Professional Documents
Culture Documents
Cleaning of Networking Equipment Procedures
Cleaning of Networking Equipment Procedures
OPERATIONAL PROCEDURE
Equipment Type Switch
Equipment Code S1
Location Computer Laboratory 201
Operational Procedure
HOUSEKEEPING SCHEDULE
Qualification Computer System Station/Bldg J Building
Servicing NC II
Area/Section Practical Work Area
In-Charge
Schedule for the August, 2019
Daily Ev Wee Ever Monthl Remark
Respons ery kly y y s
ACTIVITIES ible oth 15 th
Person er Day
Da
y
Clean and free TRAINEE
Computer Laboratory /
from dust/rust /gums. TRAINER
1. Clean and check TRAINEE
Computer equipment/ /
accessories from dust TRAINER
and oil; dry and properly
laid-out/ secured/stable
3. Clean and arrange TRAINEE
working tables according /
to floor plan/lay-out; TRAINER
check stability
4. Clean and check floor, TRAINEE
walls, windows, ceilings /
• graffiti/dust/rust TRAINER
cobwebs and
outdated/unnecessary
objects/items
obstructions
• any used
materials/scraps (slugs,
stubs) spilled liquid
open cracks (floor).
5. Clean and check TRAINEE
Computer Laboratory /
ventilation and TRAINER
illumination by dusting
lamps/bulbs, replacing
non-functional lamps
and keeping exhaust
clean
6. Clean and check TRAINEE
computer set -monitor, /
CPU, keyboards, mouse TRAINER
– free, unnecessary
markings, dust; cables
and plugs are in order;
well-arranged; all items
functional
7. Clean, inspect air TRAINEE
conditioning equipment: /
• keep screen and filter TRAINER
free from dust/rust
• Check selector knobs if
in normal positions and
are functional
•
8. Clean, check and TRAINEE
maintain Tool Room /
• Free of dust, not damp TRAINER
• Tools in appropriate
positions/locations
• With visible
labels/signage
• Logbook and forms are
complete, in order and
updated
• Lights, ventilation – OK
Clean and check Rest TRAINEE
Room /
• Urinals, bowls, wash TRAINER
basins, walls and
partitions are free from
stains, dirt, oils, graffiti
and unnecessary
objects;
• Ceilings free from
cobwebs and dangling
items
• Floor is kept dry; no
broken tiles or
protruding objects
Equipped with dipper
and pails; properly
located after use Water
systems is functional: no
dripping/damaged
faucets or pipes
• Drainage system is
working, no water-
clogged areas No
offensive odor
• Lights /Ventilation – OK
9. Clean and check wash TRAINEE
area: /
• Walls/Floors- –free from TRAINER
oils, molds, broken tiles,
gums, stains or graffiti
• Drainage system is
functional
• Water system functional;
no dripping faucets or
leaking pipes
• Free from unnecessary
objects (mops, rags)
1 Clean and maintain TRAINEE
work shop surroundings /
by sweeping/ removing TRAINER
fallen leaves, branches,
debris and other refuse,
impounded water,
clearing pathways of
obstructions
1 Disposal of waste TRAINEE
materials /
(Follow waste TRAINER
segregation system)
Qualificatio
Computer System Servicing NCII
n
Area/Sectio
Electronic Area In-Charge:
n
Is air-condition cleaned?
No dust
No cobwebs
Is the whiteboard cleaned?
No stain
Remarks:
PURCHASE REQUEST