ATQS 3122 Quantity Surveying Practices II

Lecturer: Sr Lim Meng Heok (KMN, FRISM, CQS)

Tutorial Work No.2

Questions
1. State the circumstances that an architect is empowered to issue variation order to a contractor in
building contract.
2. Discuss the proper procedures in issuing a valid Architect Instruction by the contract
administrator / architect in the building contract.
3. PAM 2018 clause 11.6 on valuation rules stated the methods adopted in valuing variation of
works as instructed by the architect.
Briefly explain a Consulting Quantity Surveyor in carry out the valuation of variation works to enable
the claim submitted by the contractor can be accepted.

CHAN WEIQIN
Group Leader: …………………………………………… (ID No. 19WVD01097
……….…………)
CHONG JIA EN
Group Members: 1. ……………………………………… (ID No. .19WVD01652
………………..)
CHONG ZHI HAO
2. ……………………………………… 19WVD01132
(ID No. ………………... )
DANIEL ONG ZHANG JIE
3. ………………………………………
19WVD01854
(ID No. …………………..)
LOKE CHUN HIN 19WVD01479
4. ……………………………………… (ID No. ……………….…)
02 (4)
Group No: DQS2 Group …………………………….

15/2/2021
Date of Submission: ………………………………