Preventive Maintenance for BTS

VENDOR: ✘ HuaWei Motorola Ericsson


Site No. 6410

Site Location: Al Kharj

MEASUREMENTS&TESTS
Check whehter the MS can login the network in all the cells. ✘ Ok Not Ok

Check whether the MS can normally send and receive the short ✘ Ok Not Ok
messages.
Use the MS to make a call test, and check whether the
conversation on all the channels is normal. The normal ✘ Ok Not Ok
conversation must have no noise, call drop or cross-talking.
Clea Not
Alarm check: Cricital ✘
r Clear
Major Clea Not

r Clear
Minor Clea Not

r Clear
NIL
Alarm Detail (If any):

Indoor Checklist(If not ok,please fix)


Check whether outside and inside of cabinet are clean and without ✘ Ok Not Ok
visible dust on the surface.
Check that the cabinets have been securely fastened and are
✘ Ok Not Ok
levelled correctly.
Check that indoor feeder gland plate has been installed correctly. ✘ Ok Not Ok
Check that the DDF box has been installed correctly ✘ Ok Not Ok
Grounding cable
Connection at BTS cabinet ✘ Ok Not Ok
Connection at DDF box ✘ Ok Not Ok
Connection at feeder cable ✘ Ok Not Ok
External Cabling:
Check that the alarm cabling has been connected ✘ Ok Not Ok
IF cables are correclty connected inside the cabinet ✘ Ok Not Ok
trunk cables are correclty connected in the DDF ✘ Ok Not Ok
Labling for every external cable ✘ Ok Not Ok
Jumper are fixed properly ✘ Ok Not Ok
Outdoor Checklist(If not ok,please fix)
Antenna Installation ✘ Ok Not Ok

Grounding of the feeder cable ✘ Ok Not Ok

Check whether the feeder window is sealed. ✘ Ok Not Ok

Mounting Bracket Installation ✘ Ok Not Ok

Arm Support Bracket Installation(If any) ✘ Ok Not Ok

Feeder clamp Installation ✘ Ok Not Ok


Outdoor Labling of Cables ✘ Ok Not Ok
Ok Not Ok

Performed By:
Name: QASIM SHAH
Signature: QASIM SHAH
Date: 16-7-14
Ericsson Date: 16-7-16

22:00
Time started:

23:30
Time End:

Configuation Information
Configuation 2+2+2

Type of Radio Cabinet


3900

Antenna Hight
32
Antenna Direction(degree)

No. of Feeders Per Cell

Type of Site
No. of PCM Link

Remark:
Not Ok Fixed

Not Ok Fixed

Not Ok Fixed
Not Ok Fixed

Not Ok Fixed
Not Ok Fixed
Not Ok Fixed

Not Ok Fixed
Not Ok Fixed

Not Ok Fixed
Not Ok Fixed
Not Ok Fixed
Not Ok Fixed

Not Ok Fixed

Not Ok Fixed

Not Ok Fixed

Not Ok Fixed

Not Ok Fixed
Not Ok Fixed
Not Ok Fixed

Approved By:
Name:
Signature:
Date:
SITE ID SHELTER BTS

TRANSMISSION RACK DDF ALRAMBOX


BTS PW RACK

\
ALRAMBOX BUSBAR
MW SITE ID TOWER VEIW

GSM-AFTER GSM-BEFORE SHELTER


TOWER VEIW GSM

SHELTER GSM