Professional Documents
Culture Documents
Cab Overview
CAN-BUS (J-1939)
Display
IFM PDM360
320x240 Pixel E/A-Extension Dashboard E/A-Extension
Main controller
CR9014 Dashboard control Cab
CR0020
CR2012 CR0301
CR2012
Node 26 Node 25 Node 29 Node 0/30
CAN-BUS (CANopen)
2
NEW OPERATING CONCEPT
System structure MHL320D , MHL380D – State 01-2008 - other MHL3xxD in 2008
Speed sensor
Hydraulic pump
EMR 3 RC-2-2
CAN-BUS (J-1939)
Display
IFM PDM360
320x240 Pixel Cab floor Main controller
control
CR9014 CR0020
CR0303
CAN-BUS (CANopen)
Slip ring
Node 3 Node 4 Node 1
3
NEW OPERATING CONCEPT
Interior
4
NEW OPERATING CONCEPT
Control panel
( CPL )
Multifunctional button
( MFB )
5
NEW OPERATING CONCEPT
MFB
New joysticks
Horn Option
Magnet Option
Pressure boost
Swing brake or
deadman button
8
NEW OPERATING CONCEPT
Integral Parts
The previously used instrument boxes with mechanical
switches, potentiometers, light indicators, and a speed-
regulating lever for the diesel engine are being scaled down
with 3 all-purpose main components:
9
NEW OPERATING CONCEPT
Multifunctional display
Multifunctional display
(color display)
Æ Adjustable according to field of vision and to
avoid glare
10
NEW OPERATING CONCEPT
11
NEW OPERATING CONCEPT
F1 F2 F3 F4 F5 F6
12
NEW OPERATING CONCEPT
Parking brake
Swing interlock
Oscillating axle release
Hydraulics ON and emergency bridging
Reserve1
Bridging of close proximity range limiter for the
stick
Hazard flasher
Parking light ON
Reserve2
Reserve3
Reserve4
Reserve5
13
NEW OPERATING CONCEPT
+
Y
- +
X X
Features:
-Continuous knob (encoder) -Y
-Button
-X-Y cursor control
14
NEW OPERATING CONCEPT
16
NEW OPERATING CONCEPT
Measurements to improve the system consistence and to simplify the system design
- Serviceability improved
All components of the main-electric are easy to achieve
17
NEW OPERATING CONCEPT
18
CR0303 Cab floor control
over adapter MHF001017A
with serial data cable MHF001013A
Deutz EMR
Port for Serdia Interface
MHF001019A
Display
over network cable MHF001015A
without function
brake charging
pressure travel cut off Y4
120-150bar
pilot pressure
cut off for
brake charging working hydraulic
pressure switch Y5
S2
service brake
80-110bar Optional
Cr2016 B74 Cr2016 B68
fuse test
4
4
key switch for 0 4 0
1
emergency control
K4 K3 K2 K1
main relay K1
main controler
Deutz EMR Cr0020
engine controler
F
Optional
F
Cr2016 B74
Cr2016 B68
®
05 / 2008
Intuitive operation with excellent visibility – your customers will be delighted with the new
design of the operating controls in Terex Fuchs handling machines. Unbeatable features
include:
The new operating controls are available from the following serial numbers:
Terex Deutschland GmbH ● 76669 Bad Schönborn ● Industriestraße 3 ● Telefon 07253.84 0 ● Fax 07253.84 111
www.fuchs-terex.de ● info@fuchs-terex.de
emergency control
A A
B B
switch off
jumper XB8 at jumper XB12 at
X40:36 and X40:38 X40:48 and X40:50
jumper; XB6 at Y42 Release parking brake Y93 Drive forward
X40:2 and X40:4 jumper XB10 at
Y5 Working hydraulics X40:42 and X40:44
K84 Diesel engine starter Relais K14 and K15
off
-S178
Key switch Q25S1R-A1 ( IP65 )
C Kontaktelement_1S -K14 -K15 C
Vervielfältigung, Bekanntgabe an Dritte oder Verwertung seines Inhaltes sind ohne unserer ausdrücklichen Zustimmung verboten.
D D
F F
emergency control on
G G
jumper XB10 at
X40:44 and X40:46 switch on
K84 Diesel engine starter
jumper XB6 at
X40:4 and X40:6 jumper XB8 at
Y5 Working hydraulics jumper XB12
X40:38 and X40:40 removed
H Y42 Release parking brake H
Relais K14 and K15
active
-S178
Key switch Q25S1R-A1 ( IP65 )
Kontaktelement_1S -K14 -K15
Kontaktelement_1S
jumper XB5 at Mikrorelais mit Diode Mikrorelais mit Diode
X40:3 and X40:5 jumper XB7 at jumper XB11
Y4 Driving X40:37 and X40:39 removed
Y6 Stick movement enable
jumper XB9 at
X40:43 and X40:45
Y59 Release slewing brake
I I
Travel
Fahren Y4 Arbeitshydraulik
Working hydraulics
Y5
Ladestiel
Stick in Y6
einfahren Park brake
Parkbremse
Y42
Swing brake
Schwenkbremse
Y59 Motorstart
Engine start up K84
Joystick fahren
Joystick travel Joystick
Joystickfahren
travel
Grenzlastregelung
Load limiting control
How many times between
first occ. and last occ.
First occurance Last occurance
date time date time
day month year hour minute second day month year hour minute second
No connection between
display and main controler
Extension module
Node ID 1 (CR2016)
not available
Cabin floor controler
Node ID 2 (CR0303)
not available
Under carriage controler
Node ID 3 (CR2016)
not available
Extension module
Node ID 4 (CR2016)
not available
Use the arrow buttons F4 / F5 to see more pages with other error logs
Can Error
Is a fuse blown?
(Use the fuse tester on the main fuse
board with ignition switched on)
yes no
Is the new fuse blown again Is the diode (LED) lit or flashing on
each component and in which
colour?
Switch off the ignition and remove the battery master switch, the measure the resistance between CAN high und CAN low
on the affected component!
Switch off the ignition and remove the battery masrter switch, then measure the resistance between CAN high und CAN low on
Connectorboard X31 on the main Fuse circuit board (grey CAN high, blue CAN low)
0
single operated
3
Option
4
CR0020
Quick Connect stabilizer
B35
Display CR9014 (node ID 0) Option
reversal fan Option
B54 F24; 2A
lube system
30: F3; 3A F45; 15A
under carriage
15: F16; 5A F47; 15A
120Ohm
120Ohm
120Ohm
X31
60Ohm
F F F
Seite 1 von 4
Perform the following steps:
Central electric
Disconnect the 4 CAN bus wires, which are connected to the terminal block -X40 port
7, 8, 9 and 10 and check that the cage clamp has not pressed on the insulation. Strip
the insulation (longer as original, about 15 mm) and connect again.
Seite 2 von 4
WRONG
Here, the insulation was clamped.
15 mm
RIGHT
The insulation should be stripped about 15 mm.
Seite 3 von 4
Electrical box in the cabin floor
Disconnect all CAN bus wires, which are connected to the terminal block -X2 port 1,
2, 3, 4, 5, 6, 7, 8, 9 and 10 and check that the cage clamp has not pressed on the
insulation. Strip the insulation (longer as original, about 15 mm) and connect again.
Clear the error logging on display (button RESET) with the Code2 (can be found on
the machine master card) and Deutz error memory. Check both CAN buses (60
Ohm, circuit board central electric).
Seite 4 von 4
R
Steuerungssysteme
ifm electronic gmbh • Teichstraße 4 • 45 127 Essen Technische Änderungen behalten wir uns ohne Ankündigung vor! CR0020 / Seite 5 19.10.2004