Professional Documents
Culture Documents
A Process
1 Process Design Basis Lot 0
B Calculation
1 Process
Equipment Sizing Tank 1.500 KL di FT RAHA Lot 1
Equipment Sizing Tank 7000 KL di FT MAKASAR Lot 1
Equipment Sizing Tank 1.500 KL di FT DONGGALA Lot 1
Equipment Sizing Tank 1.500 KL di DPPU HASANUDIN Lot 1
2 Process Safety
Line Sizing Lot 0
3 Mechanical
* Tanki Timbun Cap : 1.500 KL di FT RAHA Lot 1
* Tanki Timbun Cap : 7000 KL di MAKASSAR Lot 1
* Tanki Timbun Cap : 1.500 KL di DONGGALA Lot 1
* Tanki Timbun Cap : 1.500 KL di DPPU HASANUDDIN Lot 1
4 Electrical - -
5 Intrument
-
6 Piping
Wall Thickness Calculation - -
7 Civil
8 Structure
C MDS
1 Process - -
2 Process Safety - -
3 Mechanical
* Tanki Timbun Cap : 1.500 KL di FT RAHA Lot 1
* Tanki Timbun Cap : 7000 KL di MAKASSAR Lot 1
* Tanki Timbun Cap : 1.500 KL di DONGGALA Lot 1
* Tanki Timbun Cap : 1.500 KL di DPPU HASANUDDIN Lot 1
4 Piping - -
5 Electrical - -
5 Instrument
* Tanki Timbun Cap : 1.500 KL di FT RAHA
- ATG, Temperature Transmitter,Pressure Transmitter,
Bretaher valve, Emergency Valve, Etc (as reuired) Lot 1
6 Civil
D GA DRAWING
1 Process
PFD ( RAHA, MAKASAR, DONGGALA, HASANUDIN) Sheet 4
P&ID
* P&ID Legend and Symbol Sheet 2
* P&ID FT RAHA Sheet 1
* P&ID FT MAKASAR Sheet 1
* P&ID FT DONGALA Sheet 1
* P&ID DPPU HASANUDIN Sheet 1
2 Process Safety
3 Mechanical
* Tanki Timbun Cap : 1.500 KL di FT RAHA Sheet 3
* Tanki Timbun Cap : 7000 KL di MAKASSAR Sheet 3
* Tanki Timbun Cap : 1.500 KL di DONGGALA Sheet 3
* Tanki Timbun Cap : 1.500 KL di DPPU HASANUDDIN Sheet 3
4 Piping Lot 16
5 Electrical
6 Instrument
7 Civil
8 Structure
9 Arsitectural
E SPECIFICATION
1 Process &Process Safety
2 Mechanical
* Spesification for Storage Tank Lot 1
* Spesification for Painting Lot 1
3 Piping
4 Electrical
5 Instrument
6 Civl
7 Structure
F DETAIL DRAWING
Remarks
Not Required
Not reuired
Not required
Not required
Not required
Not required
Not required