NIM
PERANCANGAN PEMASANGAN PLTS RUMAH AHMA
NO RINCIAN BEBAN
1 LAMPU PLC
2 SAMSUNG TV LED 24"
3 KIPAS ANGIN MIYAKO
4 POMPA AIR
5 RADIO SOUND SISTEM
6 PLAY STATION 2
7 RICE COOKER
8 CHARGER HP
9 CHARGER LAPTOP
10 SETRIKA
1 Total Beban
2 Faktor keamanan (Safety Factor)
3 Total Beban x Safety Factor
4 Tegangan Baterai/pcs
5 Kapasitas Baterai yg diperlukan (ah)
6 Jumlah Baterai @ 100ah
7 Daya Baterai 19pcs @ 100ah
8 Jam Terik (5jam) x Kapasitas Solar cell 300wp
9 Jumlah Solar Cell yg diperlukan @ 300wp
10 Daya Solar Cell 10pcs @ 300wp 5jam Terik
11 Jumlah Controller 9,2irc x 5pcs
1 Baterai 100ah
2 Solar Cell 300wp
3 Controller 100A
4 Kabel
5 Box Panel
TOTAL
AHMAD SAEFUDIN
201523005
ANGAN PLTS RUMAH AHMAD SAEFUDIN
WAKTU
TEGANGA DAYA ARUS
KAPASITAS (Watt) JUMLAH PEMAKAI
N (Volt) (Watt) (Amp)
AN (Jam)
dan Baterai
Jumlah Satuan Catatan
7,376.00 wh
1.5
11,064.00 wh
12 volt
922 ah
10.00 pcs
1000.00 ah > 1843,5ah aman digunakan
1500 wp
5.00 pcs
7,500.00 wp > 14.748,00wh aman digunakan
46 A dipakai kapasitas controller 100A
an Solar Cell
Harga/Satuan Quantiti Jumlah
Rp2,100,000 10 Rp21,000,000
Rp4,500,000 5 Rp22,500,000
Rp7,099,000 1 Rp7,099,000
Rp250,000 1 Rp250,000
Rp750,000 2 Rp1,500,000
Rp52,349,000
AMPER
ENERGI (Wh) E HOUR
(Ah)
468.00 39.00
330.00 1.50
640.00 2.91
250.00 1.14
300.00 1.36
48.00 5.65
4800.00 21.82
80.00 5.03
260.00 13.00
200.00 0.91
7,376.00 92.31