49.484 7436.9
49.484 8146.4
49.484 8146.4

49.484 13963.6
49.484 1929.9
49.484 0.0
49.484 1929.9
49.484 0.0

49.484 1921.5
49.484 1921.5

49.484 930.8
49.484 930.8

49.484 15624.7
180.17 48088.8
180.17 249498.3
180.17 208426.9
180.17 208426.9
180.17 31687.6
180.17 48359.2

85.78 65626.1
85.78 65626.1
85.78 16599.1

19.41 62085.2
19.41 81737.4
19.41 81737.4
19.41 5695.0

22.91 113211.2
22.91 7647.2
22.91 7461.1
22.91 15248.7
22.91 1147.1
22.91 16972.9
22.40 26440.2
22.40 23778.9
22.40 23778.9
22.40 1856.4

6.65 101768.9
4.36 40155.6
TOTAL 4008228.1
PROJECT

Doc. No.

PARTICULARS
BILL OF QUANTITIES FOR JOINERIES

Sl. No. Item No.


Description of Work Unit Quantity

II JOINERIES

A Supplying and fixing of Windows and Ventilators


using UPVC sections including shutter with 5mm thick
thoughened clear glass of approved make including all
necessary hardware.
1 Windows SFT 216
2 Ventilators SFT 63

B WOODEN
1
Supplying, making and fixing in position African
teakwood frames of size 125 x 62.5 mm or any other
size of equivalent section, shaped, plained and fixed
with necessary joinings as approved including pins,
nails, screws and bolts as per drawing, using teakwood
conforming to specification. Rate shall include for cost
of bolts nuts, screws, nails, pins, MS approved hold
fast and concrete grouting for fixing hold fast, anchor
fastners, antitermite treatment and fixing of 38mm
thick teakwood door shutter for single leaf with 4 pin
Mortise lock,chain lock, view lens, tower bolts, door
stopper, handles etc., complete as directed (in all
floors).The size of the Door will be 3'6" x 7'0" for
Entrance door-D NOS 2
2

Supplying, making and fixing in position salwood


frames of size 100 x 62.5 mm or any other size of
equivalent section, shaped, plained and fixed with
necessary joinings as approved including pins, nails,
screws and bolts as per drawing, conforming to
specification. Rate shall include for cost of bolts nuts,
screws, nails, pins, MS approved hold fast and concrete
grouting for fixing hold fast, anchor fastners,
antitermite treatment and fixing of 32mm thick solid
core Flush door shutter, single leaf with door stopper,
tower bolts, cylindrical lock etc., complete as directed
(in all floors) as per the finishes below:
a Finished with 1mm laminate on both sides and edges
with enamel paint finish including necessary beading.
Door - D1 (3'0" x 7'0") NOS 6
b
Same as above but Marine grade flush door finished
with 1mm laminate on both sides of size 2'6" x 7'0" for
toilets - D2 NOS 10

C STEEL WORK
1
Supplying, fabricating and fixing M.S. grils @
2.5kg/sft consisting of channels, angles, square bars,
flats, meshes, etc., double / single hung including
providing locking arrangement, jamming lugs etc., with
necessary grouting and finish the same with plaster
and painting steel work with two coats of approved
synthetic enamel paint over one coat of red oxide
primer, all material and labour complete
1.1 Safety grill for windows KG 540
2 Main Gate NOS 1
3 Rolling shutter - RS - (8'6" x 8'0") (2nos) SFT 136
4 Rolling shutter1 - RS1 - (6'3" x 8'0") (1nos) SFT 50
11
JOB No. SHEET

REV. No. DATE

CALCULATED CHECKED

Unit Rate Amount

350 75600
350 22050

35000 70000
24000 144000

21000 210000

110 59400
50000 50000
550 74800
550 27500
TOTAL 733350
PROJECT

Doc. No.

PARTICULARS BILL OF QUANTITIES FOR FINISHING WORKS

Sl. No. Item No. Description of Work


Unit Quantity
III FINISHES

A 1 PAINT & PUTTY


1.1 INNER AND CEILING - TWO COAT
ASIAN TRACTOR EMULSION PAINTING
INCLUDING TRUECARE ECONOMY
Painting with TRACTOR EMULSION (two
INTERIOR WALL PRIMER
coat) of required shade on new work, over and
including TRUECARE ECONOMY INTERIOR
WALL PRIMER to give an even shade.

1.1.1 INNER
Ground Floor SFT 3089.74
First Floor SFT 3912.71
Second Floor SFT 3912.71
Head room SFT 292.37

1.1.2 CEILING
Ground Floor SFT 1180.37
First Floor SFT 1061.56
Second Floor SFT 1061.56
Head room SFT 82.88

1.2 EXTRA FOR PUTTY OF AVG 1mm

Providing and applying white cement based


putty of average thickness 1mm, of approved
brand and manufacturer, over the plastered wall
surface to prepare the surface even and smooth
complete.

1.2.1 INNER
Ground Floor SFT 3089.74
First Floor SFT 3912.71
Second Floor SFT 3912.71
Head room SFT 292.37
1.3 EXTERIOR- TWO COAT ASIAN ACE
EXTERIOR EMULSION PAINTING
Painting
INCLUDINGwith ASIAN ACE EXTERIOR
TRUECARE EXTERIOR
EMULSION
WALL PRIMER (two coat) of required shade on
new work, over and including TRUECARE
EXTERIOR WALL PRIMER to give an even
shade.
From FGL to Parapet wall SFT 4940.90
Head room SFT 333.75
Parapet inner side SFT 325.63
Terrace column SFT 50.06
OHT tank including base column SFT 315.00

B FLOORING
1 MARBLE FLOORING

Marble stone flooring and skirting with 18 mm


thick marble stone, as per sample of marble
approved by Engineer-in-charge, over 20 mm
(average) thick base of cement mortar 1:4 (1
cement : 4 sand) laid and jointed with grey
cement slurry, including rubbing and polishing
complete.
1.1 Ground Floor SFT 892.74
1.2 First Floor SFT 914.94
1.3 Second Floor SFT 914.94
1.4 Terrace floor SFT 7.94

2 MARBLE SKIRTING
2.1 Ground Floor SFT 66.74
2.2 First Floor SFT 179.35
2.3 Second Floor SFT 179.35
2.4 Terrace floor SFT 0.99

3 STAIRCASE - MARBLE FLOORING


3.1 Riser SFT 107.25
3.2 Tread SFT 169.94
3.3 Mid landing SFT 68.25
3.4 Skirting SFT 10.10
3.5 Nosing RFT 204.75

4 ANTI SKID FLOOR TILE- TOILETS


Providing and laying Anti skid floor tiles in
different sizes (thickness to be specified by the
manufacturer) with water absorption less than
0.08% and conforming to IS : 15622, of
approved make, in all colours and shades, laid
on 20mm thick cement mortar 1:4 (1 cement : 4
coarse sand), including grouting

First Floor SFT 77.81


Second Floor SFT 77.81

5 CERAMIC DADO UPTO 7' - TOILETS

Providing and laying Ceramic tiles in different


sizes (thickness to be specified by
manufacturer), with water absorption less than
0.08 % and conforming to I.S. 15622, of
approved make, in all colours & shade, in
skirting, riser of steps, over 12 mm thick bed of
cement mortar 1:3 (1 cement: 3 sand), including
grouting the joint with white cement & matching
pigments etc. complete.

First Floor SFT 378


Second Floor SFT 378

6 EUROCON FLOORING

Providing and laying Eurocon floor tiles in


different sizes (thickness to be specified by the
manufacturer) with water absorption less than
0.08% and conforming to IS : 15622, of
approved make, in all colours and shades, laid
on 20mm thick cement mortar 1:4 (1 cement : 4
coarse sand), including grouting

GF - Parking SFT 259.04


FF - Service & Balcony SFT 75.44
SF - Service & Balcony SFT 75.44

7 EUROCON TILE SKIRTING


GF - Parking SFT 18.52
FF - Service & Balcony SFT 13.43
SF - Service & Balcony SFT 13.43

8 HEAT RESISTANT TERRACE TILE


Supply and laying of heat reflective tiles at
terrace using stand-alone over deck,
multilayered, non-porous, dense, dry-look, and
thermal insulated Thermatek tiles with the
necessary mortar and slope created as per the
design. Rate to be inclusive of lead and lift.
SFT 1146.44

C WATER PROOFING

Applying chemical crystalline waterproofing for


toilet & balconies areas using
pidilite/Sika/Fosroc chemicals with a guarantee
for 10 years. The chemical should be mixed with
mortar made of fine aggregate and cement on
1 the concrete floor. Precautions should be taken
such that there is no water or wetness seen on
the slab while applying the mix. The mix has to
be applied on the wall upto 250mm and the
space has to be left to curing for a minimum of
24 hours without any activities. After curing,
water has to be filled in for observation for a
minimum of 24 hours to assure a leakproof
finish as per the manufacturers specifications.
1.1 FF - Toilets , Service & Balcony SFT 149.50
1.2 SF - Toilets , Service & Balcony SFT 149.50
2 Same as above for terrace areas SFT 1146.44

D MISCELLANOUS

Fabricating, Supplying and Fixing in position


MS Staircase Handrail with Top hand rail of
60mm dia Hollow MS Pipe of 16 gauge to be
welded as railing to the verticals made of 20mm
dia MS Pipes of 1000mm height and 20mm dia
MS pipes as Mid Rails 3 Nos. conected with
1 12mm dia MS rods welded to 20mm dia MS
Verticals. Verticals should be fixed to the
concrete steps with 150mm x 150mm, 8mm
thick MS Base plate by welding. All exposed
MS sections to be painted with 2 coats of
Synthetic Enamel paint over a coat of anti-
corrosion zinc chromate primer, etc., complete.
all as per Architectural drawings and
instructions. RFT 73.27
Fabricating, Supplying and Fixing in position
SS Handrail for balconies with Top hand rail
of 40mm dia Hollow SS Pipe of 316 grade to be
fixed to the verticals made of 50mm SS sections
of 900mm height. 10mm thick toughened glass
panels to be fixed to the verticals with necessary
SS studs. Verticals should be fixed to the
concrete steps with 50mm x 50mm, 4mm thick
2 SS Base plate by bolts. SS should be brushed
finish and verticals to be fixed at an interval of
1800mm minimum as per Architectural
drawings and instructions.Rate to be inclusive of
all necessary arrangements such as delivery,
loading, unloading, welding, buffing, grinding,
SS studs, etc.,(In All Floors). The installed
handrail will be tested for stability and any
additional supports required due to substandard
installation will be under vendor's responsibility.
Shop drawings to be provided while submitting
the offer. RFT 23

Providing and laying of light weight concrete


fill on structural slab using Vermiculite cement
based composition having physical elasticity ,
chemical inertness, firm adhesion, fire resistance
3 with thermal / acoustic insulation properties,
anti-corrosion, anti-condensation, etc in the
required proportion to get the desired density,
mixing, transportation, placing, compacting and
finishing to the required level with necessary
side supports, equipments, etc complete. CFT 170
Supply and fixing of shamiana rings in the
4 terrace using MS rings of dia 150mm, fixed to
the wall as specified with all related civil work RFT 30
Providing and fixing letter boxes of size
250mm 350mm using powder coated metal of
5 3mm thk. Rate to be inclusive of necessary
hardwares such as flat indicators,lock, handles,
etc., NOS 2
Providing and fixing signages for indicating the
6 floor numbers using anodised aluminium plate
of size 600mm x 100mm with embossed letters. NOS 3
JOB No. SHEET

REV.
No. DATE

CALCU
LATED CHECKED

Unit
Rate Amount

10.37 32038
10.37 40572
10.37 40572
10.37 3032

10.37 12240
10.37 11008
10.37 11008
10.37 859

0.00
0.00
6.67 20608 0.00
6.67 26097 0.00
6.67 26097
6.67 1950

18.61 91951
18.61 6211
18.61 6060
18.61 932
18.61 5862

197.26 176100
197.26 180479
197.26 180479
197.26 1566

210.01 14016
210.01 37666
210.01 37666
210.01 208

210.01 22523
210.01 35689
210.01 14333
210.01 2122
37.92 7764
96.84 7536
96.84 7536

79.64 30104
79.64 30104

86.59 22431
86.59 6532
86.59 6532

99.04 1834
99.04 1330
99.04 1330
76.34 87523

70 10465
70 10465
75 85982.81

1100 80596
300 6900

300 51041

650.00 19500

650 1300

650 1950
TOTAL 1518702.3
PROJECT

Doc. No.

PARTICULARS BILL OF QUANTITIES FOR MEP WORKS

Sl. No. Item No. Description of Work Unit Quantity

IV MEP

A FIRE FIGHTING & ALARM SYSTEM


1 DOWN COMER SYSTEM
Fire terrace pumps, down comers, hose reel
boxes, Motrol control center,cabling,
Extinguishers etc LS -
2 SIGNAGES
Supply & Fixing Fire escape signages LS -
3 FIRE ALARM SYSTEM
Manually operated fire alarm system,cabling,
Manual call points, hooters LS -

B ELECTRIFICATION
1 INTERNAL ELECTRIFICATION:
Panels, cables,point wiring, DG wiring , Current
limiters,Distribution boards &
switchgears,common area light fixtures,earth
electrodes, safety equipments & Liasoning
charges
SFT 1363
2 Supply and installation of Main Board with all
associated civil works . LS -
3 Inverter Wiring For necessory lights and fans
LS -
4 Provision of Security Camera points in Hall for
each flat and in stilt area. LS -
5 ELEVATORS:
Mitshubishi make (4 passengers)- MRL NOS 1
6 Split AC units of 1.5 tonne capacity for Bed
room NOS 6

C PUBLIC HEALTH ENGINEERING

1 Water supply lines,soil,sullage & rainwater


lines,water pumps, level controllers etc. SFT 1363
2 Sanitary fixtures and CP Fittings for toilets NOS 6
3 Kitchen and washing fittings
3.1 Franke single bowl sink with drain board NOS 2
3.2 Franke tap NOS 2
3.3 Sink plumbing kit NOS 2
3.4 Tap for washing machine NOS 2
3.5 Tap for service NOS 2
JOB No. SHEET

REV. No. DATE

CALCULATED CHECKED

Unit Rate Amount

- 80000

- 2000

- 25000

90 122670

- 100000
- 20000

- 30000

750000 750000

40000 240000

70.00 95410
30000 180000

8000.00 16000
2500.00 5000
2200.00 4400
500.00 1000
500.00 1000
TOTAL 1672480.0
PROJECT

Doc. No.

PARTICULARS BILL OF QUANTITIES FOR INTERIOR WORKS

Sl. No. Item No. Description of Work Unit Quantity

V INTERIORS
A FALSE CEILING
Providing and fixing suspended modular grid
ceiling which includes providing and fixing
25mm grid system, having 25mm x 25mm
section along the perimeter of the ceiling,
screw fixed to brick wall/ partition with help
of nylon sleeves and screws, at 600 mm
centers. The suspended GI intermediate
channels of size 45 mm,0.9mm thk with two
flanges of 15 mm each from the soffit at
1220 mm centers with ceiling angle of width
25mm x 10mm x 0.55mm thk fixed to soffit
with GI cleat and steel expansion fasteners.
The 12mm thick calcium silicate tiles of size
600mm x 600mm finished with paint to be
placed on the Grid. Rate to be inclusive of
making necessary provisions for fixing light
fixtures.

1 FF LIVING HALL SFT 247.5


2 SF LIVING HALL SFT 247.5

B WARDROBES
BED ROOM 1
Boxing unit- Base and finish material:
19mm Sharon gold commercial plywood on
three sides and 6mm Sharon gold
commercial plywood for back side, with
0.8mm green touch white or half white
laminate for inside of the box and 1mm outer
(century or green ply) colour laminate as per
clients choice with pricing of Rs.1500-1700
per laminate sheet(8'x4'), Hinges-soft close
hinges and teak wood beading finish along
19mm plywood.Duco paint finish for
beading matching the laminate colour
Depth of wardrobe: 2 feet

Wardrobes boxing unit SFT 93


Shuttering unit- Base and finish material:
19mm Sharon gold commercial plywood
with 0.8mm green touch white or half white
laminate for inside and 1mm outer (century
or green ply) colour laminate as per clients
choice with pricing of Rs.1500-1700 per
laminate sheet(8'x4'). Hinges-soft close
hinges and teak wood beading finish along
19mm plywood. Duco paint finish for
beading matching the laminate colour
Loft shuttering SFT 72
BED ROOM 2
Boxing unit- Base and finish material:
19mm Sharon gold commercial plywood on
three sides and 6mm Sharon gold
commercial plywood for back side, with
0.8mm green touch white or half white
laminate for inside of the box and 1mm outer
(century or green ply) colour laminate as per
clients choice with pricing of Rs.1500-1700
per laminate sheet(8'x4'), Hinges-soft close
hinges and teak wood beading finish along
19mm plywood.Duco paint finish for
beading matching the laminate colour
Depth of wardrobe: 2 feet

Wardrobes boxing unit SFT 96


Shuttering unit- Base and finish material:
19mm Sharon gold commercial plywood
with 0.8mm green touch white or half white
laminate for inside and 1mm outer (century
or green ply) colour laminate as per clients
choice with pricing of Rs.1500-1700 per
laminate sheet(8'x4'). Hinges-soft close
hinges and teak wood beading finish along
19mm plywood. Duco paint finish for
beading matching the laminate colour
Loft shuttering SFT 73

C MODULAR KITCHEN NOS 2

D TV SHELF UNITS NOS 2

E KITCHEN APPLIANCES
1 Hob NOS 2
2 Chimney NOS 2
3 Oven NOS 2
4 Fridge NOS 2
JOB No. SHEET

REV. No. DATE

CALCULATED CHECKED

Unit Rate Amount

165 40838
165 40838
1700 157675 6.625

900 64440

1700 163625 6.875


900 66051

14000 28000

25000 50000

12000 24000
11000 22000
13000 26000
20000 40000
TOTAL 723466

TOTAL COST 8656226