NAME OF PROBLEM : The Panel
Defect Above 10%
SPECIFICATION IS IS NOT DISTINCTIONS CHANGES
WHAT:
∙OBJECT Panther Paneel Cheetah Panel Speed between new machines No Applicable changes
∙DEVIATION Panther line running on old machinery Next day complaint No visible differences Any changes not stated
Where There is no change in previous
∙OBJECT Panther Panel (Line 1, 2, 4) Cheetah Panel Depth of draw
production
In the same Factory where production line occurs
∙PLACE
Sheet Pressing
∙PROCESS
When: Line 1: 10.03
∙TIME Burrs before line 1, 2, 4 was defect Blocking method that Zenith Metals uses New type of Alloy: Zenith
Line 2: 09.33
and stacks of Zenith on Line 1, Line 2, Line
Line 4: 11:23 4