You are on page 1of 16

SMART FTK PROJECT

ERICSSON APPROVAL FORM

ITEM DISCIPLINE APPROVED / REJECTED CHECKED BY DATE ERICSSON REMARKS

1 SAQ

2 RF

3 TRM

4 CME
Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 1 of 16

VENDOR Ericsson Telecommunications


SITE ID N1420 CANDIDATE A
SEARCHING NAME San Mateo-Salinungan West
SITE NAME San Mateo-Salinungan West
REGION II

VENDOR DETAILS
COMPANY NAME: Ericsson Telecommunications AGENTS NAME: Virgilio Todeno Jr.
OFFICE TELEPHONE NO.: MOBILE PHONE NO.: 9474264138

OPERATOR REVIEW COMMENTS

SIGNATURE: x ACCEPTABLE ACCEPTABLE BUT “NOT PREFERRED” REJECTED

SAQ NAME: REASON:

DATE:

SIGNATURE: ACCEPTABLE ACCEPTABLE BUT “NOT PREFERRED” REJECTED

RF NAME: REASON:

DATE:

SIGNATURE: ACCEPTABLE ACCEPTABLE BUT “NOT PREFERRED” REJECTED

TRM NAME: REASON:

DATE:

SIGNATURE: ACCEPTABLE ACCEPTABLE BUT “NOT PREFERRED” REJECTED

CME NAME: REASON:

DATE:

SAQ = SITE ACQUISITION, RF = RADIO FREQUENCY PLANNING, TRM = TRANSMISSION PLANNING,


CME = CIVIL, MECHANICAL AND ELECTRICAL

COMMENTS
Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 2 of 16

1.0 SITE LOCATION


BUILDING NAME (IF ROOFTOP): NA

Salinungan West, San Mateo, Isabela


SITE ADDRESS:

POST CODE/ZIP CODE 3318

COORDINATE SYSTEM USED

LONGITUDE (E) - FROM GPS: 121.615968 LATITUDE (N)- FROM GPS: 16.865597

DISTANCE OF SITE FROM SEARCH GROUND HEIGHT – ASL (ABOVE


112 m
RING CENTRE POINT (USE GPS): SEA LEVEL) FROM GPS:

High Rise Building High Rise Building Shop House

Shopping Centre Club House Hotel

Rooftop Billboard Housing Estate x Vacant Land


SITE TYPE:
Squatters Land Greenfield Billboard Golf Course

Water Tank Co-location with Co-location with

Other

ANTENNA SUPPORT
x New Existing
STRUCTURE:

Rooftop - Wall Mount Rooftop - Tower Rooftop - Bipod

Rooftop - Poles Rooftop - Guyed Pole Rooftop - Billboard

EXISTING/EXPECTED ANTENNA Greenfield - Monopole x Greenfield - Self Support Water Tank


SUPPORT STRUCTURE:
Greenfield - Guyed Greenfield - Billboard

Other

PROPOSED OR EXISTING HEIGHT


OF ANTENNA SUPPORT 48 m
STRUCTURE:

HEIGHT OF BUILDING (IF


NA NO. OF FLOORS: NA
ROOFTOP):

EQUIPMENT LOCATION: Van / Cabin Existing Room x Outdoor Cabinet

AREA AVAILABLE FOR LEASE: 224 sqm


Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 3 of 16

2.0 SITE OWNER/PROVIDER


x Single Couple Family

Organization Municipality Barangay


TYPE OF OWNERSHIP:
Operator - Globe Operator - SUN Operator - San Miguel

Unclear Other

DOES THE OWNER HAVE THE


ORIGINAL COPY OF THE TITLE x Yes No
DEED AND OTHER DOCUMENTS?

DOES THE SITE PROVIDER/OWNER


LEASE THE PROPERTY FROM Yes x No
ANOTHER COMPANY/PERSON?

DO THE PROVIDER/OWNER/S LIVE


OUTSIDE THE PHILIPPINES OR Yes x No
TRAVEL A LOT?

NAME (1): Rodolfo Angel

ADDRESS (1): Salinungan West, San Mateo, Isabela

POST CODE/ZIP CODE (1): 3318 OFFICE/HOME TELEPHONE NO.:

MOBILE TELEPHONE NO: 9356412581 MOBILE TELEPHONE NO:

NAME (2):

ADDRESS (2):

POST CODE/ZIP CODE (2): OFFICE/HOME TELEPHONE NO.:

MOBILE TELEPHONE NO: MOBILE TELEPHONE NO:

IF THE OWNER LIVES IN A FOREIGN


COUNTRY, DOES HE/SHE HAVE A Yes, (Provide Details Below) x No
POWER OF ATTORNEY?

NAME:

ADDRESS:

POST CODE/ZIP CODE: OFFICE/HOME TELEPHONE NO.:

MOBILE TELEPHONE NO: FAX NO. :

ADDITIONAL COMMENTS:
The Lessor is willing to engage in a lease contract of ten(10) years with complete property documents.
Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 4 of 16

3.0 SITE ACCESS


IS THE SITE ACCESSIBLE 24 HOURS IF ‘NO’ WHAT ARE THE
x Yes No
A DAY, 7 DAYS A WEEK? ACCESS HOURS?

WHAT IS THE PROCESS TO


FOLLOW TO ACCESS THE SITE?

Name: PHONE NO.:


CONTACT PERSON FOR ACCESS:
Name: PHONE NO.:

ADDITIONAL COMMENTS:

4.0 SITE DEVELOPMENT WORKS


GREENFIELD SITES
WHAT IS THE LENGTH OF THE NEW
x <50m 51-150m 151-300m 301-500m 500+
ACCESS ROAD REQUIRED?

HOW FAR AWAY IS THE NEAREST


x <50m 51-150m 151-300m 301-500m 500+
POWER LINE?

IS THE SITE ON A SLOPE? x No Yes, What is the Slope? 1 Vertical = Horizontal

Swamp or Pond Rocky Ground Reclaimed Land


IS THE SITE LOCATED IN ONE OF
THE FOLLOWING CONDITIONS?
Dense Forest x None of these

ACCORDING TO THE OWNER IS THE


x No Minor Flooding (<0.5m) Minor Flooding (>0.5m)
SITE PRONE TO FLOODING?

ROOFTOP SITES

OVERALL STRUCTURAL CONDITION /


New Good Average Poor (Aged, Lots of Cracks)
INTEGRITY OF BUILDING?

DO ANY APPROVED BUILDING PLANS


& DRAWINGS EXIST FOR THE Yes No
BUILDING?

AGE OF BUILDING: YEARS

ADDITIONAL COMMENTS:
This vacant lot is located inside the lessor's residential compound along the barangay road of Salinungan West. Cutting down some trees
will be needed.
Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 5 of 16

ADDITIONAL ITEMS TO BE DONE


1) CANDIDATE LOCATION IN REGARD TO SEARCH RING
2) MAPAND DIRECTIONS TO SITE.
3) PANORAMIC PHOTOS – FROM 0° TO 330° (IN 30° INCREMENTS)
4) SITE PHOTOS - SEE BELOW FOR MINIMUM PHOTOS REQUIRED.

FOR ROOFTOP/ROOFTOP CO-LOCATION


Front of the Building Side of the Building Tower/Bipod/Pole Location

Equipment Housing Location

OR

FOR GREENFIELD/GREENFIELD CO-LOCATION


Entrance to Site Access Road Route Nearest Power line

Tower/Monopole Location Equipment Housing Location

CANDIDATE LOCATION IN REGARD TO SEARCH RING NORTH↑

CANDIDATE LOCATION

FRONT OF BUILDING / ENTRANCE TO SITE


Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 6 of 16

SIDE OF SITE

ACCESS ROAD TO THE SITE


Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 7 of 16

ACCESS ROAD TO THE MAIN ROAD

PANORAMIC 0 DEGREES
Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 8 of 16

PANORAMIC 30 DEGREES

PANORAMIC 60 DEGREES
Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 9 of 16

PANORAMIC 90 DEGREES

PANORAMIC 120 DEGREES


Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 10 of 16

PANORAMIC 150 DEGREES

PANORAMIC 180 DEGREES


Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 11 of 16

PANORAMIC 210 DEGREES

PANORAMIC 240 DEGREES


Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 12 of 16

PANORAMIC 270 DEGREES

PANORAMIC 300 DEGREES


Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 13 of 16

PANORAMIC 330 DEGREES

PANORAMIC 360 DEGREES


Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page: Page 14 of 16

SITE MAP & DIRECTIONS TO SITE (Remember to indicate the North Point on the Map)

PLEASE STATE DIRECTIONS TO THE SITE BELOW –


This vacant lot is located inside the lessor's residential compound along the barangay road of Salinungan
West.
Site Acquisition Report (SAQR)
Doc. Ref. No.: TSD-RO-SF-SAQR

Date: February 21, 2021

Owner TSD Revision 0 Page 15 & 16 of 16

N/A

Photo No. 1 TAPPING POINT Photo No. 2

N/A N/A

Photo No. 3 Photo No. 4

N/A N/A

Photo No. 5 Photo No. 6

You might also like