You are on page 1of 17

SAFETY MAN HOURS

IFR IFA AFC AS BUILT


NO DOCUMENT NAME Remarks
Lead Senior Engineer Designer Drafter Lead Senior Engineer Designer Drafter Lead Senior Engineer Designer Drafter Lead Senior Engineer Designer Drafter

PROCESS
CALCULATION
1 Diesel Fire Water Pump 5 6 9 0 0 4 4 6 0 0 2 2 3 0 0 0 0 0 0 0
2 Fire Water Main Ring Hydraulic 6 8 11 0 0 4 5 8 0 0 2 2 3 0 0 0 0 0 0 0
Pipe Size (Main) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Jumlah Titik Hydrant 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 Jockey Pump 5 6 9 0 0 4 4 6 0 0 2 2 3 0 0 0 0 0 0 0
4 Fire Water Demand 5 6 9 0 0 4 4 6 0 0 2 2 3 0 0 0 0 0 0 0
DRAWING
Layout
1 Fire Monitor Layout 3 4 5 0 8 2 3 4 0 6 1 1 2 0 2 0 0 0 0 0
DATASHEET
1 Fire Diesel Pump Data Sheet 5 6 9 0 0 4 4 6 0 0 2 2 3 0 0 0 0 0 0 0
2 Jockey Pump Data Sheet 5 6 9 0 0 4 4 6 0 0 2 2 3 0 0 0 0 0 0 0

TOTAL MAN HOURS PROCESS ENGINEERING 34 42 61 0 8 24 29 43 0 6 10 12 18 0 2 0 0 0 0 0

With As Built Doc Without As Built Doc


SAFETY SAFETY
1. MH Lead 69 69
2. MH Senior 83 83
3. MH Engineer 123 123
4. MH Designer 0 0
5. MH Drafter 16 16
red : doc. Submit
MAN HOUR TOTAL 290 290 black : doc. Internal
Progress Engineering
Minggu
Tanggal

No

1
1.1
1.2
1.3
1.4

Total
P
PROJECT E

Progress Engineering
: Ke-19
: 9 Januari 2018

Deskripsi Kerja

Engineering
Calculation
Proses
Re-Hysis
Pipe Sizing
Equipment Sizing
Mechanical
Vessel Strength Calculation
Horizontal Production Separator (Gatramas)
Horizontal Test Separator (Tapos)
Fuel Gas Filter (Tapos)
Low Temp Separator (Babelan)
Gas Scrubber
KO Drum (Tapos)
Gas Compressor (EXterran)
Gas Booth (Tapos)
Glycol Dehydration Package (EXterran)
Condensate Stripper (Tapos)
Heat Exchanger (Metalindo)
Chiller (Metalindo)
Piping Wall Thickness Calculation
Electrical
Load List
Cable Sizing
Lightning Protection
Grounding Calculation
illumination calculation
Civil
Pondasi Calculation
Pipe Support Calculation
Pipe Rack Design and Calculation
Instrumen
Instrumen Air Demand
Gas Fuel Demand
Diesel Fuel Demand
Instrument Tubing Sizing
Valve Calculation
Custody Gas Meter Calculation AGA3
Safety
Diesel Fire Water Pump
Fire Water Main Ring Hydraulic
Pipe Size (Main)
Jumlah Titik Hydrant
Jockey Pump
Fire Water Demand
Drawing
Process
PFD
P&ID Equipment (Production Separator, Flare, Gas Compressor, Water Evaporator, Pumping)
Mechanical
General Arrangement Vessel Equipment
Piping Plan Process Area
Piping Section
Piping Support
Electrical
Single Line Diagram
Hazardous Area Classification
Lightning Protection Layout
Grounding Layout
Electrical Cable Layout
Cable Tray Layout
Lighting Layout
Electrical Schematic Diagram
Electrical Wiring Diagram
Cathodic Protection Layout
Power & 24 VDC Interconnecting
Civil
Drawing Pondasi
Pipe Support Calculation
Instrument
Control System Architecture Diagram
Instrument Location Plan
Instrument Hook Up & Support Detail
Fire and Gas System Layout
Cable Routing
Control Room Layout
Instrument cable block diagram
Safety
Emergency escape Route
Fire Ring Layout
Hydrant Layout
Fire Monitor Layout
Data Sheet
Mechanical & Piping
Tank Equipment Data Sheet
Close Drain Tank
Condensate Storage Tank
Production Water Tank
Air Receiver Tank
Water Evaporation Package
Vessel Equipment Data Sheet
Horizontal Production Separator
Horizontal Test Separator
Low Temp Separator
Gas Scrubber
KO Drum
Gas Booth
Glycol Dehydration Package
Condensate Stripper
Chiller
Rotating Equipment Data Sheet
Gas Generator Data Sheet
Diesel Generator Data Sheet
Close Drain Pump Data Sheet
KO Drum Pump Data Sheet
Condensate Transfer Pump Data Sheet
Air Compressor Data Sheet
Production Water Pump Data Sheet
Compressor Data Sheet
Heat Exchanger Data Sheet
Filter Data Sheet
Gas Coalesing Filter Data Sheet
Fuel Gas Filter
Electrical
Gas Genset Data Sheet
Diesel Genset Data Sheet
MCC Data Sheet
Power and Control Cable Data Sheet
Instrument
Pressure Gauge Data Sheet
Temperature Indicator Data Sheet
Custody Metering Data Sheet
Valve Data Sheet
Switch Data Sheet
Safety
Fire Diesel Pump Data Sheet
Jockey Pump Data Sheet
re-HAZOP
re-HAZID
Prosedur
Project
Pembobotan Progress Pekerjaan
Master Schedule dan S Curve
Project Organizaton Chart
Mechanical
Hydrotest Procedure
Radiography Procedure
Welding Procedure
Welding Map
WPS & PQR
Welder Certificate
NDT Personel Certificate
Equipment Erection Procedure
Installasi Fitting
Installasi Valve
Transportasi Material
Painting
Commisioning
Electrical
Load Test Procedure
Installasi Cathodic Protection
Installasi Lightning Protection
Civil
Installasi Pondasi
Pilling
Instrument
Leaktest (Hydrotest untuk Header Pipe)
Safety
HSE Plan
HSE Escape Plan
Emergency Respone Plan
Waste Management Plan
Total
PEMBOBOTAN DAN PROGRESS PEKERJAAN
PROJECT EPF RAFFALINDOTAMA – INDRILLCO HULU ENERGY

Bobot % L3
Status
3.95% Submit Approved Submit
25.00% 0.99% 50% 50%
20.000% ###
### ### 0.04% 0.04% 100.000%
### ### 0.03% 0.03% 100.000%
### ### 0.03% 0.03% 100.000%
16.00% 0.16%
75.00%
### 0.01% 0.01% 0.01%
### 0.01% 0.01% 0.01% 100.00%
### 0.01% 0.01% 0.01% 100.00%
### 0.01% 0.01% 0.01%
### 0.01% 0.00% 0.00%
### 0.01% 0.01% 0.01% 100.00%
### 0.01% 0.01% 0.01%
### 0.01% 0.01% 0.01% 100.00%
### 0.01% 0.01% 0.01%
### 0.01% 0.01% 0.01% 100.00%
### 0.01% 0.01% 0.01% 100.00%
### 0.01% 0.01% 0.01% 100.00%
25.00% 0.04% 0.02% 0.02% 100.00%
16.00% 0.16%
20.00% 0.03% 0.02% 0.02% 100.00%
20.00% 0.03% 0.02% 0.02% 100.00%
20.00% 0.03% 0.02% 0.02%
20.00% 0.03% 0.02% 0.02%
20.00% 0.03% 0.02% 0.02%
16.00% 0.16%
40.00% 0.06% 0.03% 0.03% 100.00%
30.00% 0.05% 0.02% 0.02%
30.00% 0.05% 0.02% 0.02%
16.00% 0.16%
16.00% 0.03% 0.01% 0.01% 100.00%
16.00% 0.03% 0.01% 0.01% 100.00%
16.00% 0.03% 0.01% 0.01%
16.00% 0.03% 0.01% 0.01%
16.00% 0.03% 0.01% 0.01%
20.00% 0.03% 0.02% 0.02% 100.00%
16.00% 0.16%
25.00% 0.04% 0.02% 0.02%
25.00% 0.04% 0.02% 0.02%
12.00% 0.02% 0.01% 0.01%
13.00% 0.02% 0.01% 0.01%
25.00% 0.04% 0.02% 0.02%
25.00% 0.04% 0.02% 0.02%
25% 0.99% 50% 50%
20% 0.20%
50% 0.10% 0.05% 0.05% 100.00%
50% 0.10% 0.05% 0.05% 100.00%
16% 0.16%
25% 0.04% 0.02% 0.02% 100.00%
25% 0.04% 0.02% 0.02%
25% 0.04% 0.02% 0.02%
25% 0.04% 0.02% 0.02%
16% 0.16%
9% 0.01% 0.01% 0.01% 100.00%
10% 0.02% 0.01% 0.01% 100.00%
9% 0.01% 0.01% 0.01%
9% 0.01% 0.01% 0.01%
9% 0.01% 0.01% 0.01%
9% 0.01% 0.01% 0.01% 100.00%
9% 0.01% 0.01% 0.01%
9% 0.01% 0.01% 0.01% 100.00%
9% 0.01% 0.01% 0.01% 100.00%
9% 0.01% 0.01% 0.01%
9% 0.01% 0.01% 0.01%
16% 0.16%
50% 0.08% 0.04% 0.04% 100.00%
50% 0.08% 0.04% 0.04%
16% 0.16%
16% 0.03% 0.01% 0.01%
14% 0.02% 0.01% 0.01%
14% 0.02% 0.01% 0.01%
14% 0.02% 0.01% 0.01%
14% 0.02% 0.01% 0.01%
14% 0.02% 0.01% 0.01%
14% 0.02% 0.01% 0.01%
16% 0.16%
40% 0.06% 0.03% 0.03% 100.00%
30% 0.05% 0.02% 0.02% 100.00%
30% 0.05% 0.02% 0.02%
25% 0.99% 50% 50%
25% 0.25%
16%
3% 0.01% 0.004% 0.004%
3% 0.01% 0.004% 0.004% 100.00%
3% 0.01% 0.004% 0.004% 100.00%
3% 0.01% 0.004% 0.004% 100.00%
4% 0.01% 0.005% 0.005%
20%
3% 0.007% 0.004% 0.004% 100.00%
3% 0.007% 0.004% 0.004% 100.00%
2% 0.005% 0.002% 0.002% 100.00%
2% 0.005% 0.002% 0.002% 100.00%
2% 0.005% 0.002% 0.002% 100.00%
2% 0.005% 0.002% 0.002% 100.00%
2% 0.005% 0.002% 0.002% 100.00%
2% 0.005% 0.002% 0.002% 100.00%
2% 0.005% 0.002% 0.002% 100.00%

3% 0.007% 0.004% 0.004% 100.00%


3% 0.007% 0.004% 0.004%
2% 0.005% 0.002% 0.002%
2% 0.005% 0.002% 0.002%
2% 0.005% 0.002% 0.002% 100.00%
2% 0.005% 0.002% 0.002%
2% 0.005% 0.002% 0.002%
16% 0.040% 0.020% 0.020% 100.00%
16% 0.040% 0.020% 0.020% 100.00%
16%
8% 0.02% 0.01% 0.01% 100.00%
8% 0.02% 0.01% 0.01% 100.00%
25% 0.25%
25% 0.06% 0.03% 0.03% 100.00%
25% 0.06% 0.03% 0.03%
25% 0.06% 0.03% 0.03%
25% 0.06% 0.03% 0.03%
25% 0.25%
20% 0.05% 0.02% 0.02% 100.00%
20% 0.05% 0.02% 0.02% 100.00%
20% 0.05% 0.02% 0.02% 100.00%
20% 0.05% 0.02% 0.02% 100.00%
20% 0.05% 0.02% 0.02%
25% 0.25%
25% 0.06% 0.03% 0.03%
25% 0.06% 0.03% 0.03%
25% 0.06% 0.03% 0.03% 100.00%
25% 0.06% 0.03% 0.03% 100.00%
25% 0.99% 50% 50%
20% 0.20%
30% 0.06% 0.03% 0.03% 100.00%
40% 0.08% 0.04% 0.04% 100.00%
30% 0.06% 0.03% 0.03% 100.00%
16% 0.16%
7% 0.01% 0.01% 0.01% 100.00%
7% 0.01% 0.01% 0.01% 100.00%
7% 0.01% 0.01% 0.01% 100.00%
10% 0.02% 0.01% 0.01%
10% 0.02% 0.01% 0.01% 100.00%
7% 0.01% 0.01% 0.01% 100.00%
7% 0.01% 0.01% 0.01% 100.00%
7% 0.01% 0.01% 0.01%
7% 0.01% 0.01% 0.01%
7% 0.01% 0.01% 0.01%
7% 0.01% 0.01% 0.01%
7% 0.01% 0.01% 0.01% 100.00%
10% 0.02% 0.01% 0.01%
16% 0.16%
40% 0.06% 0.03% 0.03%
30% 0.05% 0.02% 0.02%
30% 0.05% 0.02% 0.02%
16% 0.16%
50% 0.08% 0.04% 0.04% 100.00%
50% 0.08% 0.04% 0.04% 100.00%
16% 0.16%
100% 0.16% 0.08% 0.08% 100.00%
16% 0.16%
25% 0.04% 0.02% 0.02% 100.00%
25% 0.04% 0.02% 0.02%
25% 0.04% 0.02% 0.02%
25% 0.04% 0.02% 0.02%
Progress
Progress L2 Minggu IniMinggu Lalu Target Deviasi
Approved

100.000% 0.08%
100.000% 0.06%
100.000% 0.06%

0.00%
100.000% 0.01%
100.000%
0.00%
0.00%
100.000% 0.01%
0.00%
100.000% 0.01%
0.00%
100.000% 0.01%
100.000% 0.01%
100.000% 0.01%
0.02%

100.000% 0.03%
100.000% 0.03%
0.00%
0.00%
0.00%

100.000% 0.06%
0.00%
0.00%

0.01%
0.01%
0.00%
0.00%
0.00%
100.000% 0.03%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

100.000% 0.10%
100.000% 0.10%

100.000% 0.04%
0.00%
0.00%
0.00%

100.000% 0.01%
100.000% 0.02%
0.00%
0.00%
0.00%
100.000% 0.01%
0.00%
100.000% 0.01%
100.000% 0.01%
0.00%
0.00%

100.000% 0.08%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.03%
0.02%
0.00%

0.000%
100.000% 0.007%
100.000% 0.007%
100.000% 0.007%
0.000%

100.000% 0.007%
100.000% 0.007%
100.000% 0.005%
100.000% 0.005%
100.000% 0.005%
100.000% 0.005%
100.000% 0.005%
100.000% 0.005%
100.000% 0.005%
0.00%
100.000% 0.007%
0.000%
0.000%
0.000%
100.000% 0.005%
0.000%
0.000%
100.000% 0.040%
100.000% 0.040%
0.00%
100.000% 0.02%
100.000% 0.02%

100.000% 0.06%
0.00%
0.00%
0.00%

100.000% 0.05%
100.000% 0.05%
100.000% 0.05%
100.000% 0.05%
0.00%
0.00%
0.00%
100.000% 0.06%
100.000% 0.06%

100.000% 0.06%
100.000% 0.08%
100.000% 0.06%

0.01%
0.01%
0.01%
0.00%
100.000% 0.02%
0.01%
0.01%
0.00%
0.00%
0.00%
0.00%
0.01%
0.00%

0.00%
0.00%
0.00%

0.04%
0.04%

0.08%

0.02%
0.00%
0.00%
0.00%
1.5%

You might also like