Professional Documents
Culture Documents
Modul 3
Perletakan Rol
Perletakan Sendi
Perletakan Jepit
Contoh perletakan dan diagram free-body nya
One unknwn.The re acti on is a force which acts
perpendicular to M slot.
Penyederhaan
struktur di
lapangan yang
kemudian diubah
menjadi free-body Kondisi dilapangan
diagram)
Free-Body Diagram
Penyederhaan
struktur di
lapangan yang
kemudian diubah
menjadi free-body
diagram)
SO LLFTION
The free-mmdv diagram of the hcam is ahrivrn in Fig. 5-76. Since the
supporl a » Frxcxt be wab exerts Lhzcc reactions nn h c' from.
dc ctntcd as 1 . I,. and M {. The magnitudes o£ I h<'s< rcac tions arc
r77r£/so1‹'7r, and ckcir sense has been m si‹iiied.We ucighi or zhc t•c
am.
\fi' —— \ IXP 9.BI ”j K = 9gI I*f. acts through Lhc bcum's ccnlcr n:L gTuvit¿ CA.
nhirh is a m frum A since the beam ir un1r
T\vo smooth pipes cach haviny a mass oF.J€O kg. arc supported h¿ the
fOF\iZ@ i ICS Oé TSC BE B€t QA iEt @. ñ— . NIâW COC fW€ @6 IâFIIS
for cach pJpc and both pipes tog<lhcr.
EJTc<1 uf sI+›puJ
‹a I
SO LMTtOM
The idealized mo •l from which we must drnw Ltte free-hc›dv
diagrams is skt+ma izt F›p .lb. Here \hc pipes arc klcntificcL the [d fi
dimensions Zaire been added. aTtd \he phvsicol situatian reduced to its
+s“
” ‘ • •-
SOLUTION
The idealized model of ihc platform will tic considered in t«'o
tJimcnsions because by observation rh< leading and the dimensions arc
all s*wmctricul ahout a \ crtical plane passing through its center.
^ Fig. fi— IfJb. The ccmnccrion at A is considcrcd to he a piz and thc
cahlc supports the platform at Zf. The direction of the caMc and a 'cragc
- 1.4tl m dimensions of the platform arc listcd. and thc center of gravity C has
A, 0.
fl m been determined. It is from thus m‹•dcl i hat a c ho¥'c drawn the
frcc -tsody diagram shou n in Fig. (Or. Thc platform’s u'ctght is
2t8h9.81 i = 1 o2 N. The force cc•mponc nts A, end A, along with ihc
cnt›lc force T rcprcsent the reactions ihat fir›ifi pins and froth cables
cxcrt on ih< platform. Ftp- 5—ltd. As a rcsuli. half their magnitudes
arc dc+’clupcd on cach side of the ptacfurn›.
Tugas 3
Catatan:
•Diketik komputer
•Dikirim dalam bentuk PDF
•Dikirim ke email:tugas.sipil.unanda@gmail.com
•Subjek email: Anstruk1_Tugas ke_Nama Kelas_NIM_Nama saudar/I
contoh: Anstruk1_Tugas 1_kelas S5_201…019_rifki umar
Tidak sesuai dengan ketentuan, tidak adakan diterima dan dianggap tidak
mengumpulkan tugas.