Completion - Definition
Basic well completion sequence
Pertinent completion concepts
PSI completion
Basic completion principles
Completion elements
Advanced completion technology
Reservoir properties.
PE
PR
ER
– Open hole/Cased hole completion
M
MEA
EA
– Sand control measures
BI
BLIIT
LIY
– Stimulation
TY
POROSITY
CEMENT
Sw
– Artificial lift
So
The physical and chemical qualities of theROCK
fluids.
– Completion metallurgy GRAIN
– Elastomer qualities
– Deposits/Scale Production Packer w/ feed through
– Expandable tubulars
– Future well interventions
– Well trajectory
– Intelligent Wells
ZXP Liner Hanger
– Multilateral wells and Packer w/ PBR
Hydrasplit w/ 4 1/2" on lateral leg
and 7" on main leg
Seal Bore Diverter
Reservoir
Reservoir
Reservoir
Reservoir
Guns
Work String
Liner
RIH anchor
Set
Clean
with
outisolation
excess
and stimulate
assembly
RIH anchor
Set
Clean
with
outnew
excess
and
isolation
stimulate
assembly
Set Packer
Position
Repeat process
guns and
until
perforate
all
new zone
zones are completed
Millout Extension
Liner Hanger
Retrievable
ISO-Packer
Locator
Tubing Seal
Assembly
Liner
Upper Completion
(Well Control)
Lower Completion
(Production Control)
Cased Hole Completion Open Hole Completion
Screen
Packing element
Liner Hanger
Inner Sleeve
Sliding Sleeve
Flow Ports
Shrouded
Sliding Sleeve
Packing element
Production
Packer
Tool guards
Side pocket
w/flow ports
Side
Pocket
Mandrel
Side
Pocket
Mandrel
Safety
DHSV
Systems
CASV
FLX-4
PCT
Data
Acquisition
System
Bumper Wire Termination
Subs
Safety Valve
Production
Packer Permanent
Monitoring
Hydraulic/Electric
Sleeve
Isolation
Hydraulic/Electric Packer Mechanical
Cable Protection Conduit
Systems (Clamps) Sleeve
Splice Sub and
Connectors
Seating Nipple
or Bull Plug
Tubing
Fiber or Electric
Conduit
Production and
Isolation Packer
with by-pass
feature
Cased and
Open
Cased
Pressure
Cased andand
Cased integrity
cemented
unsupported and
cemented
at cemented
mainthe junction
main
cemented
bore
junction main bore
&bore
lateral.
andmain
achieved
Pressure lateral
with
bore at
isolation
LEVEL 6 the junction
the casing achieved
LEVEL
LEVEL
LEVEL15 4 with completion
LEVEL
LEVEL 2 3
Lateral
Opencased
hole,
but or
notunsupported
cemented liner
in lateral © 2007 Baker Hughes Incorporated
All rights reserved.
Multilateral Systems
Level 6
– FORMation Junction
Level 5
– FORM 5 Junction
– HydraSplit HP Junction 1
– RAM Hanger (3 or 5) 2
Level 3-4
– HOOK Hanger System
8-1/2"
Open
Hole
6-7/8" EXPress
Screen
Expandable technology
Reduced consumption
Drilling Fluids 60% reduction
Future