100% found this document useful (1 vote)
847 views2 pages

SCADA Equipment BOQ for 400kV Substation

This document contains a bill of quantities (BOQ) for supply, erection, testing and commissioning of SCADA and communication relay packages for the 400kV Asoj substation. The BOQ lists the items required, quantities, whether the item is to be supplied or erected, and notes providing additional details. It includes items like bay control units, HMI servers, gateways, switches, cables, fiber optic equipment, UPS systems, modems, and integration services. The total quantities of items are provided in the columns.

Uploaded by

Satya
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
847 views2 pages

SCADA Equipment BOQ for 400kV Substation

This document contains a bill of quantities (BOQ) for supply, erection, testing and commissioning of SCADA and communication relay packages for the 400kV Asoj substation. The BOQ lists the items required, quantities, whether the item is to be supplied or erected, and notes providing additional details. It includes items like bay control units, HMI servers, gateways, switches, cables, fiber optic equipment, UPS systems, modems, and integration services. The total quantities of items are provided in the columns.

Uploaded by

Satya
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • SCADA BOQ (SCADA & CRP Package) of 400 KV Asoj Sub Station: Lists detailed bill of quantities (BOQ) for SCADA equipment and materials needed for a 400 KV substation, including specifications and supply details.

GETCO / E / 4S - 118 / BOQ / R0 Dt. 13.01.

2012

SCADA BOQ (for SCADA & CRP Package) of 400 KV Asoj Sub Station Sr. No.
A

Particulars of Item
Supply, Erection, Testing and Commissioning of SCADA equipments and materials as per respective technical specifications and relevant special conditions and suitable for Two Main and Transfer Bus system on 220kV side and Two Main Bus on 66KV side Bay Control Unit / RTU for Substation Auxiliaries # Bay Control Unit for PLCC ** HMI Server computer with required softwares $ DR workstation PC $ Gateway for remote control with software $ Gateway for RTU Data with software $ SCADA software (For Local end only) $ Ethernet Fiber Switches* Line Interface unit - 2 Cable entry, 12 ports Line Interface unit - 8 Cable entry, 32 ports(To be provided in 220 kV Bus Bar Panel in Control Room. OPGW Terminal equipments (FOTE) with required hardware and software for remote connectivity Armoured Fibre Optic approach cable with HDPE duct for connecting OPGW to FOTE Laser Jet colour Printer Laser Jet Printer 3KVA UPS with battery (12V, 26AH X 30 Nos, SMF Battery)$ 3KVA UPS without battery $ Modem for RTU Data Armoured Fibre Optic Cable with HDPE duct Yard Kiosk for 220KV Switchyard Internal Dimensions - 5000 (L) X 3500 (W) X 3300 (H) mm Yard Kiosk for 66KV Switchyard Internal Dimensions - 6000 (L) X 3500 (W) X 3300 (H) mm Panel for mounting SCADA equipments Panel for mounting Station Auxiliaries BCU/RTU Integration of bays (under scope of this tender) with Existing SCADA System.[ Make & Type of SCADA shall be given during detailed engineering.] Spares for SCADA and Protection Bay Control Unit Line Interface Unit - 8 Cable entry, 32 ports Ethernet fiber switch Busbar Protection Peripheral Unit

Unit

Erection Supply Qty Qty

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Nos Nos Nos No. No No No Nos Nos Nos Set MTR. Nos Nos Nos Nos Nos MTR. Nos Nos Nos Nos Job

1 0 0 0 0 0 0 3 5 1 0 0 1 1 0 0 0 1250 2 1 0 0

1 0 0 0 0 0 0 3 5 1 0 0 1 1 0 0 0 1250 2 1 0 0

1 Nos Nos Nos Nos 1 1 1 1

0 1 1 1 1

1 2 3 4

Note: 1) Any material/equipment accessories which are not listed in BOQ or in scope of supply but required to complete the job shall be included and shown in technical bid. 2)*Ethernet switches shall have as many spare ports as utilized ports. 3) ** PLCC BCU shall have sufficient I/Os as per given list. 4) # BCU for station Auxiliary shall have sufficient I/Os as per list or otherwise suitable RTU shall be provided. 5) $ SCADA system to be provided by PGCIL. 400 kv Extension will be used for this Project (220/66 Extension) also. 6) $ EFS in Control Room shall be a part of PGCIL SCADA System.

Page 1 of 2

GETCO / E / 4S - 118 / BOQ / R0 Dt. 13.01.2012

Page 2 of 2

GETCO / E / 4S - 118 / BOQ / R0 Dt. 13.01.2012 
Sr.
No.
Particulars of Item
Unit
Erection 
Qty
Supply 
Qty
A
Supply, Erection
GETCO / E / 4S - 118 / BOQ / R0 Dt. 13.01.2012 
Page 2 of 2