This chapter presents different related literature and studies after the thorough search
done by the researchers. It includes detailed reviews which aids in identifying the research
Related Literatures
et.al, in an article entitled Project Scheduling: Survey and Research Potentials (2017),
scheduling is the way of actually managing a project and without such process will amount to
failure. Ideas on the impact of current problems and opportunities are provided for the
schedule. Also, it shows the progress of the project and if there are issues or concerns that
project. Aiming a timely execution of work according to the planned project provides
protection against problems and gives early warnings of issues for the prevention of project
complications. (Sharanyasreenivas, et.al) A project begins with the best of intentions, but an
unscheduled project can result to a lot of errors and failure. Such circumstances can be
and Booze-Allen is a scheduling technique used to create realistic schedules and coordinate
tasks or activities. It is a way to get a visualization of the flow of the project and estimates the
timeline based on their assumed or planned duration. It works using three duration estimates:
the optimistic duration – the shortest reasonable length of time needed to complete the tasks,
the pessimistic duration – the longest reasonable length of time, and the most likely duration
– the average reasonable length of time. These duration estimates are used to create a
weighted average which is the expected duration that tends to match actual task durations
very closely. The outcome of the analysis of this technique is a diagram that shows expected
task durations between the milestones of the project and is called a PERT chart. These
expected durations can be plugged into a critical path model to identify critical path and tasks
and when tasks are entailed with uncertainty PERT can also be a helpful addition to CPM.
(Ramos, 2018)
Critical Path Method (CPM) developed by Morgan R. Walker and James E. Kelly, is
often used along with PERT. It is a network analysis that shows tasks and activities that must
be finished. It comes up with a three-point analysis of the best, most likely and worst-case
scenario. (Moylan, 2002) It is a legal standard for measuring project delays and often used in
court cases as the basis of financial claims. It acts as an evidence to identify fault and
PERT and CPM are both computer-based for network analysis and used together to
result in a more conservative view of the duration of tasks and helps in understanding the
relationships between the activities. (Moylan, 2002) These techniques were originally done
by handwriting. However, technology has made it much easier to use. Software applications
are established by using algorithms that schedule project activities and generate a graphic
representation of the tasks and their relationships. It also helps to increase the productivity
and decreases labor costs because it will avoid overcrowding at the construction site. (Ramos,
2017) Software applications are then utilized by the use of personal computers. Over the
years, technology has been growing fast and the use or functions of personal computers can
According to an article entitled “4 Prediction for the Future Project Management”, the
use of mobile phones on construction sites is nothing a new and there are companies that
utilizes mobile applications and mobile systems for work purposes. Mobile phones are now
used in better handling of internal flow of information and are slowly being integrated into
Android Studio is the official Integrated Development Environment (IDE) for android
for software. It is a software that provides a unified environment in building applications for
android mobile phones, tablets, and other applicable gadgets. It is an application developer
which contains the necessary tools needed to build an application and provides the fastest
possible turnaround on coding and running workflow. Android studio fully supports editing
C/C++ project files and provides syntax highlighting and refractoring for C/C++, and an
LLDB-based debugger that allows simultaneously debugging of Java and C/C++ code.
India.
10.7753/IJCATR0404.1005
Moylan WA (2002), Planning and Scheduling: The Yin and Yang of Managing A
Project, Paper presented at Project Management Institute Annual Seminars & Symposium,
Ramos D (2017), How to Make Critical Path Work in Construction: From Theory to
Field, www.smartsheet.com
www.constructionworld.org