Professional Documents
Culture Documents
• Exploration results :
-T reservoir 260 oC
- Probable potential of
about 60 MW
- Proven potential 35 MW
- Steam at the well head
LMS 1-1 (13-19 MW)
- Very clear well targeting
(red)
• 9 Ha land clearance
• This ~ 100 MW geothermal
potential is more than
enough to support a
moderate to big scale of
operation industrial estate
100 MW 16,000 lpm
SABANG
(FREE TRADE ZONE)
1. Revitalization harbour -
dockyard
2. Fish candy
3. Tourism (diving and
sauna)
BANDA ACEH
4. SMC : 150 kV, 20-30km
100 MW SGE Tentative Multi Year Devt Plan
optimizing the reserve … to follow the demand