EDL FEED Tanki Makasar

Description Satuan Total


No

A Process
1 Process Design Basis Lot 0

B Calculation
1 Process
Equipment Sizing Tank 1.500 KL di FT RAHA Lot 1
Equipment Sizing Tank 7000 KL di FT MAKASAR Lot 1
Equipment Sizing Tank 1.500 KL di FT DONGGALA Lot 1
Equipment Sizing Tank 1.500 KL di DPPU HASANUDIN Lot 1
2 Process Safety
Line Sizing Lot 0
3 Mechanical
* Tanki Timbun Cap : 1.500 KL di FT RAHA Lot 1
* Tanki Timbun Cap : 7000 KL di MAKASSAR Lot 1
* Tanki Timbun Cap : 1.500 KL di DONGGALA Lot 1
* Tanki Timbun Cap : 1.500 KL di DPPU HASANUDDIN Lot 1

4 Electrical - -

5 Intrument
-
6 Piping
Wall Thickness Calculation - -
7 Civil

8 Structure

C MDS
1 Process - -

2 Process Safety - -

3 Mechanical
* Tanki Timbun Cap : 1.500 KL di FT RAHA Lot 1
* Tanki Timbun Cap : 7000 KL di MAKASSAR Lot 1
* Tanki Timbun Cap : 1.500 KL di DONGGALA Lot 1
* Tanki Timbun Cap : 1.500 KL di DPPU HASANUDDIN Lot 1

4 Piping - -

5 Electrical - -
5 Instrument
* Tanki Timbun Cap : 1.500 KL di FT RAHA
- ATG, Temperature Transmitter,Pressure Transmitter,
Bretaher valve, Emergency Valve, Etc (as reuired) Lot 1

* Tanki Timbun Cap : 7000 KL di MAKASSAR


- ATG, Temperature Transmitter,Pressure Transmitter,
Bretaher valve, Emergency Valve, Etc (as reuired) Lot 1

* Tanki Timbun Cap : 1.500 KL di DONGGALA


- ATG, Temperature Transmitter,Pressure Transmitter,
Bretaher valve, Emergency Valve, Etc (as reuired) Lot 1

* Tanki Timbun Cap : 1.500 KL di DPPU HASANUDDIN


- ATG, Temperature Transmitter,Pressure Transmitter,
Bretaher valve, Emergency Valve, Etc (as reuired) Lot 1

6 Civil

D GA DRAWING
1 Process
PFD ( RAHA, MAKASAR, DONGGALA, HASANUDIN) Sheet 4
P&ID
* P&ID Legend and Symbol Sheet 2
* P&ID FT RAHA Sheet 1
* P&ID FT MAKASAR Sheet 1
* P&ID FT DONGALA Sheet 1
* P&ID DPPU HASANUDIN Sheet 1
2 Process Safety
3 Mechanical
* Tanki Timbun Cap : 1.500 KL di FT RAHA Sheet 3
* Tanki Timbun Cap : 7000 KL di MAKASSAR Sheet 3
* Tanki Timbun Cap : 1.500 KL di DONGGALA Sheet 3
* Tanki Timbun Cap : 1.500 KL di DPPU HASANUDDIN Sheet 3

4 Piping Lot 16
5 Electrical
6 Instrument
7 Civil

8 Structure

9 Arsitectural

E SPECIFICATION
1 Process &Process Safety
2 Mechanical
* Spesification for Storage Tank Lot 1
* Spesification for Painting Lot 1
3 Piping
4 Electrical
5 Instrument
6 Civl
7 Structure

F DETAIL DRAWING

* Tanki Timbun Cap : 1.500 KL di FT RAHA


- Shell Course Plate Sheet 1
- Shell Course Plate shell detail Sheet 1
- Shell manways - Shell Manhole Sheet 2
- Shell Nozzles Sheet 5
- Bottom Layout Sheet 1
- Bottom Plate Detail Sheet 2
- Annular plates Detail Sheet 1
- Roof Lay Out Sheet 1
- Roof Plate detail Sheet 1
- Roof Nozzles Sheet 5
- Roof manways - Shell Manhole Sheet 1
- Schedules Opening Sheet 1
- Roof Circulat Hatches Sheet 1
- Top Member Detail Sheet 1
- Tank Struktural GA Sheet 1
- Rafter Layout Sheet 1
- Rafter Detail Sheet 1
- Column Detail Sheet 1
- Clean Out Door Sheet 3
- Draw Off Sump Sheet 2
- Name Plate Sheet 1
- Grounding Lug Sheet 1
- Free Vent Sheet 1
- Anchor Chair Sheet 2
- Gooseneck Sheet 1
- Pipe Overflow Sheet 1
- Cable support Sheet 1
- Stairway Platform Sheet 2
- Stairway Platform Detail Sheet 3
- Wing-rail - Hand rail Sheet 1
- Welding Map Sheet 1
-X-Ray Map Sheet 3
* Tanki Timbun Cap : 7000 KL di MAKASSAR
- Shell Course Plate Sheet 1
- Shell Course Plate shell detail Sheet 1
- Shell manways - Shell Manhole Sheet 2
- Shell Nozzles Sheet 5
- Bottom Layout Sheet 1
- Bottom Plate Detail Sheet 2
- Annular plates Detail Sheet 1
- Roof Lay Out Sheet 1
- Roof Plate detail Sheet 1
- Roof Nozzles Sheet 5
- Roof manways - Shell Manhole Sheet 1
- Schedules Opening Sheet 1
- Roof Circulat Hatches Sheet 1
- Top Member Detail Sheet 1
- Tank Struktural GA Sheet 1
- Rafter Layout Sheet 1
- Rafter Detail Sheet 1
- Column Detail Sheet 1
- Clean Out Door Sheet 3
- Draw Off Sump Sheet 2
- Name Plate Sheet 1
- Grounding Lug Sheet 1
- Free Vent Sheet 1
- Anchor Chair Sheet 2
- Gooseneck Sheet 1
- Pipe Overflow Sheet 1
- Cable support Sheet 1
- Stairway Platform Sheet 2
- Stairway Platform Detail Sheet 3
- Wing-rail - Hand rail Sheet 1
- Welding Map Sheet 1
-X-Ray Map Sheet 3
* Tanki Timbun Cap : 1.500 KL di DONGGALA
- Shell Course Plate Sheet 1
- Shell Course Plate shell detail Sheet 1
- Shell manways - Shell Manhole Sheet 2
- Shell Nozzles Sheet 5
- Bottom Layout Sheet 1
- Bottom Plate Detail Sheet 2
- Annular plates Detail Sheet 1
- Roof Lay Out Sheet 1
- Roof Plate detail Sheet 1
- Roof Nozzles Sheet 5
- Roof manways - Shell Manhole Sheet 1
- Schedules Opening Sheet 1
- Roof Circulat Hatches Sheet 1
- Top Member Detail Sheet 1
- Tank Struktural GA Sheet 1
- Rafter Layout Sheet 1
- Rafter Detail Sheet 1
- Column Detail Sheet 1
- Clean Out Door Sheet 3
- Draw Off Sump Sheet 2
- Name Plate Sheet 1
- Grounding Lug Sheet 1
- Free Vent Sheet 1
- Anchor Chair Sheet 2
- Gooseneck Sheet 1
- Pipe Overflow Sheet 1
- Cable support Sheet 1
- Stairway Platform Sheet 2
- Stairway Platform Detail Sheet 3
- Wing-rail - Hand rail Sheet 1
- Welding Map Sheet 1
-X-Ray Map Sheet 3
* Tanki Timbun Cap : 1.500 KL di DPPU HASANUDDIN
- Shell Course Plate Sheet 1
- Shell Course Plate shell detail Sheet 1
- Shell manways - Shell Manhole Sheet 2
- Shell Nozzles Sheet 5
- Bottom Layout Sheet 1
- Bottom Plate Detail Sheet 2
- Annular plates Detail Sheet 1
- Roof Lay Out Sheet 1
- Roof Plate detail Sheet 1
- Roof Nozzles Sheet 5
- Roof manways - Shell Manhole Sheet 1
- Schedules Opening Sheet 1
- Roof Circulat Hatches Sheet 1
- Top Member Detail Sheet 1
- Tank Struktural GA Sheet 1
- Rafter Layout Sheet 1
- Rafter Detail Sheet 1
- Column Detail Sheet 1
- Clean Out Door Sheet 3
- Draw Off Sump Sheet 2
- Name Plate Sheet 1
- Grounding Lug Sheet 1
- Free Vent Sheet 1
- Anchor Chair Sheet 2
- Gooseneck Sheet 1
- Pipe Overflow Sheet 1
- Cable support Sheet 1
- Stairway Platform Sheet 2
- Stairway Platform Detail Sheet 3
- Wing-rail - Hand rail Sheet 1
- Welding Map Sheet 1
-X-Ray Map Sheet 3
G BOQ
* BOQ Final ( Tanki Timbun 1500 di RAHA,
MAKASAR,DONGGALA, HASANUDDIN) Lot 1
H COST ESTIMATE
* Cost Estimate Lot 1
I ILUSTRASI 3D MODELLING
J DOC RKS Lot 1
J PROSEDUR
Prosedure Manual Inspeksi Tanki Baru Ea 1
Prosedure Pemeriksaan Material Masuk Ea 1
Prosedure Fabrikasi Tangki Ea 1
Prosedure ereksi tanki Ea 1
Prosedure Pemeriksaan Ketegakan Ea 1
Prosedure Pemeriksaan Lokal Deviasi Ea 1
Prosedure Pengujian Vakum Ea 1
Prosedure Pengujian Pneumatik untuk Plat Penguat Ea 1
Prosedure Uji Hidrostatis Ea 1
Prosedure Pneumatik Atap Tangki Ea 1
Prosedure Pneumatik Uji NDT Ea 1
kasar

Remarks

Not Required

Not Required (Only info in BOQ)

Not Required (Only info in BOQ)

Not Required (Only info in BOQ)

Not Required (Only info in BOQ)

Not Required (Only info in BOQ)


For estimate BOQ

Not reuired
Not required
Not required
Not required
Not required
Not required

This is only list detail drawing will supply by


Konsultan. if not required, will be deleted
latter at execution phase.