Doc. No.
Sl.
Item No. Description of Work Unit Quantity
No.
I CIVIL WORK
A FOUNDATION AND CONCRETING
1 EXCAVATOR, FILLING & ANTITERMITE.
1.1 Earthwork
1.2 Backfilling
Filling available excavated earth (excluding rock) in
trenches, plinth,sides of foundations etc. in layers not
exceeding 20cm in depth,consolidating each deposited
layer by ramming and watering, lead upto 50 m and lift
upto 1.5 m.
In foundation CFT 6873
In Beneath Non suspended floor CFT 2361
SFT 1350
2 CONCRETOR
2.1 PCC 1:4:8 (MACHINE MIX)
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering - All work up to plinth level : 1:4:8 (1
Cement : 4 sand : 8 40mm aggregate)
3 FORMWORK
FORMWORK FOR FOOTING AND BASE
3.1
COLUMN
Centering and shuttering including strutting, propping
etc. and removal of form for : Foundations, footings,
bases of columns, etc. for mass concrete
3.3.5 Lintels
1 Lintels - Ground floor SFT 234
2 Lintels - First floor 9" SFT 224
3 Lintels - First floor 4.5" SFT 109
4 Lintels - Second floor 9" SFT 224
5 Lintels - Second floor 4.5" SFT 109
3.4.2 Staircase
1 Staircase - Ground floor SFT 102
2 Staircase - First floor SFT 102
3 Staircase - Second floor SFT 102
3.4.3 Sunshade
1 First floor SFT 83
2 Second floor SFT 83
3.4.4 Loft
1 First floor SFT 47
2 Second floor SFT 47
4 Steel Reinforcement
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and
binding all complete upto plinth level and above plinth.
(TMT BARS)
4.5 Beams
1 Belt beam KG 204
2 Ground floor roof beam KG 807
3 First floor roof beam KG 807
4 Second floor roof beam KG 807
5 Head room roof & OHT base beam KG 0
6 Mid landing beam KG 52
4.6 Slabs
1 Ground floor roof slab KG 949
2 First floor roof slab KG 949
3 Second floor roof slab KG 1031
4 Head room roof slab KG 78
4.7 Staircase
1 Staircase - Ground floor KG 150
2 Staircase - First floor KG 165
3 Staircase - Second floor KG 165
4.8 Lintels
1 Lintels - Ground floor 9" KG 282
2 Lintels - First floor 9" KG 39
3 Lintels - First floor 4.5" KG 0
4 Lintels - Second floor 9" KG 39
5 Lintels - Second floor 4.5" KG 0
4.9 Sunshade
1 First floor KG 39
2 Second floor KG 39
Loft
1 First floor KG 19
2 Second floor KG 19
2 PLASTERING WORK
CALCULATED CHECKED
4.47 19398.6
6.17 26764.3
4.47 1339.4
4.02 27631.7
4.02 9491.0
69.04 14973.4
69.04 6908.0
69.04 16597.9
30.00 40500.00
80 69405.00
80 32020.12
45 46082.81
45 30121.88
45 15820.31
45 33693.75
123.74 26838.7
123.74 12382.1
123.74 29750.6
177.14 127985.3
177.14 26704.2
177.14 49862.8
177.14 42896.1
177.14 15765.7
216.61 7310.6
216.61 40208.2
216.61 40208.2
216.61 40208.2
216.61 10153.6
216.61 8529.0
211.87 55207.9
211.87 55207.9
211.87 55207.9
211.87 7249.8
211.87 7249.8
211.87 3873.2
211.87 89668.0
211.87 89668.0
211.87 92532.5
211.87 7304.3
211.87 8186.6
211.87 8186.6
211.87 8186.6
216.61 17433.7
216.61 15331.9
216.61 4142.7
216.61 15331.9
216.61 4142.7
216.61 4174.5
216.61 4174.5
216.61 2894.3
216.61 2894.3
216.61 27868.2
22.75 11375.0
22.75 15228.3
22.75 9648.8
27.2 4080.0
27.2 22440.0
27.2 22440.0
27.2 22440.0
27.2 5440.0
27.2 4814.4
27.2 20366.0
27.2 6453.2
27.2 1503.2
27.2 20329.6
27.2 20329.6
27.2 20085.8
27.2 2812.6
27.2 2730.2
27.2 6373.3
27.2 6092.8
27.2 2968.2
27.2 6092.8
27.2 2968.2
26.1 26553.5
26.1 26553.5
26.1 27401.7
26.1 2163.0
26.1 2668.8
26.1 2668.8
26.1 2668.8
26.1 2157.0
26.1 2157.0
26.1 1223.3
26.1 1223.3
26.1 9086.1
49.484 31306.4
49.484 36190.2
49.484 198007.7
49.484 46364.5
49.484 10072.1
49.484 39925.6
49.484 39925.6
49.484 39925.6
49.484 12.1
49.484 2552.2
49.484 46958.5
49.484 46958.5
49.484 51000.9
49.484 3878.8
49.484 7436.9
49.484 8146.4
49.484 8146.4
49.484 13963.6
49.484 1929.9
49.484 0.0
49.484 1929.9
49.484 0.0
49.484 1921.5
49.484 1921.5
49.484 930.8
49.484 930.8
49.484 15624.7
180.17 48088.8
180.17 249498.3
180.17 208426.9
180.17 208426.9
180.17 31687.6
180.17 48359.2
85.78 65626.1
85.78 65626.1
85.78 16599.1
19.41 62085.2
19.41 81737.4
19.41 81737.4
19.41 5695.0
22.91 113211.2
22.91 7647.2
22.91 7461.1
22.91 15248.7
22.91 1147.1
22.91 16972.9
22.40 26440.2
22.40 23778.9
22.40 23778.9
22.40 1856.4
6.65 101768.9
4.36 40155.6
TOTAL 4008228.1
PROJECT
Doc. No.
PARTICULARS
BILL OF QUANTITIES FOR JOINERIES
II JOINERIES
B WOODEN
1
Supplying, making and fixing in position African
teakwood frames of size 125 x 62.5 mm or any other
size of equivalent section, shaped, plained and fixed
with necessary joinings as approved including pins,
nails, screws and bolts as per drawing, using teakwood
conforming to specification. Rate shall include for cost
of bolts nuts, screws, nails, pins, MS approved hold
fast and concrete grouting for fixing hold fast, anchor
fastners, antitermite treatment and fixing of 38mm
thick teakwood door shutter for single leaf with 4 pin
Mortise lock,chain lock, view lens, tower bolts, door
stopper, handles etc., complete as directed (in all
floors).The size of the Door will be 3'6" x 7'0" for
Entrance door-D NOS 2
2
C STEEL WORK
1
Supplying, fabricating and fixing M.S. grils @
2.5kg/sft consisting of channels, angles, square bars,
flats, meshes, etc., double / single hung including
providing locking arrangement, jamming lugs etc., with
necessary grouting and finish the same with plaster
and painting steel work with two coats of approved
synthetic enamel paint over one coat of red oxide
primer, all material and labour complete
1.1 Safety grill for windows KG 540
2 Main Gate NOS 1
3 Rolling shutter - RS - (8'6" x 8'0") (2nos) SFT 136
4 Rolling shutter1 - RS1 - (6'3" x 8'0") (1nos) SFT 50
11
JOB No. SHEET
CALCULATED CHECKED
350 75600
350 22050
35000 70000
24000 144000
21000 210000
110 59400
50000 50000
550 74800
550 27500
TOTAL 733350
PROJECT
Doc. No.
1.1.1 INNER
Ground Floor SFT 3089.74
First Floor SFT 3912.71
Second Floor SFT 3912.71
Head room SFT 292.37
1.1.2 CEILING
Ground Floor SFT 1180.37
First Floor SFT 1061.56
Second Floor SFT 1061.56
Head room SFT 82.88
1.2.1 INNER
Ground Floor SFT 3089.74
First Floor SFT 3912.71
Second Floor SFT 3912.71
Head room SFT 292.37
1.3 EXTERIOR- TWO COAT ASIAN ACE
EXTERIOR EMULSION PAINTING
Painting
INCLUDINGwith ASIAN ACE EXTERIOR
TRUECARE EXTERIOR
EMULSION
WALL PRIMER (two coat) of required shade on
new work, over and including TRUECARE
EXTERIOR WALL PRIMER to give an even
shade.
From FGL to Parapet wall SFT 4940.90
Head room SFT 333.75
Parapet inner side SFT 325.63
Terrace column SFT 50.06
OHT tank including base column SFT 315.00
B FLOORING
1 MARBLE FLOORING
2 MARBLE SKIRTING
2.1 Ground Floor SFT 66.74
2.2 First Floor SFT 179.35
2.3 Second Floor SFT 179.35
2.4 Terrace floor SFT 0.99
6 EUROCON FLOORING
C WATER PROOFING
D MISCELLANOUS
REV.
No. DATE
CALCU
LATED CHECKED
Unit
Rate Amount
10.37 32038
10.37 40572
10.37 40572
10.37 3032
10.37 12240
10.37 11008
10.37 11008
10.37 859
0.00
0.00
6.67 20608 0.00
6.67 26097 0.00
6.67 26097
6.67 1950
18.61 91951
18.61 6211
18.61 6060
18.61 932
18.61 5862
197.26 176100
197.26 180479
197.26 180479
197.26 1566
210.01 14016
210.01 37666
210.01 37666
210.01 208
210.01 22523
210.01 35689
210.01 14333
210.01 2122
37.92 7764
96.84 7536
96.84 7536
79.64 30104
79.64 30104
86.59 22431
86.59 6532
86.59 6532
99.04 1834
99.04 1330
99.04 1330
76.34 87523
70 10465
70 10465
75 85982.81
1100 80596
300 6900
300 51041
650.00 19500
650 1300
650 1950
TOTAL 1518702.3
PROJECT
Doc. No.
IV MEP
B ELECTRIFICATION
1 INTERNAL ELECTRIFICATION:
Panels, cables,point wiring, DG wiring , Current
limiters,Distribution boards &
switchgears,common area light fixtures,earth
electrodes, safety equipments & Liasoning
charges
SFT 1363
2 Supply and installation of Main Board with all
associated civil works . LS -
3 Inverter Wiring For necessory lights and fans
LS -
4 Provision of Security Camera points in Hall for
each flat and in stilt area. LS -
5 ELEVATORS:
Mitshubishi make (4 passengers)- MRL NOS 1
6 Split AC units of 1.5 tonne capacity for Bed
room NOS 6
CALCULATED CHECKED
- 80000
- 2000
- 25000
90 122670
- 100000
- 20000
- 30000
750000 750000
40000 240000
70.00 95410
30000 180000
8000.00 16000
2500.00 5000
2200.00 4400
500.00 1000
500.00 1000
TOTAL 1672480.0
PROJECT
Doc. No.
V INTERIORS
A FALSE CEILING
Providing and fixing suspended modular grid
ceiling which includes providing and fixing
25mm grid system, having 25mm x 25mm
section along the perimeter of the ceiling,
screw fixed to brick wall/ partition with help
of nylon sleeves and screws, at 600 mm
centers. The suspended GI intermediate
channels of size 45 mm,0.9mm thk with two
flanges of 15 mm each from the soffit at
1220 mm centers with ceiling angle of width
25mm x 10mm x 0.55mm thk fixed to soffit
with GI cleat and steel expansion fasteners.
The 12mm thick calcium silicate tiles of size
600mm x 600mm finished with paint to be
placed on the Grid. Rate to be inclusive of
making necessary provisions for fixing light
fixtures.
B WARDROBES
BED ROOM 1
Boxing unit- Base and finish material:
19mm Sharon gold commercial plywood on
three sides and 6mm Sharon gold
commercial plywood for back side, with
0.8mm green touch white or half white
laminate for inside of the box and 1mm outer
(century or green ply) colour laminate as per
clients choice with pricing of Rs.1500-1700
per laminate sheet(8'x4'), Hinges-soft close
hinges and teak wood beading finish along
19mm plywood.Duco paint finish for
beading matching the laminate colour
Depth of wardrobe: 2 feet
E KITCHEN APPLIANCES
1 Hob NOS 2
2 Chimney NOS 2
3 Oven NOS 2
4 Fridge NOS 2
JOB No. SHEET
CALCULATED CHECKED
165 40838
165 40838
1700 157675 6.625
900 64440
14000 28000
25000 50000
12000 24000
11000 22000
13000 26000
20000 40000
TOTAL 723466