EXPRESSION OF INTEREST

(EOI)

Title of Consulting Service: BHP/CS/ICB-1/2077/78

Method of Consulting Service: International

Project Name : Consulting Services for Owner's Engineer for Construction of


Budhi Ganga Hydropower Project (20 MW)
EOI : BHP/CS/ICB-1/2077/78
Office Name: Budhiganga Hydropower Project
Office Address: 4th Floor, Department of Electricity Development Building,
Naxal, Sano Gaucharan Kathmandu Kathmandu

Funding agency : Loan


Table of Contents

Section I. A. Request for Expression of Interest 5


Section II. B. Instructions for submission of Expression of Interest 7
Section III. C. Objective of Consultancy Services or Brief TOR 9
Section IV. D. Evaluation of Consultant's EOI Application 11
Section V. E. EOI Forms and Formats 14
A. Request for
Expression of Interest
Request for Expression of Interest
Government of Nepal (GoN)
Name of Employer: Budhiganga Hydropower Project

Date: 26-02-2021 10:00

Name of Project: Consulting Services for Owner's Engineer for Construction of Budhi Ganga Hydropower Project (20 MW)

Name of the Donor Agency: Loan

Donor Loan/Credit/Grant No: 6/614

1. Government of Nepal (GoN) has received a Loan from Single Envelope Procedure toward the cost of Consulting Services for
Owner's Engineer for Construction of Budhi Ganga Hydropower Project (20 MW) and intends to apply a portion of this
loan/credit/grant to eligible payments under the Contract for which this Expression of Interest is invited for International
consulting service
2. The Budhiganga Hydropower Project now invites Expression of Interest (EOI) from eligible consulting firms (“consultant”) to
provide the following consulting services: Procurement of Consulting Services for Owner's Engineer for Construction of Budhi
Ganga Hydropower Project (20 MW)
3. Interested eligible consultants may obtain further information and EOI document free of cost at the address Budhiganga
Hydropower Project,Budhiganga Hydropower Project
4th Floor, Department of Electricity Development Building, Naxal, Sano Gaucharan, Kathmandu, Nepal during office hours on
or before 30-03-2021 11:59 or visit e-GP system www.bolpatra.gov.np/egp or visit the client’s website www.bhp.gov.np
4. Consultants may associate with other consultants to enhance their qualifications.

5. Expressions of interest shall be delivered online through e-GP system www.bolpatra.gov.np/egp on or before 30-03-2021 11:59

6. In case the last date of obtaining and submission of the EOI documents happens to be a holiday, the next working day will be
deemed as the due date but the time will be the same as stipulated.
7. EOI will be assessed based on Qualification 30.0 %, Experience 60.0 %, and Capacity 10.0 % of consulting firm and key
personnel. Based on evaluation of EOI, only shortlisted firms will be invited to submit technical and financial proposal through
a request for proposal.
8. Minimum score to pass the EOI is 60
B. Instructions for Submission of Expression of
Instructions for Submission of Expression of Interest
1. Expression of Interest may be submitted by a sole firm or a joint venture of consulting firms.

2. Interested consultants must provide information indicating that they are qualified to perform the services (descriptions,
organization and employee and of the firm or company, description of assignments of similar nature completed in the last 7
years and their location, experience in similar conditions, general qualifications and the key personnel to be involved in the
proposed assignment).
3. This expression of interest is open to all eligible consulting firm.

4. In case, the applicant is individual consultant, details of similar assignment experience, their location in the previous 4 years and
audited balance sheet and bio data shall be considered for evaluation.
5. The assignment has been scheduled for a period of 43 Months. Expected date of commencement of the assignment is 06-06-
2021.
6. A Consultant will be selected in accordance with the QCBS method.

7. Expression of Interest should contain following information:

(i) A covering letter addressed to the representative of the client on the official letter head of company duly signed by
authorized signatory.
(ii) Applicants shall provide the following information in the respective formats given in the EOI document:

• EOI Form: Letter of Application (Form 1)

• EOI Form: Applicant’s Information (Form 2)


• EOI Form: Work Experience Details (Form 3(A), 3(B) & 3(C))

• EOI Form: Capacity Details (Form 4)

• EOI Form: Key Experts List (form 5).

8. Applicants may submit additional information with their application but shortlisting will be based on the evaluation of
information requested and included in the formats provided in the EOI document.
9. The Expression of Interest (EOI) document must be duly completed and submitted in sealed envelope and should be clearly
marked as “EOI Application for Short-listing for the Consulting Services for Owner's Engineer for Construction of Budhi
Ganga Hydropower Project (20 MW).The Envelope should also clearly indicate the name and address of the Applicant.
Alternatively, applicants can submit their EOI application through e-GP system by using the forms and instructions provided by
the system.
10. The completed EOI document must be submitted on or before the date and address mentioned in the “Request for Expression of
Interest”. In case the submission falls on public holiday the submission can be made on the next working day. Any EOI
Document received after the closing time for submission of proposals shall not be considered for evaluation.
C. Objective of Consultancy Services or Brief TOR
OBJECTIVE OF CONSULTANCY SERVICES OR BRIEF TOR
Document contained Objective and Brief Tor is attached
D. Evaluation of Consultant’s EOI Application
Evaluation of Consultant’s EOI Application
Consultant’s EOI application which meets the eligibility criteria will be ranked on the basis of the Ranking Criteria.

i) Eligibility & Completeness Test


Sl. No. Criteria Title Compliance

1 Corporate Registration

2 Tax Clearance/Tax Return Submission

3 VAT/PAN Registration

4 EOI Form 1: Letter of Application

5 EOI Form 2: Applicant’s Information Form

6 EOI Form 3: Experience (3(A) and 3(B))

7 EOI Form 4: Capacity

8 EOI Form 5: Qualification of Key Experts

9 In case of a natural person or firm/institution/company which is already declared blacklisted and


ineligible by the GoN, any other new or existing firm/institution/company owned partially or fully
by such Natural person or Owner or Board of director of blacklisted firm/institution/company;
shall not be eligible consultant.
10 If the corruption case is being filed to Court against the Natural Person or Board of Director of the
firm/institution /company or any partner of JV, such Natural Person or Board of Director of the
firm/institution /company or any partner of JV shall not be eligible to participate in procurement
process till the concerned Court has not issued the decision of clearance against the Corruption
Charges.

ii) EOI Evaluation Criteria


A. Qualification

Sl. No. Criteria Minimum Requirement

1 Qualification of Key Experts Detail criteria is attached. Please follow signed document
2 Experience of Key Experts Detail criteria is attached. Please follow signed document

Score: 30.0

B. Experience

Sl. No. Criteria Minimum Requirement

1 General Experience of consulting firm Detail criteria is attached. Please follow signed document
Specific experience of consulting firm within last 7 years.
2 In case of person, specific experience of the person within Detail criteria is attached. Please follow signed document
last 4 years.
3 Similar Geographical experience of consulting firm Detail criteria is attached. Please follow signed document

4 Domestic Preference Detail criteria is attached. Please follow signed document

Score: 60.0

C. Capacity

Sl. No. Criteria Minimum Requirement

1 Financial Capacity. Detail criteria is attached. Please follow signed document


Sl. No. Criteria Minimum Requirement

Infrastructure/equipment related to the proposed


2 Detail criteria is attached. Please follow signed document
assignment.

Score: 10.0

Minimum score to pass the EOI is: 60


Note : If the corruption case is being filed to Court against the Natural Person or Board of Director of the firm/institution /company or any partner of JV, such
Natural Person or Board of Director of the firm/institution /company or any partner of JV such consultant’s proposal shall be excluded during the evaluation.
E. EOI Forms & Formats
E. EOI Forms & Formats

Form 1. Letter of Application

Form 2. Applicant’s information

Form 3.Experience (General, Specific and Geographical)

Form 4. Capacity

Form 5. Qualification of Key Experts


Standard EOI Document

1. Letter of Application

(Letterhead paper of the Applicant or partner responsible for a joint venture, including full
postal address, telephone no., fax and email address)

Date: ..........................

To,
Full Name of Client: __________________________
Full Address of Client: ________________________
Telephone No.: ______________________________
Fax No.: ____________________________________
Email Address: _______________________________

Sir/Madam,

1. Being duly authorized to represent and act on behalf of (hereinafter "the Applicant"), and
having reviewed and fully understood all the short-listing information provided, the
undersigned hereby apply to be short-listed by [Insert name of Client) as Consultant for
{Insert brief description of Work/Services}.

2. Attached to this letter are photocopies of original documents defining:

a) the Applicant's legal status;


b) the principal place of business;

3. [Insert name of Client] and its authorized representatives are hereby authorized to verify
the statements, documents, and information submitted in connection with this application.
This Letter of Application will also serve as authorization to any individual or
authorized representative of any institution referred to in the supporting information, to
provide such information deemed necessary and requested by yourselves to verify
statements and information provided in this application, or with regard to the resources,
experience, and competence of the Applicant.

4. [Insert name of Client) and its authorized representatives are authorized to contact
any of the signatories to this letter for any further information.1

5. All further communication concerning this Application should be addressed to the following
person,

[Person]

[Company]

[Address]

[Phone, Fax, Email]

6. We declare that, we have no conflict of interest in the proposed procurement proceedings


and we have not been punished for an offense relating to the concerned profession or

1
Applications by joint ventures should provide on a separate sheet, relevant information for each party to the
Application.
Standard EOI Document

business and our Company/firm has not been declared ineligible.

7. We further confirm that, if any of our experts is engaged to prepare the TOR for any ensuing
assignment resulting from our work product under this assignment, our firm, JV member or
sub-consultant, and the expert(s) will be disqualified from short-listing and participation in
the assignment.

8. The undersigned declares that the statements made and the information provided in the duly
completed application are complete, true and correct in every detail.

Signed :

Name :

For and on behalf of (name of Applicant or partner of a joint venture):


Standard EOI Document

2. Applicant’s Information Form


(In case of joint venture of two or more firms to be filled separately for each constituent
member)

1. Name of Firm/Company:

2. Type of Constitution (Partnership/ Pvt. Ltd/Public Ltd/ Public Sector/ NGO)

3. Date of Registration / Commencement of Business (Please specify):

4. Country of Registration:

5. Registered Office/Place of Business:

6. Telephone No; Fax No; E-Mail Address

7. Name of Authorized Contact Person / Designation/ Address/Telephone:

8. Name of Authorized Local Agent /Address/Telephone:

9. Consultant’s Organization:

10. Total number of staff:

11. Number of regular professional staff:

(Provide Company Profile with description of the background and organization of the
Consultant and, if applicable, for each joint venture partner for this assignment.)
Standard EOI Document

3. Experience

3(A). General Work Experience


(Details of assignments undertaken. Each consultant or member of a JV must fill
in this form.)

S. Name of Location Value of Year Client Description of work carried


N. assignment out
Contract Completed

1.

2.

3.

4.

5.

6.

7.
Standard EOI Document

3(B). Specific Experience

Details of similar assignments undertaken in the previous seven years


(In case of joint venture of two or more firms to be filled separately for each
constituent member)

Assignment name: Approx. value of the contract (in current NRs;


US$ or Euro)2:

Country: Duration of assignment (months):

Location within country:

Name of Client: Total No. of person-months of the assignment:

Address: Approx. value of the services provided by your


firm under the contract (in current NRs; US$ or
Euro):

Start date (month/year): No. of professional person-months provided by


the joint venture partners or the Sub-
Completion date (month/year): Consultants:

Name of joint venture partner or Narrative description of Project:


sub-Consultants, if any:

Description of actual services provided in the assignment:

Note: Provide highlight on similar services provided by the consultant as


required by the EOI assignment.

Firm’s Name:

2
Consultant should state value in the currency as mentioned in the contract
Standard EOI Document

3(C). Geographic Experience

Experience of working in similar geographic region or country


(In case of joint venture of two or more firms to be filled separately for each
constituent member)

No Location Execution Year


Name of the Project (Country/ Region) and Duration

1.

2.

3.

4.

5.

6.

7.
Standard EOI Document

4. Capacity
4(A). Financial Capacity
(In case of joint venture of two or more firms to be filled separately for each constituent
member)

Annual Turnover

Year Amount Currency

- Average Annual Turnover

(Note: Supporting documents for Average Turnover should be submitted for the above.)
Standard EOI Document

4(B). Infrastructure/equipment related to the proposed assignment3


No Infrastructure/equipment Requirements Description
Required

1.

2.

3.

4.

5.

3 Delete this table if infrastructure/equipment for the proposed assignment is not required.
Standard EOI Document

5. Key Experts (Include details of Key Experts only)

(In case of joint venture of two or more firms to be filled separately for each
constituent member)
Specific
Highest Work Experience Work
SN Name Position Nationality
Qualification (in year) Experience
(in year)
1

(Please insert more rows as necessary)


Government of Nepal

Ministry of Energy
Department of Electricity Development

Budhi Ganga Hydropower Project


Kathmandu

Expression of Interest (EoI)


For

Procurement of Consulting Services


for
Owner’s Engineer for Construction of
Budhi Ganga Hydropower Project (20 MW)
(For International Consulting Services)

Issued on: 26 February 2021


Identification no: BHP/CS/ICB-1-2077/78

Financing Agency: Government of Nepal,


Saudi Development Fund (SFD), and
Kuwait Fund for Arab Economic Development (KFAED)
EOI Document for Consulting Services for Owner's Engineer

Contents

A. Request for Expression of Interest .................................................................. 3


B. Instructions for submission of Expression of Interest ................................... 4
C. Objective of Consultancy Services or Brief TOR ............................................ 5
D. Evaluation of Consultant’s EOI Application .................................................... 7
E. EOI Forms & Formats ...................................................................................... 15
1. Letter of Application ........................................................................................... 15
2. Applicant’s Information Form ............................................................................ 17
3. Experience ......................................................................................................... 18
4. Capacity ............................................................................................................ 21
5. Key Experts (Include details of Key Experts only) ............................................. 23

2|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

A. Request for Expression of Interest

Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Electricity Development
Budhi Ganga Hydropower Project

Date: February 26, 2021

Name of Consulting Service: Consulting Services for Owner’s Engineer for


Construction of Budhi Ganga Hydropower Project
Name of the Donor Agency: Saudi Development Fund (SFD) and Kuwait Fund for
Arab Economic Development (KFAED)
Donor Loan No: 6/614 (SFD) and 868 (KFAED)

1. Government of Nepal (GoN) has received a loan from Saudi Development Fund, and
Kuwait Fund for Arab Economic Development toward the cost of Budhi Ganga
Hydropower Project and intends to apply a portion of the SFD loan to eligible payments
under the Contract for which this Expression of Interest is invited for International
consulting service.
2. The Budhi Ganga Hydropower Project, Department of Electricity Development now invites
Expression of Interest (EOI) from eligible consulting firms (“consultant”) from all eligible
countries to provide the following consulting services: Owner’s Engineer for construction
of Budhiganga hydropower Project.
3. Interested eligible consultants may obtain further information and EOI document free of
cost at the address Budhi Ganga Hydropower Project, Department of Electricity
Development (DOED) Building 4th floor, Sano Gaucharan, Kathmandu during office
hours on or before 11.59 am on 30 March 2021 or visit e-GP system
www.bolpatra.gov.np/egp or visit the client’s website https://www.bhp.gov.np
4. Consultants may associate with other consultants to enhance their qualifications as
member/s of Joint Venture (JV). The number of consulting firms in a JV should not exceed three
including the lead firm. One consulting firm shall not associate with more than one JV firm.
5. Expressions of interest shall be delivered online through e-GP system
www.bolpatra.gov.np/egp on or before 11.59 am on 30 March 2021.
6. In case the last date of obtaining and submission of the EOI documents happens to be a
holiday, the next working day will be deemed as the due date but the time will be the same
as stipulated.
7. EOI will be assessed based on Qualification 30 percent, Experience (including
domestic preference) 60 percent, and Capacity 10 percent of consulting firm and key
personnel. Based on evaluation of EOI, only shortlisted firms will be invited to submit
technical and financial proposal through a request for proposal.
8. Top six ranked consulting Firms scoring minimum 60 Marks out of total 100 marks and
fulfilling specified minimum requirements for each evaluation criteria and sub criteria
shall be shortlisted.

3|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

B. Instructions for submission of Expression of Interest


1. Expression of Interest may be submitted by a sole firm or a joint venture of consulting
firms.
2. Interested consultants must provide information indicating that they are qualified to
perform the services (descriptions, organization and employee and of the firm or company,
description of assignments of similar nature completed in the last 7 years and their
location, experience in similar conditions, general qualifications and the key personnel to
be involved in the proposed assignment).
3. This expression of interest is open to all eligible consulting firm, company,
organization.
4. The assignment has been scheduled for a period of July 2021 to Dec 2024. Expected
date of commencement of the assignment is July 2021.
5. A Consultant will be selected in accordance with the Quality and Cost Based Selection
method.
6. Expression of Interest should contain following information:
(i) A covering letter addressed to the representative of the client on the official letter head
of company duly signed by authorized signatory.
(ii) Applicants shall provide the following information in the respective formats given in the
EOI document:
 EOI Form: Letter of Application (Form 1)
 EOI Form: Applicant’s Information (Form 2)
 EOI Form: Work Experience Details (Form 3(A), 3(B) & 3(C))
 EOI Form: Capacity Details (Form 4)
 EOI Form: Key Experts List (form 5).

7. Applicants may submit additional information with their application but shortlisting will be
based on the evaluation of information requested and included in the formats provided
in the EOI document.
8. The Expression of Interest (EOI) document must be duly completed and submitted
through e-GP system by using the forms and instructions provided by the system.
9. The completed EOI document must be submitted on or before the date and address
mentioned in the “Request for Expression of Interest”. In case the submission falls on
public holiday the submission can be made on the next working day. Any EOI Document
received after the closing time for submission of proposals shall not be considered for
evaluation

4|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

C. Objective of consultancy services or brief TOR


BACKGROUND
Budhi Ganga Hydropower Project (BHP) aims at contributing to the social and economic
development of Nepal through increasing electricity generation capacity of the country which
will help to supply the electricity for load demand by developing the Project. The Government
of Nepal (GoN) has received the loan from the Kuwait Fund for Arab Economic Development
(KFAED) and Saudi Fund for Development (SFD) for the development of Budhi Ganga
Hydropower Project, 20 MW, in Achham district of Sudur Pashchim Province and to construct
about 81.7 km, 132 kV transmission line to evacuate the power from the project. In this regard,
the BHP intends to apply part of the proceeds of this funding to payments under the contract
for consulting services as Owner’s Engineer for Construction of Budhi Ganga Hydropower
Project.
The construction works of the project under the consulting service will be undertaken in three
(3) contract packages as follows:
i. Lot 1: Civil and Hydro-mechanical Works (Dam, Headworks including Intake and
Settling basin, Headrace Tunnel, Surge Tank, Penstock, Power House, Hydro-
mechanical works etc.)
ii. Lot 2: Electromechanical works
iii. Lot 3: Transmission Line and substation works
The type of contracts for construction works for Lot 1 will be executed according FIDIC
Conditions of Contract for EPC/turnkey Project (Silver Book) and Lot 2 and Lot 3 will be
executed according to FIDIC Conditions of Contract for Plant and Design Built Project (Yellow
book).
Thus, for successful execution of these contracts, BHP is seeking to engage a competent and
experienced consulting firm to work as the Owner's Engineer (also referred to as the ‘the
Consultant’). The firm should have adequate international experience in detailed design,
monitoring and supervision, project management and co-ordination of contractor(s) in
hydropower projects.

OBJECTIVE OF CONSULTING SERVICE


The Objectives of the Consulting Services shall include ensuring proper execution of Project’s
Construction Works with high standard workmanship and materials with in the schedule and
budget, in accordance with the specifications and acceptable quality as mentioned in the
Contracts, to acceptable environmental standards and in accordance with the Employer's
requirements.
SCOPE OF SERVICES
The Consultant shall be responsible for supporting the Budhi Ganga Hydropower Project for
project management and construction supervision including project administration,
contracting, management control, review and approval of design and drawings, procurement
of equipment, materials control, inspection of equipment prior to delivery, shipment,
transportation, control of schedule and quality, pre-commissioning and completion,
performance-guarantee testing of the completed facilities, inventorying spare-parts, training
of owner's/plant sub-system operating and maintenance, personnel of the project both during

5|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

construction and operation phase under Budhi Ganga Hydropower project. The Consultant
shall also assist BHP during the defect liability period.
The Consultant shall carry out the supervision of the construction throughout the contract
period under and in close cooperation with the Client's Project Office. The Consultant shall
act as the Employer’s Representative/ Engineer for Contract, carrying out such duties and
assuming such powers and responsibilities as are mentioned in those contracts in the
agreements. Hence, the main scope of the Consulting Services shall but not limited to the
followings:
i. Supports for preconstruction activities
ii. Examination and approval of Contractors’ engineering design for EPC and plant
design build contracts.
iii. Project management and site management
iv. Quality assurance of construction works, manufacture and delivery of equipment and
other hydro-mechanical parts
v. Certification of contractors' statements
vi. Management of variations, claims and disputes
vii. Maintenance of Environment, health safety and labour relations
viii. Approval of “as-built" drawings/construction drawings/working drawings.
ix. Commissioning of the works
x. Post –construction services/ supervision during the defect liability period
xi. Issuance of plant takeover and final acceptance certificate
xii. Training, Capacity Building and Technology Transfer,

CONSULTANT'S STAFF
To provide the consulting services for the duration of the Project, the Consultant shall ensure
a team of engineers and other specialists, experienced in the detail designing and supervision
of construction of the Project.
Emphasis is placed on the need for relevant contractors’ design check and management of
site in EPC and Design and build contracts. In particular, the Engineers concerned with the
design review and construction supervision of the civil works, Hydro-mechanical works and
electro mechanical, transmission and substation works shall have previous experience in this
type of construction. It is particularly important that the Team Leader and deputy team leader
shall have substantial previous experience in dealing with contractual matters and contract
claims under Conditions of Contract for Projects ,FIDIC (Silver and Yellow book).
Responsibility for management of all services as per the Contract shall be with the
Consultant's Team Leader. The Team Leader shall provide overall technical direction and
coordination of the Services. The Consultant's Team Leader shall also manage and
coordinate the assignment of pool of experts that may be required from time to time, with prior

6|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

approval of the Client. The Team Leader may delegate its responsibilities to the Deputy Team
Leader time to time for the period of his / her absence in the project duty. Delegation of
responsibility, however, shall not free the Team Leader from his/ her accountability to the
decisions/ actions made by the Deputy Team Leader during that periods.
The list of experts required for the Consulting Services is as per below:

a. International Key Experts: Estimated Input: 45 Person- months

i. Hydropower Engineer / Design Engineer (Team Leader) (TL)


ii. Geotechnical/Tunnel Engineer
iii. Contract Engineer/ Procurement Expert
iv. Electromechanical Engineer
v. Electrical Engineer (Electrical System / transmission line)
vi. Pool of Experts
b. National Key Experts: Estimated Input: 152 Person- months

i. Hydropower/Hydraulics Design Engineer (Deputy Team Leader) (DTL)


ii. Structural Engineer
iii. Geotechnical Engineer
iv. Engineering Geologist
v. Electrical System Engineer
vi. Hydro mechanical Engineer
vii. Electromechanical Engineer
viii. Contract Engineer / Procurement Expert
ix. Pool of Expert (Non Key)

In addition, support staffs for office administration and supporting professionals required
during the service shall also be engaged to support the Consultant team.

D. Evaluation of Consultant’s EOI Application

EOI applications which meets the eligibility criteria and minimum requirement will be
shortlisted on the basis of the Ranking Criteria. The criteria for evaluation encompass
qualification, experience, capacity, and domestic preferences (as mentioned in the Section D
of EOI document).
1. Eligibility Criteria:

(i) Eligibility & Completeness Test Compliance


a) Copy of Registration of the company/firm
VAT/PAN Registration (for National consulting firm only)
Tax Clearance/Tax Return Submission of Nepali Fiscal Year
076/77 (for National consulting firm only)
b) In case of a natural person or firm/institution/company which is
already declared blacklisted and ineligible by the GoN or
development partners, any other new or existing
7|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

Firm/Institution/Company owned partially or fully by such


Natural person or Owner or Board of director of blacklisted
Firm/Institution/Company; shall not be eligible applicant.
c) Joint Venture Agreement, if applicable
d) Power of Attorney
EOI Form 1: Letter of Application
EOI Form 2: Applicant’s Information Form
EOI Form 3: Experience (3(A) and 3(B))
EOI Form 4: Capacity
EOI Form 5: Qualification of Key Experts
e) Eligible Countries
i. Applicants shall not at the time of EOI submission or
thereafter be ineligible to submit the proposals ( EOI / RFP)
or subject to boycott under the rules applied by the
Government of Nepal and financing institutions SFD and
KFAED
ii. Applicants shall be excluded if by an act of compliance with
a decision of the United Nations Security Council taken
under Chapter VII of the Charter of the United Nations, the
Borrower’s country prohibits any contracting of services
from that county or any payments to persons or entities in
that country.

2. EOI Evaluation Criteria Full Marks 100

 The Applicants must pass the Eligibility & Completeness Test as stated above
in 1. Eligibility Criteria to be eligible for evaluation.
 The applicants who have scored minimum 60 marks and who secure 1 st to
6th rank in the order of merit based on the evaluation criteria as specified below
shall be shortlisted from EOI.
 The applicant must meet the minimum requirement of each criterion and sub
criterion as specified under the column Minimum Requirement in Table 1, Table
2 and Table 3 below to qualify for ranking. Failures to comply with those Minimum
Requirement will result in the disqualification of the Applicant for further
evaluation.
The maximum overall score that any applicant can obtain is set at 100 Marks and this is
distributed as follows:

Criteria I: Qualification 30 Marks

Criteria II: Experience 52 Marks

Criteria III: Capacity 10 Marks

Criteria IV: Domestic Preferences 8 Marks

Details of Evaluation Criteria under each category are as follows. Figures given in
brackets indicate the maximum score that can be obtained in each category:

8|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

A. Criteria I: Qualification (30 Marks)

Evaluation under this criterion is based on the qualification & experience of key experts
as listed below:

a. International Key Experts:

i. Hydropower Engineer / Design Engineer (Team Leader) (TL)


ii. Geotechnical/Tunnel Engineer
iii. Contract Engineer/ Procurement Expert
iv. Electromechanical Engineer
v. Electrical Engineer (Electrical System/ transmission line)
b. National Key Experts:

i. Hydropower/Hydraulics Design Engineer (Deputy Team Leader) (DTL)


ii. Structural Engineer
iii. Geotechnical Engineer
iv. Engineering Geologist
v. Electrical System Engineer
vi. Hydro mechanical Engineer
vii. Electromechanical Engineer
viii. Contract Engineer / Procurement Expert
The followings are the further breakdown of this particular criteria:

Table 1: Qualification Criteria

Score
Minimum
S. No. Criteria
Requirement [Out of 100
Marks]
A Criteria I: Qualification 30 Marks
Maximum Ten (10)
Qualification of Key Experts marks
I. Team Leader (TL) & Deputy Team Maximum Two point
Master’s Degree
Leader (DTL) (Marks shall be equally three Marks (2.3)
in related Field
distributed between TL & DTL) Marks (2*1.15)
a. Master’s Degree/ Post Graduate
Diploma or above in related 100%
Field
A1 II. Other International and National
Bachelor’s Maximum seven
Experts (Marks shall be equally
Degree in point seven (7.7)
distributed among the key Experts
related Field Marks (11*0.7)
other than TL and DTL)
a. Master’s Degree/ Post Graduate
Diploma or above in related 100%
Field
b. Bachelor’s Degree in related
60%
Field

9|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

Maximum Twenty
Experience of Key Experts (20) Marks
I. General Experience in Engineering Maximum Ten (10)
Field Marks
20 years
Including 5 (five)
years
i. Team Leader international Maximum one point
experience in three Marks (1.3)
other than
expert’s home
country.
a. More than 25 years 100%
b. 20 years to 25 years 60%
20 years Maximum one
ii. Deputy Team Leader
Marks (1.0) Marks

c. More than 25 years 100%


d. 20 years to 25 years 60%
15 years
Including 5 (five)
years
iii. Other International Experts (Marks Maximum Two point
international
shall be equally divided among eight (2.8) Marks
experience in
the key experts (4*0.7)
other than
expert’s home
A2 country

a. More than 20 years 100%

b. 15 years to 20 years 60%


iv. Other National Experts (Marks Maximum four point
shall be equally divided among 15 years nine (4.9) Marks
the key experts (7*0.7)
c. More than 20 years 100%
d. 15 years to 20 years 60%
II. Specific professional Experience
of key experts in Water resources
multi-purpose project having at least
a hydropower component or
Hydropower projects. In case of Maximum Ten (10)
Electrical and Electromechanical Marks
Engineers their experiences in any
power project shall also be
considered as specific professional
experience
i. Team Leader & Deputy Team Maximum Two point
Leader (Marks shall be equally 10 years three Marks (2.3)
distributed between TL & DTL) Marks (2*1.15)
a. Equal or more than 10 years 100%
b. 5 years to 10 years 60%
ii. Other experts (Marks shall be Maximum seven
equally divided among the key 5 years point seven (7.7)
experts other than TL and DTL) Marks (11*0.7)

10 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

a. More than 10 years 100%


b. 5 years to 10 years 60%

B. Criteria 2: Experience: (Maximum 52 Marks)


The following is the further breakdown of this particular criterion:
Table 2: Experience Criteria

S. No. Criteria Minimum Score


Requirement [Out of 100
Marks]
B. Criteria 2: Experience: Maximum 52
Marks
B1 General Experience of Consulting Firm 5 years Maximum Ten
(lead firm) (10) Marks
a. 5 to 10 years 60%
b. More than 10 to 20 years 80%
c. More than 20 years 100%
B2 Specific experience of consulting Maximum Thirty
firm within last 7 years seven (37) Marks
(The projects (consulting services or
works) which have been completed
or substantially completed shall only
be considered for evaluation. In case
of JV, cumulative experiences of all
members of JV shall be considered
for evaluation)
i. Detailed Engineering Design or One project Maximum Four (4)
Detailed Project Design of Marks
Hydropower Projects (Installed
capacity>=20MW)
a. One Project 60%
b. Two Projects 80%
c. More than two Projects 100%
ii. Construction design / One project Maximum Twelve
Construction supervision / (12) Marks
construction management / or
similar nature of services in
hydropower projects (installed
capacity>=20MW)
a. One Project 60%
b. Two Projects 80%
c. More than two Projects 100%
iii. Construction design / One project Maximum Eight (8)
Construction supervision / Marks
construction management/
similar nature of services in
Tunnel construction in a single
project (Tunnel Length ≥ 2.3 km)
d. One Project 60%
e. Two Projects 80%
f. More than two Projects 100%
iv. Construction design / One project Maximum Five (5)
Construction supervision / Marks
construction management/ or
similar nature of services in
transmission line Projects
11 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

(Capacity ≥ 132 kV, length of


transmission line ≥41 km )
a. One Project 60%
b. Two Projects 80%
c. More than two Projects 100%
v. Specific international experience One project Maximum Eight (8)
in other than consultant home Marks
country in specific experience
specified above under headings
B2 - i to iv. For this purpose, only
one experience falling under
each heading shall be considered
for evaluation.
d. One 60%
e. Two 80%
f. More than two 100%

B3 Similar Geographical experience of One project Maximum Five (5)


consulting firm: Detailed construction Marks
design / Construction supervision /
construction management/ or similar
nature of services of hydropower
projects (installed capacity >= 20MW)
falling under Hindu Kush Himalayan
Region as defined by ICIMOD
(Integrated Centre for Integrated
Mountain Development.
(The projects (consulting services or
works) which have been completed shall
only be considered for evaluation. In
case of JV, cumulative experience of all
members of JV shall be considered for
evaluation)
a. One project 60%
b. Two projects 80%
c. More than one project including 100%
at least one project in other than
applicant's home country.

C. Criteria 3: Capacity (Maximum 10 Marks)

Table 3: Capacity Criteria

S. No. Criteria Minimum Score


Requirement [Out of 100
Marks]
C Criteria 3 : Capacity Maximum Ten
Average annual turnover (AAT) of best (10) Marks
three years of last five years which shall NRs. 500
be supported by submission of copy(s) of million
financial statement. (In case of JV,
cumulative AAT of all members of JV
shall be considered for evaluation and
lead partner must have at least 40%
ATM )
a. NRs 500 million to 600 million 60%
b. NRs. 600 million to NRs. 800 80%
million
c. More than NRs 800 millions 100%
12 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

D. Criteria 4: DOMESTIC PREFERENCES (8 Marks)

Domestic preferences will be given to the consulting firms from the countries Nepal, Saudi
Arabia and Kuwait.
Table 4: Domestic Preferences
Minimum
S. No. Criteria Score
Requirement
Criteria 4 : Domestic Preferences
D Consulting Firms (Applicant as a single entity or (8) Marks
any one member of a Joint Venture applicant ) -
from countries Nepal, Saudi Arabia and Kuwait )
Notes:
a. In Evaluation of the EOI, the following words and expressions shall have the meaning as
stated below:
1) ."Substantially completed project" means the assignment/work/project (consulting
services or works performed by the applicant satisfying any one of the followings
conditions:
I. that is substantiated by the Client’s certificate as not less than 90% completed, or
II. that is, in case of the hydropower project substantiated by the Client’s certificate
as they are in partial operation with minimum one unit
2) . The term "Applicant" means the consultant or any firms who is submitting application
for Expression of Interest to provide the Consulting Services for Owner’s Engineer for
Construction of Budhi Ganga Hydropower Project (20 MW) as per this document.
3) The terms “detailed construction design" means services provided by the Applicant
(firm) in the detailed designs of construction works during construction period. The
"construction supervision" means services of consultants in supervising construction
activities carried out by other contractors as independent Engineer or Employer's
representative or as a partner of JV in EPC or design & build projects. Similarly,
"construction management" means the services provided by the firms for management
of construction works of the project on behalf of owner or as owner’s engineer or
owner’s representatives.
4) the "Client" means the owner of the project in which the applicant is engaged as
contractor or consulting firms.
b. The information furnished by the Consultant in the EOI document are assumed to be
realist and correct for evaluation purpose unless and otherwise specified in Instruction of
Consultant and Note hereon. The consultant shall, solely be liable to the information
furnished thereof and should furnish supporting proofs if requested by the Client.
c. In case of a joint venture (Joint Venture or JV), the Consultant must submit the joint
venture agreement duly signed by authorized signatories & stamped with company seal
of each member of joint venture in every page of JV agreement & clearly mentioning name
of the lead firm, name of JV partners, role and responsibility of each member, share
percentage, name of the authorized signatories. Similarly, the JV agreement should be
signed by authorized representative having power of attorney to sign the JV agreement.
Failure in submission of JV agreement duly signed by authorized signatories will result in
the disqualification of Applicants for evaluation.
13 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

d. The number of consulting firms in a JV should not exceed three including the lead firm.
One consulting firm shall not associate in more than one applicant.
e. The applicant must submit curricula vitae (CV) of key experts clearly mentioning nationality,
qualifications, general experiences and specific experiences. The general experiences
and specific experiences acquired only after Bachelor’s degree (or equivalent to
Bachelor’s degree) in related field of the professionals shall only be counted for evaluation.
f. The consultant shall not propose alternate experts for any key experts specified in
Evaluation Criteria (Section D). If so proposed, minimum marks secured by proposed
alternate key experts shall be provided to the Applicant.
g. The Consultant shall not propose the same key expert for more than one designation. If
so proposed, he / she shall be excluded from evaluation for any designation and the
Applicant (firm) shall be disqualified
h. Consulting Services or works delivered by the applicant as a consulting firm / member of
JV of consulting firms or as a member of JV in EPC/ Design & Build Contract shall be
considered for evaluation.
i. The specific experience of applicants in rehabilitation / upgrading / maintenance works
shall not be considered for evaluation. Similarly, review of detailed design of hydropower
projects shall not be considered as a specific experience for Detailed Engineering Design
or Detailed Project Design of the Hydropower Projects.
j. The specific experience of applicants in only one component of hydropower projects viz.
1) only Civil component and II) only Electro_ mechanical/ Hydro mechanical component/
Combined Hydro & Electro mechanical component shall not be considered for evaluation
under specific experience in B2(i). Detailed Engineering Design or Detailed Project Design
of Hydropower Projects, B2 (ii). Detailed construction design / Construction supervision /
construction management/ similar nature of services and B3. Similar Geographical
experience of consulting firm.
k. Completion and work experience shall be evidenced by the Client’s certificate with client
reference. Any certificates issued other than said Client shall not be considered for
evaluation.
l. If the references are other than in English languages, then the Applicant shall submit its
English translated copies.
m. In case of Nepalese Rupees, the average annual turnover of the applicants shall be
calculated in Net Present Value applying Overall Inflation indices of Nepal Rastra Bank.
In case of foreign currencies, conversion of foreign currency to Nepalese Rupees shall be
based on the exchange rate of Nepal Rastra Bank as on 28th day before the last
submission date of EOI application. The foreign currencies submitted in the financial
statement must be convertible currencies from Nepal Rastra Bank.
n. In Case, a corruption case is being filed to Court against the Natural Person or Board of
Director of the firm/institution /company or any partner of JV, such Natural Person or Board
of Director of the firm/institution /company or any partner of JV such firm’s or JV EoI shall
be excluded from the evaluation, if public entity receives instruction from Government of
Nepal.

14 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

E. EOI Forms & Formats

Form 1. Letter of Application

Form 2. Applicant’s information

Form 3.Experience (General, Specific and Geographical)

Form 4. Capacity

Form 5. Qualification of Key Experts

1. Letter of Application

(Letterhead paper of the Applicant or partner responsible for a joint venture, including full
postal address, telephone no., fax and email address)

Date:
....................................

To,
Full Name of Client: __________________________
Full Address of Client: ________________________
Telephone No.: ______________________________
Fax No.: ____________________________________
Email Address: _______________________________

Sir/Madam,

1. Being duly authorized to represent and act on behalf of (hereinafter "the Applicant"), and
having reviewed and fully understood all the short-listing information provided, the
undersigned hereby apply to be short-listed by [Insert name of Client) as Consultant for
{Insert brief description of Work/Services}.

2. Attached to this letter are photocopies of original documents defining:

a) the Applicant's legal status;


b) the principal place of business;

3. [Insert name of Client] and its authorized representatives are hereby authorized to verify
the statements, documents, and information submitted in connection with this application.
This Letter of Application will also serve as authorization to any individual or
authorized representative of any institution referred to in the supporting information, to
provide such information deemed necessary and requested by yourselves to verify
statements and information provided in this application, or with regard to the resources,
experience, and competence of the Applicant.

4. [Insert name of Client) and its authorized representatives are authorized to contact

15 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

any of the signatories to this letter for any further information.1

5. All further communication concerning this Application should be addressed to the following
person,

[Person]

[Company]

[Address]

[Phone, Fax, Email]

6. We declare that, we have no conflict of interest in the proposed procurement proceedings


and we have not been punished for an offense relating to the concerned profession or
business and our Company/firm has not been declared ineligible.

7. We further confirm that, if any of our experts is engaged to prepare the TOR for any ensuing
assignment resulting from our work product under this assignment, our firm, JV member or
sub-consultant, and the expert(s) will be disqualified from short-listing and participation in
the assignment.

8. The undersigned declares that the statements made and the information provided in the duly
completed application are complete, true and correct in every detail.

Signed :

Name :

For and on behalf of (name of Applicant or partner of a joint venture):

1
Applications by joint ventures should provide on a separate sheet, relevant information for each party to the
Application.
16 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

2. Applicant’s Information Form


(In case of joint venture of two or more firms to be filled separately for each constituent
member)

1. Name of Firm/Company:

2. Type of Constitution (Partnership/ Pvt. Ltd/Public Ltd/ Public Sector/ NGO)

3. Date of Registration / Commencement of Business (Please specify):

4. Country of Registration:

5. Registered Office/Place of Business:

6. Telephone No; Fax No; E-Mail Address

7. Name of Authorized Contact Person / Designation/ Address/Telephone:

8. Name of Authorized Local Agent /Address/Telephone:

9. Consultant’s Organization:

10. Total number of staff:

11. Number of regular professional staff:

(Provide Company Profile with description of the background and organization of the
Consultant and, if applicable, for each joint venture partner for this assignment.)

17 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

3. Experience
3(A). General Work Experience
(Details of assignments undertaken. Each consultant or member of a JV must fill
in this form.)

S. Name of Location Value of Year Client Description of work carried


N. assignment out
Contract Completed

1.

2.

3.

4.

5.

6.

7.

18 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

3(B). Specific Experience

Details of similar assignments undertaken in the previous seven years


(In case of joint venture of two or more firms to be filled separately for each constituent
member)

Assignment name: Approx. value of the contract (in current NRs;


US$ or Euro)2:

Country: Duration of assignment (months):

Location within country:

Name of Client: Total No. of person-months of the assignment:

Address: Approx. value of the services provided by your


firm under the contract (in current NRs; US$ or
Euro):

Start date (month/year): No. of professional person-months provided by


the joint venture partners or the Sub-
Completion date (month/year): Consultants:

Name of joint venture partner or Narrative description of Project:


sub-Consultants, if any:

Description of actual services provided in the assignment:

Note: Provide highlight on similar services provided by the consultant as


required by the EOI assignment.

Firm’s Name:

2
Consultant should state value in the currency as mentioned in the contract
19 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

3(C). Geographic Experience

Experience of working in similar geographic region or country


(In case of joint venture of two or more firms to be filled separately for each constituent
member)

No Location Execution Year


Name of the Project (Country/ Region) and Duration

1.

2.

3.

4.

5.

6.

7.

20 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

4. Capacity
4(A). Financial Capacity
(In case of joint venture of two or more firms to be filled separately for each constituent
member)

Annual Turnover

Year Amount Currency

- Average Annual Turnover of Best of 3 Fiscal Year


Of Last 7 Fiscal Years

(Note: Supporting documents for Average Turnover should be submitted for the above.)

21 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

4(B). Infrastructure/equipment related to the proposed assignment3


No Infrastructure/equipment Requirements Description
Required

1.

2.

3.

4.

5.

3 Delete this table if infrastructure/equipment for the proposed assignment is not required.
22 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer

5. Key Experts (Include details of Key Experts only)

(In case of joint venture of two or more firms to be filled separately for each constituent
member)
Specific
Basic and
Work Experience Work
SN Name Position Highest Nationality
(in year) Experience*
Qualification
(in year)
1

*Specific work experience shall be Specific professional Experience of key experts in Water
resources multi-purpose project having at least a hydropower component or Hydropower projects. In
case of Electrical, Electromechanical Engineers their experiences in any power project shall also be
considered as specific professional experience.
(Please insert more rows as necessary)

23 | P a g e
Budhi Ganga Hydropower Project