Year tonna
2009 267
2010 890
2011 199
2012 3
2013 105
2014 46
2015 182
2016 977
2017 1269
FINISHED REINFORCEMENT
CONCRETING
THE READY FLOOR
MILLPARK BUILDING - 2017
–PLATES
BEFORE CONCRETING
READY REINFORCEMENT
4. PARTS OF THE BAMTEC DOCUMENTATION -
A SZÜKSÉGES TERVEK
TRADITIONEL REINFORCEMENT PLANS
BOTTOM LAYER (BASIC + ADDITIONAL)
TOP LAYER (BASIC + ADDITIONAL)
Building RF: Rollout: much shorter Building RF: much longer Building RF: Rollout: much shorter
6. DIFFICULTIES AT THE DESIGN OF BAMTEC IN
HUNGARY - BAMTEC ALKALMAZÁS TERVEZÉSI
PROBLÉMÁI MAGYARORSZÁGON
THE DIFFICULTIES AND CHARACTERISTICS TO USE OF BAMTEC IN HUNGARY
2. DESIGN METHODS:
DIRECT DESIGN BAMTEC, IT MEANS START FROM FEM DESIGN, CARPETS
AND ADDITIONAL REINFORCEMENT
MODIFIED DESIGN (REDESIGN) THE TRADITIONAL PLANS TO BAMTEC PLANS,
IT MEANS TO DIVED THE REINFORCEMENT FOR BAMTEC CARPETS AND
ADDITIONAL REINFORCEMENT
3. GENERAL CASES IN HUNGARY:
REDESIGN THE TRADITIONAL RF PLANS
THIS MEANS EXTRA COST FOR THE DESIGN, AND LESS SAVING IN THE
REINFORCEMENT
THIS IS HANDICAP IN THE COMPETITION