RENCANA BIAYA
PROYEK : Proyek Universitas Negeri Gorontalo
BIDANG : PERALATAN
Periode : Juli 2012
I. TC 1 / PEINNER 1.00 Unit 1.00 1.00 1.00 1.00 1.00 5.00 50,000,000.00 250,000,000.00 32,000,000.00 32,000,000.00 935,000,000.00 935,000,000.00 1,934,000,000.00 60,000,000.00 10,000,000.00
1 Asuransi 1.00 Bh 1.00 1.00 1.00 1.00 1.00 5.00 2,000,000.00 10,000,000.00
2 Biaya Pengecatan TC 1.00 ls 1.00 1.00 10,000,000.00 10,000,000.00
3 Perijinan 1.00 Bh 1.00 1.00 2,000,000.00 2,000,000.00
4 Mast Section = ( ) / 3 = - sect 2.00 sec 0.00 2.00 2.00 1,575,000.00 3,150,000.00 0.00
5 Jack Up setiap 6 section 1.00 Kali 0.00 1.00 1.00 4,500,000.00 4,500,000.00
6 Jack Down 1.00 Kali 1.00 1.00 4,500,000.00 4,500,000.00
7 Colar ( sabuk ) 1.00 Kali 0.00 1.00 1.00 2,200,000.00 2,200,000.00
8 Bracing INVST per 12 sect 1.00 Kali 0.00 1.00 1.00 28,000,000.00 28,000,000.00
9 Pemasangan Bracing 1.00 Kali 1.00 1.00 4,000,000.00 4,000,000.00
10 Pembongkaran Bracing 1.00 Kali 1.00 1.00 4,000,000.00 4,000,000.00
11 Kabel Power TC 50.00 Mtr 50.00 50.00 275,000.00 13,750,000.00
12 Lampu HPIT 400 Watt (Jib= 6 + Logo= 4) 10.00 Bh 10.00 10.00 715,000.00 7,150,000.00
13 Logo TC 1.00 Bh 1.00 1.00 1,500,000.00 1,500,000.00
14 HT operator 2.00 Bh 2.00 2.00 1,400,000.00 2,800,000.00
15 Penangkal petir 1.00 set 1.00 1.00 5,000,000.00 5,000,000.00
16 Mobil /Crawler Crane 1.00 Unit 1.00 1.00 2.00 24,000,000.00 48,000,000.00
17 Angkur TC 1.00 Unit 1.00 1.00 45,000,000.00 45,000,000.00
0.00 0.00 0.00
18 Genset 250 Kva 1.00 Unit 1.00 1.00 1.00 1.00 1.00 5.00 16,500,000.00 82,500,000.00 0.00
Peijinan 1.00 Kali 1.00 1.00 2,000,000.00 2,000,000.00
0.00 0.00
18 Kunjungan / Survey 0.00 0.00 0.00
- Tiket Pesawat ( Jakarta - Gorontalo ) 2.00 Kali 2.00 2.00 4.00 1,500,000.00 6,000,000.00
- Tiket Pesawat ( Gorontalo - Jakarta ) 2.00 Kali 2.00 2.00 4.00 1,500,000.00 6,000,000.00
19 Akomodasi Staff 0.00 0.00
- Hotel 1.00 Kali 1.00 1.00 2.00 800,000.00 1,600,000.00
- Transport lokal 4.00 Kali 4.00 4.00 8.00 200,000.00 1,600,000.00
20 Transport Team 0.00 0.00 0.00
- Erection 1.00 Kali 1.00 1.00 18,000,000.00 18,000,000.00
- Dismantling 1.00 Kali 1.00 1.00 18,000,000.00 18,000,000.00
21 Akomodasi Team 0.00 0.00 0.00
- Erection 1.00 Kali 1.00 1.00 6,000,000.00 6,000,000.00
- Dismantling 1.00 Kali 1.00 1.00 6,000,000.00 6,000,000.00
22 Operator Tower Crane 2.00 org 2.00 2.00 2.00 2.00 2.00 10.00 3,400,000.00 34,000,000.00
23 Reger ( By Proyek ) 2.00 org 2.00 2.00 2.00 2.00 2.00 10.00 2,000,000.00 20,000,000.00
24 Pelaksana 1.00 org 1.00 1.00 1.00 1.00 1.00 5.00 3,500,000.00 17,500,000.00
25 Mekanik 1.00 org 1.00 1.00 1.00 1.00 1.00 5.00 2,500,000.00 12,500,000.00
26 Biaya Mess Pelaksana 0.00 Kl 0.00 1,000,000.00 0.00
27 Dapur Umum 0.00 Kl 0.00 600,000.00 0.00
0.00
0.00
SUB TOTAL
0.00 677,250,000.00 1,934,000,000.00 60,000,000.00 10,000,000.00
TOTAL
Note : Mob - Demob Peralatan Kerja dan Alat Bantu Kerja sesuai Sk dan u/ wilayah JABODETABEK.
PT ADHI KARYA ( Persero ) Tbk
DIVISI PRECAST dan PERALATAN
RENCANA BIAYA
PROYEK : spp proyek
BIDANG :
Periode :
I. TC 1 / PEINNER 1.00 Unit 2.00 1.00 2,600,000.00 26,000,000.00 2.00 1.00 1.00 900,000.00 9,000,000.00 2,184,000,000.00 105,000,000.00
1 Asuransi 1.00 Bh 10,000,000.00
2 Biaya Pengecatan TC 1.00 ls 10,000,000.00 0.00
3 Perijinan 1.00 Bh 0.00 2,000,000.00
4 Mast Section = ( ) / 3 = - sect 2.00 sec 3,150,000.00 0.00
5 Jack Up setiap 6 section 1.00 Kali 4,500,000.00 0.00
6 Jack Down 1.00 Kali 4,500,000.00 0.00
7 Colar ( sabuk ) 1.00 Kali 2,200,000.00 0.00
8 Bracing INVST per 12 sect 1.00 Kali 0.00 28,000,000.00
9 Pemasangan Bracing 1.00 Kali 4,000,000.00 0.00
10 Pembongkaran Bracing 1.00 Kali 4,000,000.00 0.00
11 Kabel Power TC 50.00 Mtr 13,750,000.00 0.00
12 Lampu HPIT 400 Watt (Jib= 6 + Logo= 4)10.00 Bh 7,150,000.00 0.00
13 Logo TC 1.00 Bh 1,500,000.00 0.00
14 HT operator 2.00 Bh 2,800,000.00
15 Penangkal petir 1.00 set 5,000,000.00
16 Mobil /Crawler Crane 1.00 Unit 48,000,000.00
17 Angkur TC 1.00 Unit 45,000,000.00 - Jika Ditinggal
0.00
18 Genset 250 Kva 1.00 Unit 18.00 12.00 30.00 8,600.00 278,640,000.00 82,500,000.00 278,640,000.00
Peijinan 1.00 Kali 0.00 2,000,000.00
0.00
18 Kunjungan / Survey 0.00 0.00
- Tiket Pesawat ( Jakarta - Gorontalo ) 2.00 Kali 6,000,000.00
- Tiket Pesawat ( Gorontalo - Jakarta ) 2.00 Kali 6,000,000.00
19 Akomodasi Staff 0.00
- Hotel 1.00 Kali 1,600,000.00
- Transport lokal 4.00 Kali 1,600,000.00
20 Transport Team 0.00 0.00
- Erection 1.00 Kali 18,000,000.00
- Dismantling 1.00 Kali 18,000,000.00
21 Akomodasi Team 0.00 0.00
- Erection 1.00 Kali 6,000,000.00
- Dismantling 1.00 Kali 6,000,000.00
22 Operator Tower Crane 2.00 org 34,000,000.00
23 Reger ( By Proyek ) 2.00 org 0.00 0.00 20,000,000.00
24 Pelaksana 1.00 org 0.00 0.00 17,500,000.00
25 Mekanik 1.00 org 0.00 0.00 12,500,000.00
26 Biaya Mess Pelaksana 0.00 Kl 0.00 - By Project
27 Dapur Umum 0.00 Kl 0.00 - By Project
RENCANA BIAYA
PROYEK :
BIDANG :
Periode :
RENCANA BIAYA
PROYEK : Proyek Universitas Negeri Gorontalo
BIDANG : PERALATAN (TOWER CRANE)
I. TC 1 / PEINNER 1.00 Unit 1.00 1.00 1.00 1.00 1.00 5.00 50,000,000.00 250,000,000.00 32,000,000.00 32,000,000.00 425,000,000.00 0.00 489,000,000.00
1 Asuransi 1.00 Bh 1.00 1.00 1.00 1.00 1.00 5.00 2,000,000.00 10,000,000.00
2 Biaya Pengecatan TC 1.00 ls 1.00 1.00 10,000,000.00 10,000,000.00
3 Perijinan 1.00 Bh 1.00 1.00 2,000,000.00 2,000,000.00
4 Mast Section = ( ) / 3 = - sect 2.00 sec 0.00 2.00 2.00 1,575,000.00 3,150,000.00 0.00
5 Jack Up setiap 6 section 1.00 Kali 0.00 1.00 1.00 4,500,000.00 4,500,000.00
6 Jack Down 1.00 Kali 1.00 1.00 4,500,000.00 4,500,000.00
7 Colar ( sabuk ) 1.00 Kali 0.00 1.00 1.00 2,200,000.00 2,200,000.00
8 Bracing INVST per 12 sect 0.00 Kali 0.00 0.00 0.00 28,000,000.00 0.00
9 Pemasangan Bracing 0.00 Kali 0.00 0.00 4,000,000.00 0.00
10 Pembongkaran Bracing 0.00 Kali 0.00 0.00 4,000,000.00 0.00
11 Kabel Power TC 50.00 Mtr 50.00 50.00 275,000.00 13,750,000.00
12 Lampu HPIT 400 Watt (Jib= 6 + Logo= 4 10.00 Bh 10.00 10.00 715,000.00 7,150,000.00
13 Logo TC 1.00 Bh 1.00 1.00 1,500,000.00 1,500,000.00
14 HT operator 2.00 Bh 2.00 2.00 1,400,000.00 2,800,000.00
15 Penangkal petir 1.00 set 1.00 1.00 5,000,000.00 5,000,000.00
16 Mobil /Crawler Crane 1.00 Unit 1.00 1.00 2.00 15,000,000.00 30,000,000.00
17 Angkur TC 0.00 Unit 0.00 0.00 45,000,000.00 0.00
0.00 0.00 0.00
18 Genset 175 Kva 1.00 Unit 1.00 1.00 1.00 1.00 1.00 5.00 0.00 0.00 0.00
Peijinan 0.00 Kali 0.00 0.00 2,000,000.00 0.00
0.00 0.00
18 Kunjungan / Survey 0.00 0.00 0.00
- Tiket Pesawat ( Jakarta - Gorontalo ) 2.00 Kali 2.00 2.00 4.00 1,500,000.00 6,000,000.00
- Tiket Pesawat ( Gorontalo - Jakarta ) 2.00 Kali 2.00 2.00 4.00 1,500,000.00 6,000,000.00
19 Akomodasi Staff 0.00 0.00
- Hotel 1.00 Kali 1.00 1.00 2.00 800,000.00 1,600,000.00
- Transport lokal 4.00 Kali 4.00 4.00 8.00 200,000.00 1,600,000.00
20 Transport Team 0.00 0.00 0.00
- Erection 1.00 Kali 1.00 1.00 18,000,000.00 18,000,000.00
- Dismantling 1.00 Kali 1.00 1.00 18,000,000.00 18,000,000.00
21 Akomodasi Team 0.00 0.00 0.00
- Erection 1.00 Kali 1.00 1.00 6,000,000.00 6,000,000.00
- Dismantling 1.00 Kali 1.00 1.00 6,000,000.00 6,000,000.00
22 Operator Tower Crane 2.00 org 2.00 2.00 2.00 2.00 2.00 10.00 3,400,000.00 34,000,000.00
23 Reger ( By Proyek ) 0.00 org 0.00 0.00 0.00 0.00 0.00 0.00 2,000,000.00 0.00
24 Pelaksana 0.00 org 0.00 0.00 0.00 0.00 0.00 0.00 3,500,000.00 0.00
25 Mekanik 0.00 org 0.00 0.00 0.00 0.00 0.00 0.00 2,500,000.00 0.00
26 Biaya Mess Pelaksana 0.00 Kl 0.00 1,000,000.00 0.00
27 Dapur Umum 0.00 Kl 0.00 600,000.00 0.00
0.00
0.00
SUB TOTAL
TOTAL
Menyetujui,
PT ADHI KARYA ( Persero ) Tbk
DIVISI PRECAST dan PERALATAN
RENCANA BIAYA
PROYEK : Proyek Universitas Negeri Gorontalo
BIDANG : PERALATAN (TOWER CRANE)
Ir. ……………………….
Project Manager
PT ADHI KARYA ( Persero ) Tbk
DIVISI PRECAST dan PERALATAN
RENCANA BIAYA
PROYEK :
BIDANG :
Biaya Op
Biaya Pondasi Biaya BBM
Uang Makan
No Uraian Jenis Alat Vol Sat
Buat Pondasi + BBM Jumlah jam Jumlah BBM Vol Bln H. Sat Jumlah
Bongkar Pondasi Jumlah BBM
Bongkar ( Ltr/jam ) kerja / hari Hari ( Rp ) ( orang )
SUB TOTAL
TOTAL
Menyetujui,
PT ADHI KARYA ( Persero ) Tbk
DIVISI PRECAST dan PERALATAN
RENCANA BIAYA
PROYEK : spp proyek
BIDANG :
TOTAL 1,181,927,314.68
RENCANA BIAYA
PROYEK : spp proyek
BIDANG :
Ir. ……………………….
Project Manager ( I. Gede Putra. P ) Harry Wibowo, ST, MM
Manager Project Manager
PT. ADHI KARYA (Persero)Tbk
PRECAST dan PERALATAN
NO URAIAN JULI
30 31 1 2 3 4 5
1 MOBILISASI TC (BANDUNG - GORONTALO)
2 MOBILISASI MOBILE CRANE (20 T /30 T)
3 BONGKAR MUATAN TC
4 PEMASANGAN ANGKUR TC
5 PENGECORAN PONDASI TC
6 MOBILISASI MOBILE CRANE (45 T)
7 ERECTION TC
8 PEMASANGAN SYSTEM ELEKTRIK, ASSESORIS DLL
9 JACKUP TC
10 LOADING TEST (DEPNAKER)
WAKTU
AGUSTUS KETERANGAN
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
BY PROYEK
BY PROYEK
Rekapitulasi Tagihan Schafolding PT. Adhi Karya (Persero) Tbk. - Proyek UNG 2011
Kwt Deskripsi
Total Tagihan
Sisa Tagihan
Tbk. - Proyek UNG 2011
80,000,000.00 80,000,000.00
94,200,000.00 9,420,000.00 1,884,000.00 101,736,000.00
94,200,000.00 9,420,000.00 1,884,000.00 101,736,000.00
94,200,000.00 9,420,000.00 1,884,000.00 101,736,000.00
94,200,000.00 9,420,000.00 1,884,000.00 101,736,000.00
94,200,000.00 9,420,000.00 1,884,000.00 101,736,000.00
59,899,000.00 5,989,900.00 1,197,980.00 64,690,920.00
119,724,500.00 119,724,500.00
100,000,000.00
274,000,000.00
356,623,500.00