Surgical Lights
Installation Manual
Copyright
The device bears CE mark indicating its conformity with the provisions of the Council
Directive 93/42/EEC concerning medical devices and fulfills the essential requirements of
Annex I of this directive.
© 2009 Nanjing Mindray Bio-Medical Electronics Co., Ltd. All rights Reserved.
For this Operator’s Manual, the issued Date is 2009-02 (Version: 1.0).
owns the intellectual property rights to this Mindray device and this manual. This manual may
refer to information protected by copyrights or patents and does not convey any license under
Disclosure of the information in this manual in any manner whatsoever without the written
Release, amendment, reproduction, distribution, rental, adaption and translation or any other
derivative work of this manual in any manner whatsoever without the written permission of
Mindray is strictly forbidden.
informational or editorial purposes. They are the property of their respective owners.
I
All information contained in this manual is believed to be correct. Mindray shall not be liable
for errors contained herein or for incidental or consequential damages in connection with the
furnishing, performance, or use of this manual.
Mindray is responsible for the effects on safety, reliability and performance of this device, only
if:
n all installation operations, expansions, changes, modifications and repairs of this device
are conducted by Mindray authorized personnel.
n the electrical installation of the relevant room complies with the applicable national and
local requirements, and
II
Warranty
Definitions
l Main unit: Integrated facilities which implement the specified function separately.
Generally speaking, the main unit should include power supply, control system and some
functional modules.
l Accessories: Materials connected to the main unit to extend or implement specified
function.
l Consumables: Disposable or short-life parts which should be replaced each time after
use or periodically.
Exemptions
Mindray's obligation or liability under this warranty does not include any transportation or
other charges or liability for direct, indirect or consequential damages or delay resulting from
the improper use or application of the device or the use of parts or accessories not approved
by Mindray or repairs by people other than Mindray authorized personnel.
III
Return Policy
Return Procedure
In the event that it becomes necessary to return this device or part of this device to Mindray,
the following procedure should be followed:
Return authorization: Contact the Customer Service Department and obtain a Customer
Service Authorization number. This number must appear on the outside of the shipping
container. Returned shipments will not be accepted if the number is not clearly visible. Please
provide the model number, serial number, and a brief description of the reason for return.
Freight policy: The customer is responsible for freight charges when this device is shipped to
Mindray for service (this includes customs charges).
Return address: Please send the part(s) or device to the address offered by the Customer
Service Department.
IV
Contact Information
Manufacturer: Nanjing Mindray Bio-Medical Electronics Co., Ltd.
Address: BLK C#01/04 Ascendas iHUB Center, 55# Jiangjun Road, Jiangning,
Nanjing, Jiangsu, 211100, P.R.China
Tel: +86 25 52076001
Tel: 0049-40-2513175
Fax: 0049-40-255726
V
This page is intentionally blank.
Table of Contents
1 System Overview....................................................................................... 1-1
1.1 Safety .................................................................................................1-1
1.1.1 Safety Notes .............................................................................1-1
1.2 Safety Instructions...............................................................................1-2
1
Table of Contents
2
1 System Overview
1.1 Safety
Note Meaning
Read the statement below the symbol. The statement alerts
you to an operating hazard that can cause personal injury.
1-1
System Overview
l Read this manual and make sure you understand every instruction before
installing the surgical light. Strictly follow instructions given in this manual
to install the surgical light.
l Before installing or servicing the surgical light, make sure the mains supply
has been disconnected from the light. The switch that completes this
function is not a part of the light.
l Use spare parts and accessories specified by Nanjing Mindray only.
Otherwise, safety and effectiveness of the light may be compromised.
l Do not direct the light column toward human eyes. Do not lay any light
reflector in the illuminated area.
l Do not place anything on the lamp housing or hang anything on the light
arms or lamp housing.
1-2
System Overview
l Refer to the operator’s manual for more information on using the light.
1-3
This page is intentionally blank.
2 Preparing for Installation
Train the
Sign the sales
contract.
A happy operators
cooperation!
2-1
Preparing for Installation
Before installing the surgical light, the customer needs to provide such as foundation pieces
as embedded pieces and extension pieces, and electrical power meeting the light’s
requirements. The preparations should be completed by the hospital before the light is
delivered. The customer should guarantee that all the preparations meet the requirements
listed in the Chapter 2 of this manual.
The above-mentioned foundation pieces are not included in the standard installation service.
If the customer does need extra service on preparing these items, extra fee will be charged.
Details on designing and installing those items are listed in Appendix A.
Before installing the light, make sure the customer has read and signed the installation notice
(see Appendix B). The notice should be signed in duplicate, one for the customer and the
other for the contractor.
The ceiling to bear the HyLite 6700/HyLite 6500 series surgical lights and the associated
embedded pieces (plates, bolts, etc.) should meet the requirements listed in the table below.
Note that safety factors are not included in the listed values. Take local requirements into
consideration when installing the lights.
l Make sure that both the foundation pieces and the ceiling meet the loading
capacity requirement.
l Only the qualified personnel can evaluate the loading capacity of the ceiling.
2-2
Preparing for Installation
The mains supply wiring should be prepared by the hospital, and meet the following
requirements:
n The mains supply should be 100-240V and 50/60Hz. The power cable should be the
multistrand copper core, the section of which should be 2.5 mm2.
n Make sure that the mains supply wire is protected by plastic pipe, and laid to the
installation location of the power module.
n Make sure the power switch meets the requirements of IEC 328. Note that Mindray does
not supply the mains power switch.
n The overall electrical environment should meet the requirements of IEC 60364-7-710
and other applicable regulations.
Besides the foundation pieces, the hospital should also provide 4 M16 bolts for the
installation of the single-lighthead or double-lighthead model, or 6 M16×150 bolts for the
triple-lighthead model. To connect the flange tube, the embedded bolts should be uniformly
distributed within a circle with a diameter of 240mm. These figures below are shown how to
install the bolts.
If the embedded bolts are uniformly distributed within a circle with a diameter of 320mm, the
bolts should be installed on the ceiling fixing piece, and then connected with the flange tube.
l All the connection methods should meet the loading capacity requirements
listed in 2.2.2. Make sure the connection is reliable. Otherwise, accidents
2-3
Preparing for Installation
may occur.
l Make sure the mechanical performance of the bolt is Class 8.8.
l This section deals with the case in which the flange tube is installed below
the ceiling. If the flange tube is installed above the ceiling, please refer to
Appendix A.
Three flange tube lengths are available. Choose the suitable length according to the ceiling
height.
The ceiling is a reference plane. If the upper surface of the flange tube is flush with the ceiling,
look up the suitable length in the table below.
2-4
Preparing for Installation
Table 2-2 Relationship between the ceiling height and the flange tube length
If the upper surface of the flange tube is not flush with the ceiling, choose the suitable flange
tube length according to the actual installation location. See the table below for details.
Table 2-3 Relationship between the ceiling height and the flange tube length
l The flange tube length should be determined before signing the sales
contract.
2-5
Preparing for Installation
Before installing the surgical light, make sure no component is missing. Main components of
the HyLite 6700/HyLite 6500 series surgical lights are shown in the figure below.
2-6
Preparing for Installation
The following tools are needed for installing the HyLite 6700/HyLite 6500 series surgical
lights.
Tape ruler 1 5m
Besides the above tools, during the installation procedure, the personnel need to climb up
and down. Certain climb tools should be prepared.
2-7
This page is intentionally blank.
Installation Procedure
3 Installation Procedure
3.1 Instruction
l Strictly follow the steps introduced in this chapter to install every part.
Otherwise, the light may fall and cause personal injury and/or property
damage.
l Before installing the surgical light, make sure the mains supply has been
switched off.
3-2
Installation Procedure
After all the preparations mentioned in the Chapter 2 are completed, the installation can start.
First, screw an M16 nut and flat washer onto every bolt from the bottom. Then, align the holes
on the flange tube to the bolts and insert the flange tube onto the bolts. After adjusting the
bolts to a suitable height, screw a flat washer, spring washer and nut onto every bolt in the
given order.
Level the flange tube with the spirit level(the location of the bubble in the spirit level is shown
in the Figure 3-2), and then tighten the nuts with a torque wrench (60±5 Nm). An installed
flange tube is shown in the figure below.
3-3
Installation Procedure
l Use the spirit level to make sure the flange tube is vertical in every direction.
Otherwise, the swivel-arm assembly cannot be adjusted properly.
l During the installation, make sure that neither the flat washer nor spring
washer is missing.
l Make sure that the upper part of the bolt (above the flange) is less than
120mm, and the lower part (below the flange) greater than 40mm.
3-4
Installation Procedure
Insert the shaft of the arm assembly into the flange tube. Pull the cables connected to shaft
through the flange tube without damaging them. Align the holes on the shaft to those on the
flange tube. Fix the shaft to the piece with 8 M8×20 screws (stainless steel; countersunk) and
tighten the screws with a torque wrench (11±2Nm). An installed arm assembly is shown in
the figure below.
Flange tube
Swivel arm
Screws
Use a spirit level to make sue the shaft of the arm assembly is vertical. .
3-5
Installation Procedure
l Use the spirit level to make sure the flange tube is vertical in every direction.
If not, readjust every nut on the flange tube.
l Before leaving factory, fix the straps between swivel arms to facilitate to
install them. Be sure to remove the straps after installed swivel arms.
l The swivel arm assembly is heavy and needs to be lifted for installation. Do
not install it alone. Always use extra helpers and exercise caution when
installing it.
3-6
Installation Procedure
Fix the power module to the flange bottom with 4 M4×12 combination screws. Note that every
lighthead is equipped with a power module. Fix the fuse module to the flange bottom with 2
M4×12 combination screws. Installed power modules and fuse module are shown in the
figure below.
3-7
Installation Procedure
After all the power and fuse modules are in place, locate the brown wire (without wiring
terminal) on the power module and insert it to the L port of the fuse module, and then locate
the blue wire and insert it to the N port of the fuse module. Tighten the wires with a
flat-headed screwdriver. Fix the wires to the flange with cable ties. An installed power module
is shown in the figure below.
As the same as the above method, connect the L, N and PE wires from the mains supply with
the port of the fuse module without sign. If the wires are too long, be sure to fix them to the
flange by cable ties.
The three cables running through the swivel arm assembly are marked “1”, “2” and “3”, which
respectively corresponds to the lower, middle and upper spring arm. Make sure the power
module marked “6700” is connected to the 6700 lighthead and that marked “6500” to the
6500 lighthead. For the light system with more than one lighthead type, make sure the 6500
lighthead is always installed above the 6700 lighthead. Make sure the power modules are
correctly connected to the corresponding cables before turning on the light.
Pull the cables through the opening of the flange tube, and then plug them into the 3-pin port
shown in the figure below:
3-8
Installation Procedure
3-9
Installation Procedure
Slide the shaft end of the spring arm into the bearing seat of the short swivel arm from below
and push the spring arm upward. Put the washer and the circlip in place and make sure the
circlip is completely engaged in the groove of the spring arm. Be sure to press the circlip flat
until it clicks. After installing the circlip, be sure to check that it has been engaged in the
groove of the spring arm. Use the bottom of screwdriver to press the whole surface of the
circlip.
Insert the male-end of the sliding contact into the shaft end of the spring arm. Place the
restraint cap on the top of the sliding contact and fix the cap with 2 M3×25 screws. Push the
cable into the swivel arm and put on the arm cap. A spring arm is shown in the figure below.
Bearing seat of
Short swivel short swivel arm
arm
Spring
Shaft end of spring
arm
arm
l The circlip is the load-bearing part. Be sure to install it flat and fix it firmly.
Otherwise, lighthead may fall off.
l The circlip is for single use only. Do not use it again once you have removed
it.
3-10
Installation Procedure
The middle spring arm and the upper spring arm are installed the same way. The following
introduction uses installation of the upper spring arm as the example. .
Remove the 2 5mm braking screws and the 4 M5×15 countersunk screws from the long
swivel arm. Take out the bearing seat of the end of the long swivel arm and insert it into the
shaft end of the spring arm. Put the washer and the circlip in place and make sure the circlip
is completely engaged in the groove of the spring arm. Be sure to press the circlip flat until it
clicks. After installing the circlip, be sure to check that it is completely engaged in the groove
of the spring arm. Use the bottom of screwdriver to press the whole surface of the circlip. The
installed circlip is shown in the figure below.
Insert the male-end of the sliding contact into the shaft end of the spring arm. Put on the
restraint cap and fix it with 2 M3×25 screws. The installation is shown in the figure below.
3-11
Installation Procedure
Push the cables into the swivel arm and put on the arm cap. Press the bearing seat back into
the swivel arm and align the holes of the braking screws to those on the bearing seat. Screw
the 2 3mm braking screws and 4 M5×15 countersunk screws back onto the swivel arm. A
spring arm is shown in the figure below.
l The circlip is the load-bearing part. Be sure to install it flat and fix it firmly.
Otherwise, lighthead may fall off.
l The circlip is for single use only. Do not use it again once you have removed
it.
3-12
Installation Procedure
Remove the fixing screw from the aluminum cover, push the cover upward and pull out the
locking piece. Slide the shaft end of the vertical gimbal joint into the spring arm. Re-install the
locking piece and the aluminum cover and then tighten the fixing screw.
3-13
Installation Procedure
l For the light system with more than one lighthead type, make sure the 6500
lighthead is always installed above the 6700 lighthead.
l During the installing process, be sure to protect glass surface from damage.
Do not directly touch the glass surface with your hands directly. Otherwise,
it may become dirty.
Insert bulbs into the bulb holder on the focusing mechanism. Every focusing mechanism
needs two bulbs. See the figure below for how to install the bulb.
l Do not directly touch the new bulb. Insert the new bulb into the bulb holder
with the plastic bag on. Make sure the bulb is reliably installed, and then
remove the plastic bag.
l Make sure the bulb’s pins are reliably inserted into the bulb holder.
Insert the focusing mechanism into the lighthead and tighten the 3 knurled screws, as the
figure below shows. Note that the focusing mechanism is mistake-proof. To install the
focusing mechanism, first locate the banana connector that is marked by a red dot, and then
align it with corresponding installing hole, which is also marked by a red dot, on the lighthead.
3-14
Installation Procedure
l During the installing process, be sure to protect glass surface from damage.
Do not directly touch the glass surface with your hands directly. Otherwise,
it may become dirty.
Place the central handle onto the handle of the focusing mechanism. Push the central handle
forward along the handle of the focusing mechanism. Turn the central handle until it clicks.
Focusing mechanism
Central handle
3-15
Installation Procedure
3.7 Adjustment
3.7.1 Power on
Switch on the light to make sure it can work normally. If not, follow the steps below to locate
the problem, and then refer to the service manual for solutions.
1. Check the control panel for alarm indications and then follow the instructions given in the
service manual to solve the problem.
2. If there is no alarm indication on the control panel, check the fuse and replace the broken
one. Note that only the L port is equipped with a fuse.
3. Open the back of the control panel, and check input voltage. The input voltage should be
20±1V when the bulb is not on. Otherwise, something is wrong between the power module
and the control panel.
4. Check the indicators on the control board. If they work properly, the power module is fine.
5. Check every wire and make sure that they are tightened.
Install the ceiling cover only when you are sure that the light can work properly.
Put together the two halves of the ceiling cover at the flange tube and fix the cover with 6
countersunk M4×12 screws. Fix the silica gel ring on the upper edge of the ceiling cover.
Put together the two halves of the fixing ring and loosely screw the ring with 2 hex M4×
12screws. Slide the ring all the way up to the ceiling cover. Make sure that the ceiling cover is
flush with the ceiling. Make sure the fixing ring and the ceiling cover are completely engaged,
and then tighten the hex screws on both sides of the ring. The installation is shown in the
figure below.
Fixing ring
Ceiling cover
3-16
Installation Procedure
Vertical movement of the light is limited by a fixed lower and adjustable upper stop. The
adjustable upper stop can be adjusted with a 5mm Allan key. The adjustment hole is shown in
the picture below. To raise the stop, turn the Allan key counterclockwise. To lower the stop,
turn the Allan key clockwise. The adjustable range is from horizontal to 45º up. After
adjusting the stop, make sure the spring arm does not collide with anything.
l When adjusting the height stop, pay attention to the distance between the
floor and the ceiling. Make sure the lightheads collide with neither of them.
The loading capacity of the spring arm is adjustable with a 5mm Allan key. The adjustment
hole is shown in the picture below. The loading capacity must be adjusted if the lighthead
cannot remain at any desired position. If the lighthead moves down, the loading capacity
needs to be increased. Insert the Allan key into the adjustment hole and turn it
counterclockwise to do so. If the lighthead moves up, the loading capacity needs to be
decreased. Insert the Allan key into the adjustment hole and turn it clockwise to do so.
3-17
Installation Procedure
The braking force of the spring arms is adjustable with a 5mm Allan key. Adjust the braking
force to adjust the mobility of the spring arms. After adjustment the lighthead should be able
to remain at any desired position. The adjustment hole is shown in the figure below.
3-18
Installation Procedure
Theoretically speaking, if the spring arm can be rotated by a horizontal pushing force that is 5
±1N and vertically imposed on the spring arm at the point shown in the figure below, the
braking force is appropriately optimized.
l Make sure the spring arm moves prior to the swivel arm.
3-19
Installation Procedure
The braking force of the swivel arms is adjustable with a 5mm Allan key. Adjust the braking
force to adjust the mobility of the swivel arms. After adjustment the lighthead should be able
to remain at any desired height. The adjustment hole is shown as the figure below.
Theoretically speaking, if the swivel arm can be rotated by a horizontal pushing force that is
14±1N and vertically imposed on the swivel arm at the point shown in the figure below, the
braking force is appropriately optimized.
l Make sure the spring arm moves prior to the swivel arm.
3-20
Installation Procedure
The braking force of the horizontal gimbal joint is pre-adjusted at factory. Follow the figures
below to check its braking force. If the lighthead can stably stay at all the three positions, the
braking force does not need to be adjusted.
Otherwise, adjust the braking screws on the back of the control panel with a 5mm Allan key.
The adjustment hole is shown in the figure below.
3-21
Installation Procedure
The braking force of the horizontal gimbal joint is pre-adjusted at factory. Follow the figures
below to check the braking force. If the lighthead can stably stay at both the positions, the
braking force does not need to be adjusted.
Otherwise, loosen the fixing screws with a 2mm Allan key to expose the adjustment screw.
Adjust the adjustment screw with a 5mm Allan key until the desired braking force is achieved.
Turn the rubber sleeve back to its original position, and then tighten the four screws. The
adjustment hole is shown in the figure below.
3-22
Installation Procedure
3-23
Installation Procedure
Check and make sure the lighthead and the light arms can stay at any desired position. It is
recommended asking the medical professionals to check the light according to their usual
practices.
l Pay attention to the spring arms and the swivel arms. Make sure they can
stay at any desired position.
After the check, clean the light surface. Make sure there is not any dirt or sign of wear. At last,
clean the installation site.
l Exercise caution when cleaning the light surface. Do not damage the
surface.
3-24
4 Operation Training
4.1.1 Keys
You can
4-2
Operation Training
The status indicator is comprised of a LED. See the table below for details.
4-3
Operation Training
You can:
2. Turn the central handle counter clockwise to diminish the light field.
4-4
Operation Training
You can:
1. Use the encircling handle to move the lighthead to the desired position.
2. Use the central handle to move the lighthead to the desired position.
l Exercise care when adjusting the lighthead position. Do not pull the
mechanical arm beyond the limits.
l Non-sterile personnel can only use the encircling handles to move the
lighthead to the desired position.
l Sterile personnel can only use the central handle to move the lighthead to
the desired position.
4-5
Operation Training
4.4 Maintenance
4.4.1 Cleaning/Disinfection/Sterilization
2. Use a piece of cloth dipped with disinfectant to wipe the exterior of the lighthead.
3. Use a piece of disposable cloth dipped with water to clean the exterior of the lighthead,
and then wipe it dry.
n glass
4-6
Operation Training
When clean/disinfect/sterilize the surgical light, you should pay attention to:
The handle is made of a special material that can be autoclaved using 134℃ steam for 8
minutes.
l Do not load any weight onto the handle during the sterilization process.
Otherwise, the handle will deform permanently.
l The handle will be worn out after a certain period of service. Be sure to
replace the old the handle if you see any sign of wear, such as cracking,
fading.
The lighthead should be disinfected/cleaned after every use and at lease once a week.
The central handle must be sterilized after every use.
4-7
Operation Training
After removing the central handle, loosen 3 knurled screws by hand, and then remove the
focusing mechanism. Replace the bulb as instructed below:
4-8
Operation Training
The bulb for the HyLite 6700 is OSRAM HLX64642 24V 150W, and that for HyLite 6500 is
OSRAM HLX64638 24V 120W. They are different specification. Be sure to use the right bulb.
l It is recommended that the bulb holder be replaced together with the bulb.
l Be sure to use the exact bulb designated by the manufacturer. Using other
bulbs may result in property damage or be degraded performance.
4-9
Operation Training
l After removing the bulb holder, be sure to check whether the bulb holder and
wires have burned sign. If you find, be sure to contact with Nanjing Mindray
service department.
l The HyLite 6700 lighthead uses 150W bulbs and HyLite 6500 120W. Be sure to
use the right bulb.
l Do not touch the new bulb directly. Insert the new bulb into the bulb holder
with the plastic bag on. Make sure the bulb is reliably installed, and then
remove the plastic bag.
4-10
Operation Training
The surgical light is a permanently installed suspension device. Its safety is critical. Check the
base of swivel arm assembly and the joint pieces above it regularly, and make sure there are
no signs of cracking, rusting. The nuts connecting the arm assembly and other fixing/braking
screws must be checked regularly. Tighten loose nuts/screws once you find them. Or, you
can call Mindray customer service department for assistance.
4-11
Operation Training
4.7 Troubleshooting
l The chapter is meant to help you solve common problems only. In case you
encounter problems not included in this chapter or following the introduced
methods cannot solve the problem, contact the customer service
department for help. Unauthorized device servicing is not allowed.
l Device servicing is to be performed by personnel authorized by Nanjing
Mindray only. Unauthorized device servicing may result in personal injuries
and/or property damage.
4-12
5 Appendices
If the ceiling is too high, or laminar flow facilities are installed, or no foundation pieces are
pre-installed, both the installation plan and foundation pieces should be made according to
the actual environment
Anyhow, the HyLite surgical light should be installed with the distance between the bottom of
the flange tube and the floor within the ranges specified in the figure below.
5-1
Appendices
This following flow chart introduces how to install the flange tube in an operating room in
which no foundation pieces has been pre-installed. However, the actual installation procedure
may differ depending on the actual conditions. Be sure to make the installation plan according
to the actual conditions.
5-2
Appendices
In case that there are no embedded pieces on the ceiling floor, you can pierce the floor to fix
the bolts. Note that, the installed pieces may be covered by such layers as the leveling layer
and the sound-proof layer.
First, draw a Φ320 circle around the installation location, and mark 6 Φ18 holes uniformly
spread (60ºapart) within the circle. Use tools (such as electric drills) to pierce the ceiling floor
on the marked locations.
Then, place the ceiling fixing piece on the upper surface of the ceiling floor, and align the
holes of the ceiling fixing piece with those on the ceiling floor. Insert the bolts into the holes
and through the ceiling floor. Slide flat washers, spring washers and nuts onto the upper parts
of the bolts (as Figure 5-3 shows). Slide the adaptor plate onto the lower parts of the bolts,
and then flat washers, spring washers and nuts. Use a torque wrench (180 Nm) to tighten all
the nuts.
5-3
Appendices
l Be sure to take the actual condition into account, for example interference
with the steel bars in the concrete. If necessary, leave the piercing and
connection job to the customer.
If the floor cannot be pierced, you can use expansion bolts. The floor should be solid concrete
floor and meet the requirements below.
l Concrete floor classification≥ B 25.
l Floor thickness≥15cm.
l Distance between the top of an installed expansion bolt and the upper surface of the
ceiling floor ≥15cm.
First, draw a Φ320 circle on the installation location, and mark 6 Φ18 holes uniformly
spread(60º apart) within the circle. Drill holes on the marked locations to a depth that suits
the expansion bolt, and then clean the holes.
5-4
Appendices
Then, place the adaptor plate on the ceiling floor and align the holes on the adaptor plate with
those on the ceiling floor. Hammer expansion bolts into the holes and through the adaptor
plate. Use a torque wrench (180 Nm) to turn the bolts to expand them. Tighten (still 180Nm)
the bolts again in an hour.
l Make sure the holes on the ceiling floor are drilled to a depth that suits the
expansion bolts, neither too deep nor too shallow.
In case of other installation conditions, connect the surgical light otherwise. Two connection
methods are introduced below as examples.
In case there is a beam on top of the installation location, pierce the beam (or use expansion
bolts) laterally in a way similar to the one mentioned above. But note that the left and right
splints and the adaptor plate are usually welded together.
5-5
Appendices
If the ceiling cannot be used for the installation, fix two channel steels (5# or larger).
5-6
Appendices
The adaptor plate can be divided into two types: double-lighthead adaptor (four bolts, PN:
0091-20-102844) and triple-lighthead adaptor plate (6 bolts, PN: 0091-20-102845).
If other bolts have been prepared on the installation location, the adaptor plate or the
extension piece needs to be made accordingly.
5-7
Appendices
In case of laminar-flow operating rooms, to run across the pressure boxes above the ceiling,
it is necessary to raise the installation location of the flange tube. The floor height (usually
greater than 3500mm) determines whether an extension piece is needed.
Determining Height
See the tables below for proper dimensions of the extension piece and the flange tube.
5-8
Appendices
3700-3900 0 1200
3500-3700 0 1000
To install the extension piece, use its upper surface as the ceiling fixing piece. See Piercing
5-9
Appendices
To connect the flange tube, the extension piece needs to provide 4 or 6 M16 bolts,
respectively for the double-lighthead or triple-lighthead configuration. The bolt length
between the bottom of the extension piece and the top of the flange tube should be 100mm±
20mm.
5-10
Appendices
For operating rooms in which there are no laminar-flow facilities and the ceiling floor is high
enough, running the flange tube across the pressure boxes is no longer a factor to be
considered.
If the floor height is greater than 3500mm, install the extension and the flange tube the same
way as in the laminar-flow operating rooms.
5-11
Appendices
In the laminar-flow operating room, if the power module and fuse module are still installed on
the flange tube, it may be difficult for service or maintenance in the future. Install the power
module on other locations, such as on the wall.
In this case, first, the customer needs to pull the mains power cable to the location
where the power module is to be installed. Then pull the cable from the power module
to the flange tube (the cable should be protected by a conduit). The diameter of the
cable depends on the distance between the power module and the flange tube (the
distance should not be greater than 20m). See the table below for details.
5-12
Appendices
If the power module is not installed beneath the ceiling, replace the big ceiling cover
assembly (PN: 0091-30-102274) with the small ceiling cover assembly (PN:
0091-30-102273). See section 3.8 for installation details.
5-13
Appendices
B Installation Notice
Honorable Customer:
You have selected the HyLite Series Surgical Lights. We sincerely appreciate the trust you
have placed in us. To install and use the light safely and effectively, be sure to prepare as
required below.
1. On the installation site, you need to pre-install the embedded piece, and make sure its
loading capacity is greater than 600kg. If the installing environment is different from those
listed in this manual, contact the customer service department authorized by Nanjing
Mindray. We will appoint engineers to observe the installation site, and then design the
installing plan accordingly.
2. Our engineer will check the site before starting the installation. Please provide the
architecture drawings and specifications on the materials, main walls and floor types.
3. After the site inspection, please provide (or ask your construction contractor to provide)
the three-view installing drawings (including top view, front view and side view). They
should include the detail dimensions of the operating room, fixing location of the surgical
light, maximum swivel radius of the surgical light, floor height and ceiling height. The
drawings should show the detail locations and dimensions (mm) of all the relative objects,
such as the surgical light, beam, ventiduct, medical gas pipes, fluorescent lights, smoke
detectors, sprinkling system and reference wall. Providing the above-mentioned
information can prevent objects from colliding with each other and degrading the clean
level of the operating room.
4. Make sure the mains power cable is pulled to a point that is within 15cm away from the
fuse module of the light. The prepared power cable should be a three-wire cable (Live,
Neural and Earth) The wires inside the cable should be color coded and the section of the
wire should be greater than 2.5mm2 For every wire, at least 4cm should be reserved for
connection. .
5. Provide names and phone numbers of the in-charge people of such relative parties as
the device management department, infrastructure department, and construction
contractor. You may also need to coordinate between the above-mentioned parties, provide
free access to such facilities as elevators and transporters and make sure no fee will be
charged by any party.
6. Because the surgical light is expensive and has many accessories, to prevent losing,
wearing or damaging the light, please provide a room with a lock to store it. If you have any
other requirements, please contact us a month beforehand.
We agree with the terms mentioned above and will prepare accordingly.
5-14
Appendices
5-15
Appendices
5-16
P/N:
P/N: