You are on page 1of 1

H.01.c5 (An.

Membuat)
Pintu Air Type C5

B = 500 Mm
H = 500 Mm
H' = 600 Mm

Harga Jumlah
No. Macam Pekerjaan Satuan Kuantitas Satuan Harga
(Rp.) (Rp.)
I. BAHAN
1. Bahan konstruksi
- Besi siku kg 38.00 16,000.00 608,000.00
- Besi kanal kg 6.00 21,000.00 126,000.00
- Plat Bronze kg 146,300.00 -
- Plat Besi Cor kg 20,300.00
- Besi plate kg 20.00 13,200.00 264,000.00
- Besi plate strip kg 4.00 13,700.00 54,800.00
- Besi beton kg 4.00 13,600.00 54,400.00
- Pipa kg 57,500.00 -
1,107,200.00
2. Bahan bantu konstruksi (10% dari bahan konstruksi) 110,720.00
3. Bahan dikerjakan mesin
- Besi st 42 kg - 20,300.00 -
- Besi st 60 kg - 21,400.00 -
- Dop (Bronze) kg - 153,000.00 -
- Dop (Besi Cor) kg 20,300.00
- Besi cor kg - 20,300.00 -
- Roda gigi M 10 ps - 8,396,000.00 -
-
4. Bahan-bahan lain
- Mur Baut 1/2",5/8",7/8" kg 2.00 30,500.00 61,000.00
- Paku keling 3/4",5/8", 7/8" kg 4.00 25,500.00 102,000.00
- Nipple bh - 4,000.00 -
-Spie bh - 9,000.00 -
- Gembok Besar bh 1.00 101,000.00 101,000.00
- Drucklager kecil/besar bh 699,000.00 -
- Angker Bolt bh - 33,200.00 -
- Splite Pen/Pengunci bh 1.00 61,000.00 61,000.00
- Kayu Balau m3 - 9,200,000.00 -
- Na F + ring bh - 112,000.00 -
- Seal Karet m - 117,000.00 -
325,000.00
II ONGKOS KERJA
- Ongkos kerja konst kg 72.00 4,900.00 352,800.00
- Ongkos kerja mesin kg 6,800.00 -
- Ongkos kerja kayu m3 249,500.00
- Sandblasting & cat besi m2 2.32 72,500.00 167,939.00
- Pengecatan tanpa sand m2 39,900.00
520,739.00

III P E M A S A N G A N kg 65.45 3,000.00 196,363.64


IV P E M B O N G K A R A N kg 5,000.00
V TRANSPORT kg 65.45 750.00 49,090.91
245,454.55

Jumlah I s/d V 2,309,113.55


Jumlah Harga 2,309,113.55
Harga satuan pekerjaan per-buah 2,309,000.00

You might also like