NAME OF PROJECT : CONSTRUCTION OF ILAYA FLOOD CONTROL STRUCTURE, STA. MARIA, ROMBLON EVENT A EVENT
EARLY START OF E-H 5 EARLY FINISH OF B-E
LOCATION : Tablas Island, Romblon LATE START OF E-H 5 LATE FINISH OF B-E
DUMMY DUMMY
PERT / CPM
100
A.1.1(6)-Provision of Combined Field Office, Laboratory and Living Quartes building for the engineers (Rental Basis), A.1.1(11) - Provision of Furnitures/Fixtures, Equipment and Appliances
for the Field Office for the Engineer, B.7(1) - Occupational Safety Health Program, B.5 - Project Billboard/Signboard
90
% 1704(1)b - Haul,
Spread & Compact
F M Embankment
80 30 119 16 200 276 40
A 1701(1) - Unsuitable
C E Excavation
1714(2) - Install
C
70 22 37 135
N Matresses
1702(1)a - Structure 180 221 95
O Excavation Cont. 405(1)a2 -
Install forms &
60
M Pour Conc. on
Pile Cap & SP
Cont. 1713(1) - Install Forms, Cont. 1710(2)a - Excav. for
Foundation & Handlay 4
Q
Pour Concrete & Place Stones for
C L P
1717(2)a1 - Hauling, Falsework and
P A B D Driving of Steel Sheet Piles K Rubble Concrete Struc. O Stones for Grouted Riprap
238 238
8
L
fab. & Install RSB
B.9 - Demobilization
I 405(1)a2 - Install
forms & Pour
40
S Conc. on Pile
Cap & SP
H G H 25 1713(1) - Install Forms, 1710(2)a - Excav. for
85 107 88 110 Pour Concrete & Place
M 30 3 Stones for Rubble
Foundation & Handlay
Stones for Grouted
Concrete Struc. Riprap
E I 20
24
N 20 120 123
T J
10 200 214
0
64 128 192 256 320
NUMBER OF DAYS