Professional Documents
Culture Documents
(EOI)
Name of Project: Consulting Services for Owner's Engineer for Construction of Budhi Ganga Hydropower Project (20 MW)
1. Government of Nepal (GoN) has received a Loan from Single Envelope Procedure toward the cost of Consulting Services for
Owner's Engineer for Construction of Budhi Ganga Hydropower Project (20 MW) and intends to apply a portion of this
loan/credit/grant to eligible payments under the Contract for which this Expression of Interest is invited for International
consulting service
2. The Budhiganga Hydropower Project now invites Expression of Interest (EOI) from eligible consulting firms (“consultant”) to
provide the following consulting services: Procurement of Consulting Services for Owner's Engineer for Construction of Budhi
Ganga Hydropower Project (20 MW)
3. Interested eligible consultants may obtain further information and EOI document free of cost at the address Budhiganga
Hydropower Project,Budhiganga Hydropower Project
4th Floor, Department of Electricity Development Building, Naxal, Sano Gaucharan, Kathmandu, Nepal during office hours on
or before 30-03-2021 11:59 or visit e-GP system www.bolpatra.gov.np/egp or visit the client’s website www.bhp.gov.np
4. Consultants may associate with other consultants to enhance their qualifications.
5. Expressions of interest shall be delivered online through e-GP system www.bolpatra.gov.np/egp on or before 30-03-2021 11:59
6. In case the last date of obtaining and submission of the EOI documents happens to be a holiday, the next working day will be
deemed as the due date but the time will be the same as stipulated.
7. EOI will be assessed based on Qualification 30.0 %, Experience 60.0 %, and Capacity 10.0 % of consulting firm and key
personnel. Based on evaluation of EOI, only shortlisted firms will be invited to submit technical and financial proposal through
a request for proposal.
8. Minimum score to pass the EOI is 60
B. Instructions for Submission of Expression of
Instructions for Submission of Expression of Interest
1. Expression of Interest may be submitted by a sole firm or a joint venture of consulting firms.
2. Interested consultants must provide information indicating that they are qualified to perform the services (descriptions,
organization and employee and of the firm or company, description of assignments of similar nature completed in the last 7
years and their location, experience in similar conditions, general qualifications and the key personnel to be involved in the
proposed assignment).
3. This expression of interest is open to all eligible consulting firm.
4. In case, the applicant is individual consultant, details of similar assignment experience, their location in the previous 4 years and
audited balance sheet and bio data shall be considered for evaluation.
5. The assignment has been scheduled for a period of 43 Months. Expected date of commencement of the assignment is 06-06-
2021.
6. A Consultant will be selected in accordance with the QCBS method.
(i) A covering letter addressed to the representative of the client on the official letter head of company duly signed by
authorized signatory.
(ii) Applicants shall provide the following information in the respective formats given in the EOI document:
8. Applicants may submit additional information with their application but shortlisting will be based on the evaluation of
information requested and included in the formats provided in the EOI document.
9. The Expression of Interest (EOI) document must be duly completed and submitted in sealed envelope and should be clearly
marked as “EOI Application for Short-listing for the Consulting Services for Owner's Engineer for Construction of Budhi
Ganga Hydropower Project (20 MW).The Envelope should also clearly indicate the name and address of the Applicant.
Alternatively, applicants can submit their EOI application through e-GP system by using the forms and instructions provided by
the system.
10. The completed EOI document must be submitted on or before the date and address mentioned in the “Request for Expression of
Interest”. In case the submission falls on public holiday the submission can be made on the next working day. Any EOI
Document received after the closing time for submission of proposals shall not be considered for evaluation.
C. Objective of Consultancy Services or Brief TOR
OBJECTIVE OF CONSULTANCY SERVICES OR BRIEF TOR
Document contained Objective and Brief Tor is attached
D. Evaluation of Consultant’s EOI Application
Evaluation of Consultant’s EOI Application
Consultant’s EOI application which meets the eligibility criteria will be ranked on the basis of the Ranking Criteria.
1 Corporate Registration
3 VAT/PAN Registration
1 Qualification of Key Experts Detail criteria is attached. Please follow signed document
2 Experience of Key Experts Detail criteria is attached. Please follow signed document
Score: 30.0
B. Experience
1 General Experience of consulting firm Detail criteria is attached. Please follow signed document
Specific experience of consulting firm within last 7 years.
2 In case of person, specific experience of the person within Detail criteria is attached. Please follow signed document
last 4 years.
3 Similar Geographical experience of consulting firm Detail criteria is attached. Please follow signed document
Score: 60.0
C. Capacity
Score: 10.0
Form 4. Capacity
1. Letter of Application
(Letterhead paper of the Applicant or partner responsible for a joint venture, including full
postal address, telephone no., fax and email address)
Date: ..........................
To,
Full Name of Client: __________________________
Full Address of Client: ________________________
Telephone No.: ______________________________
Fax No.: ____________________________________
Email Address: _______________________________
Sir/Madam,
1. Being duly authorized to represent and act on behalf of (hereinafter "the Applicant"), and
having reviewed and fully understood all the short-listing information provided, the
undersigned hereby apply to be short-listed by [Insert name of Client) as Consultant for
{Insert brief description of Work/Services}.
3. [Insert name of Client] and its authorized representatives are hereby authorized to verify
the statements, documents, and information submitted in connection with this application.
This Letter of Application will also serve as authorization to any individual or
authorized representative of any institution referred to in the supporting information, to
provide such information deemed necessary and requested by yourselves to verify
statements and information provided in this application, or with regard to the resources,
experience, and competence of the Applicant.
4. [Insert name of Client) and its authorized representatives are authorized to contact
any of the signatories to this letter for any further information.1
5. All further communication concerning this Application should be addressed to the following
person,
[Person]
[Company]
[Address]
1
Applications by joint ventures should provide on a separate sheet, relevant information for each party to the
Application.
Standard EOI Document
7. We further confirm that, if any of our experts is engaged to prepare the TOR for any ensuing
assignment resulting from our work product under this assignment, our firm, JV member or
sub-consultant, and the expert(s) will be disqualified from short-listing and participation in
the assignment.
8. The undersigned declares that the statements made and the information provided in the duly
completed application are complete, true and correct in every detail.
Signed :
Name :
1. Name of Firm/Company:
4. Country of Registration:
9. Consultant’s Organization:
(Provide Company Profile with description of the background and organization of the
Consultant and, if applicable, for each joint venture partner for this assignment.)
Standard EOI Document
3. Experience
1.
2.
3.
4.
5.
6.
7.
Standard EOI Document
Firm’s Name:
2
Consultant should state value in the currency as mentioned in the contract
Standard EOI Document
1.
2.
3.
4.
5.
6.
7.
Standard EOI Document
4. Capacity
4(A). Financial Capacity
(In case of joint venture of two or more firms to be filled separately for each constituent
member)
Annual Turnover
(Note: Supporting documents for Average Turnover should be submitted for the above.)
Standard EOI Document
1.
2.
3.
4.
5.
3 Delete this table if infrastructure/equipment for the proposed assignment is not required.
Standard EOI Document
(In case of joint venture of two or more firms to be filled separately for each
constituent member)
Specific
Highest Work Experience Work
SN Name Position Nationality
Qualification (in year) Experience
(in year)
1
Ministry of Energy
Department of Electricity Development
Contents
2|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Electricity Development
Budhi Ganga Hydropower Project
1. Government of Nepal (GoN) has received a loan from Saudi Development Fund, and
Kuwait Fund for Arab Economic Development toward the cost of Budhi Ganga
Hydropower Project and intends to apply a portion of the SFD loan to eligible payments
under the Contract for which this Expression of Interest is invited for International
consulting service.
2. The Budhi Ganga Hydropower Project, Department of Electricity Development now invites
Expression of Interest (EOI) from eligible consulting firms (“consultant”) from all eligible
countries to provide the following consulting services: Owner’s Engineer for construction
of Budhiganga hydropower Project.
3. Interested eligible consultants may obtain further information and EOI document free of
cost at the address Budhi Ganga Hydropower Project, Department of Electricity
Development (DOED) Building 4th floor, Sano Gaucharan, Kathmandu during office
hours on or before 11.59 am on 30 March 2021 or visit e-GP system
www.bolpatra.gov.np/egp or visit the client’s website https://www.bhp.gov.np
4. Consultants may associate with other consultants to enhance their qualifications as
member/s of Joint Venture (JV). The number of consulting firms in a JV should not exceed three
including the lead firm. One consulting firm shall not associate with more than one JV firm.
5. Expressions of interest shall be delivered online through e-GP system
www.bolpatra.gov.np/egp on or before 11.59 am on 30 March 2021.
6. In case the last date of obtaining and submission of the EOI documents happens to be a
holiday, the next working day will be deemed as the due date but the time will be the same
as stipulated.
7. EOI will be assessed based on Qualification 30 percent, Experience (including
domestic preference) 60 percent, and Capacity 10 percent of consulting firm and key
personnel. Based on evaluation of EOI, only shortlisted firms will be invited to submit
technical and financial proposal through a request for proposal.
8. Top six ranked consulting Firms scoring minimum 60 Marks out of total 100 marks and
fulfilling specified minimum requirements for each evaluation criteria and sub criteria
shall be shortlisted.
3|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
7. Applicants may submit additional information with their application but shortlisting will be
based on the evaluation of information requested and included in the formats provided
in the EOI document.
8. The Expression of Interest (EOI) document must be duly completed and submitted
through e-GP system by using the forms and instructions provided by the system.
9. The completed EOI document must be submitted on or before the date and address
mentioned in the “Request for Expression of Interest”. In case the submission falls on
public holiday the submission can be made on the next working day. Any EOI Document
received after the closing time for submission of proposals shall not be considered for
evaluation
4|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
5|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
construction and operation phase under Budhi Ganga Hydropower project. The Consultant
shall also assist BHP during the defect liability period.
The Consultant shall carry out the supervision of the construction throughout the contract
period under and in close cooperation with the Client's Project Office. The Consultant shall
act as the Employer’s Representative/ Engineer for Contract, carrying out such duties and
assuming such powers and responsibilities as are mentioned in those contracts in the
agreements. Hence, the main scope of the Consulting Services shall but not limited to the
followings:
i. Supports for preconstruction activities
ii. Examination and approval of Contractors’ engineering design for EPC and plant
design build contracts.
iii. Project management and site management
iv. Quality assurance of construction works, manufacture and delivery of equipment and
other hydro-mechanical parts
v. Certification of contractors' statements
vi. Management of variations, claims and disputes
vii. Maintenance of Environment, health safety and labour relations
viii. Approval of “as-built" drawings/construction drawings/working drawings.
ix. Commissioning of the works
x. Post –construction services/ supervision during the defect liability period
xi. Issuance of plant takeover and final acceptance certificate
xii. Training, Capacity Building and Technology Transfer,
CONSULTANT'S STAFF
To provide the consulting services for the duration of the Project, the Consultant shall ensure
a team of engineers and other specialists, experienced in the detail designing and supervision
of construction of the Project.
Emphasis is placed on the need for relevant contractors’ design check and management of
site in EPC and Design and build contracts. In particular, the Engineers concerned with the
design review and construction supervision of the civil works, Hydro-mechanical works and
electro mechanical, transmission and substation works shall have previous experience in this
type of construction. It is particularly important that the Team Leader and deputy team leader
shall have substantial previous experience in dealing with contractual matters and contract
claims under Conditions of Contract for Projects ,FIDIC (Silver and Yellow book).
Responsibility for management of all services as per the Contract shall be with the
Consultant's Team Leader. The Team Leader shall provide overall technical direction and
coordination of the Services. The Consultant's Team Leader shall also manage and
coordinate the assignment of pool of experts that may be required from time to time, with prior
6|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
approval of the Client. The Team Leader may delegate its responsibilities to the Deputy Team
Leader time to time for the period of his / her absence in the project duty. Delegation of
responsibility, however, shall not free the Team Leader from his/ her accountability to the
decisions/ actions made by the Deputy Team Leader during that periods.
The list of experts required for the Consulting Services is as per below:
In addition, support staffs for office administration and supporting professionals required
during the service shall also be engaged to support the Consultant team.
EOI applications which meets the eligibility criteria and minimum requirement will be
shortlisted on the basis of the Ranking Criteria. The criteria for evaluation encompass
qualification, experience, capacity, and domestic preferences (as mentioned in the Section D
of EOI document).
1. Eligibility Criteria:
The Applicants must pass the Eligibility & Completeness Test as stated above
in 1. Eligibility Criteria to be eligible for evaluation.
The applicants who have scored minimum 60 marks and who secure 1 st to
6th rank in the order of merit based on the evaluation criteria as specified below
shall be shortlisted from EOI.
The applicant must meet the minimum requirement of each criterion and sub
criterion as specified under the column Minimum Requirement in Table 1, Table
2 and Table 3 below to qualify for ranking. Failures to comply with those Minimum
Requirement will result in the disqualification of the Applicant for further
evaluation.
The maximum overall score that any applicant can obtain is set at 100 Marks and this is
distributed as follows:
Details of Evaluation Criteria under each category are as follows. Figures given in
brackets indicate the maximum score that can be obtained in each category:
8|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
Evaluation under this criterion is based on the qualification & experience of key experts
as listed below:
Score
Minimum
S. No. Criteria
Requirement [Out of 100
Marks]
A Criteria I: Qualification 30 Marks
Maximum Ten (10)
Qualification of Key Experts marks
I. Team Leader (TL) & Deputy Team Maximum Two point
Master’s Degree
Leader (DTL) (Marks shall be equally three Marks (2.3)
in related Field
distributed between TL & DTL) Marks (2*1.15)
a. Master’s Degree/ Post Graduate
Diploma or above in related 100%
Field
A1 II. Other International and National
Bachelor’s Maximum seven
Experts (Marks shall be equally
Degree in point seven (7.7)
distributed among the key Experts
related Field Marks (11*0.7)
other than TL and DTL)
a. Master’s Degree/ Post Graduate
Diploma or above in related 100%
Field
b. Bachelor’s Degree in related
60%
Field
9|P ag e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
Maximum Twenty
Experience of Key Experts (20) Marks
I. General Experience in Engineering Maximum Ten (10)
Field Marks
20 years
Including 5 (five)
years
i. Team Leader international Maximum one point
experience in three Marks (1.3)
other than
expert’s home
country.
a. More than 25 years 100%
b. 20 years to 25 years 60%
20 years Maximum one
ii. Deputy Team Leader
Marks (1.0) Marks
10 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
Domestic preferences will be given to the consulting firms from the countries Nepal, Saudi
Arabia and Kuwait.
Table 4: Domestic Preferences
Minimum
S. No. Criteria Score
Requirement
Criteria 4 : Domestic Preferences
D Consulting Firms (Applicant as a single entity or (8) Marks
any one member of a Joint Venture applicant ) -
from countries Nepal, Saudi Arabia and Kuwait )
Notes:
a. In Evaluation of the EOI, the following words and expressions shall have the meaning as
stated below:
1) ."Substantially completed project" means the assignment/work/project (consulting
services or works performed by the applicant satisfying any one of the followings
conditions:
I. that is substantiated by the Client’s certificate as not less than 90% completed, or
II. that is, in case of the hydropower project substantiated by the Client’s certificate
as they are in partial operation with minimum one unit
2) . The term "Applicant" means the consultant or any firms who is submitting application
for Expression of Interest to provide the Consulting Services for Owner’s Engineer for
Construction of Budhi Ganga Hydropower Project (20 MW) as per this document.
3) The terms “detailed construction design" means services provided by the Applicant
(firm) in the detailed designs of construction works during construction period. The
"construction supervision" means services of consultants in supervising construction
activities carried out by other contractors as independent Engineer or Employer's
representative or as a partner of JV in EPC or design & build projects. Similarly,
"construction management" means the services provided by the firms for management
of construction works of the project on behalf of owner or as owner’s engineer or
owner’s representatives.
4) the "Client" means the owner of the project in which the applicant is engaged as
contractor or consulting firms.
b. The information furnished by the Consultant in the EOI document are assumed to be
realist and correct for evaluation purpose unless and otherwise specified in Instruction of
Consultant and Note hereon. The consultant shall, solely be liable to the information
furnished thereof and should furnish supporting proofs if requested by the Client.
c. In case of a joint venture (Joint Venture or JV), the Consultant must submit the joint
venture agreement duly signed by authorized signatories & stamped with company seal
of each member of joint venture in every page of JV agreement & clearly mentioning name
of the lead firm, name of JV partners, role and responsibility of each member, share
percentage, name of the authorized signatories. Similarly, the JV agreement should be
signed by authorized representative having power of attorney to sign the JV agreement.
Failure in submission of JV agreement duly signed by authorized signatories will result in
the disqualification of Applicants for evaluation.
13 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
d. The number of consulting firms in a JV should not exceed three including the lead firm.
One consulting firm shall not associate in more than one applicant.
e. The applicant must submit curricula vitae (CV) of key experts clearly mentioning nationality,
qualifications, general experiences and specific experiences. The general experiences
and specific experiences acquired only after Bachelor’s degree (or equivalent to
Bachelor’s degree) in related field of the professionals shall only be counted for evaluation.
f. The consultant shall not propose alternate experts for any key experts specified in
Evaluation Criteria (Section D). If so proposed, minimum marks secured by proposed
alternate key experts shall be provided to the Applicant.
g. The Consultant shall not propose the same key expert for more than one designation. If
so proposed, he / she shall be excluded from evaluation for any designation and the
Applicant (firm) shall be disqualified
h. Consulting Services or works delivered by the applicant as a consulting firm / member of
JV of consulting firms or as a member of JV in EPC/ Design & Build Contract shall be
considered for evaluation.
i. The specific experience of applicants in rehabilitation / upgrading / maintenance works
shall not be considered for evaluation. Similarly, review of detailed design of hydropower
projects shall not be considered as a specific experience for Detailed Engineering Design
or Detailed Project Design of the Hydropower Projects.
j. The specific experience of applicants in only one component of hydropower projects viz.
1) only Civil component and II) only Electro_ mechanical/ Hydro mechanical component/
Combined Hydro & Electro mechanical component shall not be considered for evaluation
under specific experience in B2(i). Detailed Engineering Design or Detailed Project Design
of Hydropower Projects, B2 (ii). Detailed construction design / Construction supervision /
construction management/ similar nature of services and B3. Similar Geographical
experience of consulting firm.
k. Completion and work experience shall be evidenced by the Client’s certificate with client
reference. Any certificates issued other than said Client shall not be considered for
evaluation.
l. If the references are other than in English languages, then the Applicant shall submit its
English translated copies.
m. In case of Nepalese Rupees, the average annual turnover of the applicants shall be
calculated in Net Present Value applying Overall Inflation indices of Nepal Rastra Bank.
In case of foreign currencies, conversion of foreign currency to Nepalese Rupees shall be
based on the exchange rate of Nepal Rastra Bank as on 28th day before the last
submission date of EOI application. The foreign currencies submitted in the financial
statement must be convertible currencies from Nepal Rastra Bank.
n. In Case, a corruption case is being filed to Court against the Natural Person or Board of
Director of the firm/institution /company or any partner of JV, such Natural Person or Board
of Director of the firm/institution /company or any partner of JV such firm’s or JV EoI shall
be excluded from the evaluation, if public entity receives instruction from Government of
Nepal.
14 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
Form 4. Capacity
1. Letter of Application
(Letterhead paper of the Applicant or partner responsible for a joint venture, including full
postal address, telephone no., fax and email address)
Date:
....................................
To,
Full Name of Client: __________________________
Full Address of Client: ________________________
Telephone No.: ______________________________
Fax No.: ____________________________________
Email Address: _______________________________
Sir/Madam,
1. Being duly authorized to represent and act on behalf of (hereinafter "the Applicant"), and
having reviewed and fully understood all the short-listing information provided, the
undersigned hereby apply to be short-listed by [Insert name of Client) as Consultant for
{Insert brief description of Work/Services}.
3. [Insert name of Client] and its authorized representatives are hereby authorized to verify
the statements, documents, and information submitted in connection with this application.
This Letter of Application will also serve as authorization to any individual or
authorized representative of any institution referred to in the supporting information, to
provide such information deemed necessary and requested by yourselves to verify
statements and information provided in this application, or with regard to the resources,
experience, and competence of the Applicant.
4. [Insert name of Client) and its authorized representatives are authorized to contact
15 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
5. All further communication concerning this Application should be addressed to the following
person,
[Person]
[Company]
[Address]
7. We further confirm that, if any of our experts is engaged to prepare the TOR for any ensuing
assignment resulting from our work product under this assignment, our firm, JV member or
sub-consultant, and the expert(s) will be disqualified from short-listing and participation in
the assignment.
8. The undersigned declares that the statements made and the information provided in the duly
completed application are complete, true and correct in every detail.
Signed :
Name :
1
Applications by joint ventures should provide on a separate sheet, relevant information for each party to the
Application.
16 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
1. Name of Firm/Company:
4. Country of Registration:
9. Consultant’s Organization:
(Provide Company Profile with description of the background and organization of the
Consultant and, if applicable, for each joint venture partner for this assignment.)
17 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
3. Experience
3(A). General Work Experience
(Details of assignments undertaken. Each consultant or member of a JV must fill
in this form.)
1.
2.
3.
4.
5.
6.
7.
18 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
Firm’s Name:
2
Consultant should state value in the currency as mentioned in the contract
19 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
1.
2.
3.
4.
5.
6.
7.
20 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
4. Capacity
4(A). Financial Capacity
(In case of joint venture of two or more firms to be filled separately for each constituent
member)
Annual Turnover
(Note: Supporting documents for Average Turnover should be submitted for the above.)
21 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
1.
2.
3.
4.
5.
3 Delete this table if infrastructure/equipment for the proposed assignment is not required.
22 | P a g e
Budhi Ganga Hydropower Project
EOI Document for Consulting Services for Owner's Engineer
(In case of joint venture of two or more firms to be filled separately for each constituent
member)
Specific
Basic and
Work Experience Work
SN Name Position Highest Nationality
(in year) Experience*
Qualification
(in year)
1
*Specific work experience shall be Specific professional Experience of key experts in Water
resources multi-purpose project having at least a hydropower component or Hydropower projects. In
case of Electrical, Electromechanical Engineers their experiences in any power project shall also be
considered as specific professional experience.
(Please insert more rows as necessary)
23 | P a g e
Budhi Ganga Hydropower Project