SHRIRAM GRAND CITY
Action Plan : At Work Place, Site Office & Labour Hutment Area
• A well defined strategic locations for washing hands has been finalised. Adequate quantity of hand
sanitisers / liquid soaps shall be provided at those designated location. Availability of adequate water
should also be ensured also.
• All the team members and construction workers shall be encourage to use face masks.
• No visitors should be entertained at site.
• Introduction of new work force shall be restricted with immediate effect till further advice.
• Team members of various stack holders shall be encourage for restricted movement / self quarantine /
self isolation as per their convenience.
• Thermal Gun shall be provided at strategic locations in the entire project area for thermal screening of
all persons.
• Adequate no of Security personnel shall be deployed at the strategic locations to ensure the screening
of all the workers and staffs at site has been maintained religiously. Security personnel shall also supervise
the preventive protocol as per Guideline.
• Any person who is detected temperature above 100 degree Farenheit should not be allowed to enter
the premises. This is applicable for everyone including all staff.
• Awareness programme for protective measures against COVID - 19 shall be carried out in small groups
at different locations on daily basis,
Action Plan : At Work Place, Site Office & Labour Hutment Area
• The modus operandi of conducting various programmes like Tool Box meeting etc. shall be fabricated a
such a fashion that a number of construction workers attending the programme at a particular location
shall be restricted to 15 only. It shall be also ensured that a minimum distance of one (01) metre shall be
maintained in between two adjacent participants.
• For the each project (Grand One / Sunshine One), only one (01) entry and exist point shall be allowed.
• The implementation status is to be reviewed by Safety representative of CQRA, and MDM, and is to be
tracked / monitored, by ESG personnel of Shriram Group , under the overall Administrative and
Technical guidance of 3 (three) Project Managers of Sunshine One, Grand One, and Road
Infrastructure, of Shriram Group.
Strategic Locations at Site Work Zone
Location
04
Location
03
Location
Location 02
01
Location
01
Isolation Chart : Developer / PMC [Working from Home for Social Disconnection]
Isolation Chart [Working from Home for Social Disconnection]
Monday Tuesday Wednesday Thursday Friday Saturday
Name
23-03-2020 24-03-2020 25-03-2020 26-03-2020 27-03-2020 28-03-2020
Bengal Shriram Hi Tech City Pvt. Ltd.
Grand One Team
Sudipta Ghoshal
Av ijit Ghosh
Prasenjit Kar
Souv ik Hore
Sarav anan S.
Delhi Babu
Infrastructure Team
Sanjay Ghosh
Sk. Nasir Ali
Supratim Sinha
Santanu Bhunia
Sunshine One Team
Chart [WorkingAbir Sengupta
from Home for Social Disconnection]
Monday Tuesday Wednesday Thursday
Name Ujjal Koley Friday Saturday
23-03-2020 24-03-2020 25-03-2020 26-03-2020 27-03-2020 28-03-2020
hriram Hi TechAyan Basu
City Pvt. Ltd. Mallik
One Team
Ghoshal
Chanchal Saha
osh
Kar Kunal Biswas
ore
an S. Symbol Abbreviations
: - Available
at site,
x- Workfrom Home
Isolation
Isolation Chart
Chart : Developer
[Working from Home for/ Social
PMCDisconnection]
[Working from Home for Social Disconnection]
Monday Tuesday Wednesday Thursday Friday Saturday
Name
23-03-2020 24-03-2020 25-03-2020 26-03-2020 27-03-2020 28-03-2020
MASTERS
Sanjay Kumar Datta
Pradip Bandyopadhyay
Sudip Ghosh
Pradip Basu
Tamal Mukherjee
CQRA
Somnath Paul
Malay Ghosh
Mainuddin Khan
Aidul Hussain
Koushik Chakraborti
Pratap Ch. Pal
Santu Ghosh
Sudipta Nandi
Tirthankar Sarkar
Shouv ik Dutta
Tapas Kumar Dinda
Mrinal Kanti Panda
Kisholoy Banerjee
Sounav a Maity
Anupam Giri
Debojyati Biswas
Milan Mondal