SALES ORDER : SPA/ACT/2102/020851/TER

CUSTOMER : Dwi Hidayat


PAGE :

DESTINATION :
PAGE :
PT. INDONESIA COMNETS PLUS
DESTINATION :

Ket Table of contents


v Cohaereo File
v Network Konfigurasi
v FOC Out 1
v Flow Chart
v Asplan PLM
v MAP INDOOR
v Dokumentasi

ASPLAN PELANGGAN

JL KH Hasyim Ashari Gang Kramat RT 03 RW 02 no 39 Kota Tangerang Banten - Kec : Pinang -

Kel : Neroktog/JL KH Hasyim Ashari Gang Kramat RT 03 RW 02 no 39 Kota Tangerang Banten

CLIENT OR CONSULTANT NUMBER

TENDER CONTRACT PEMBANGUNAN LASTMILE PELANGGAN

SCALE : NS STANDARD

ORIGINAL PELAKSANA
ISSUE

Created By

Checked By

Created Date
PT. GERBANG SINERGI PRIMA

SHEET LAST No.OF


No. SHEET SHEET
A4
Stroomnet - Dwi Hidayat Note :
1. Perlu Penanaman Tiang 7 Meter Sebanyak 21 Btg
2. Terindikasi Perijinan Pihak RT/RW Setempat
3. Terindikasi Banyak Ormas dilokasi penarikan
4. Pihak kawasan meminta pemasangan PVC (220 Btg)
atau subduct (350 Meter) untuk penarikan di dalam
kawasan

APPROVED BY : CHECKED BY :
SUBJECT : RUTE STRINGING
SUPERVISOR PEMBANGUNAN PROJECT TEAM LEADER
REGIONAL JAKARTA BANTEN PEMBANGUNAN LASTMILE Drawing By :
TANGGAL :
Luthfi Adam

PT. GERBANG SINERGI PRIMA PT. INDONESIA COMNETS PLUS


Dwi Hidayat
JL KH Hasyim Ashari Gang Kramat RT 03 RW 02 no 39 Kota Tangerang Banten - Kec :
Pinang - Kel : Neroktog/JL KH Hasyim Ashari Gang Kramat RT 03 RW 02 no 39 Kota
Tangerang Banten

Arah tapping

APPROVED BY : CHECKED BY :
SUBJECT : INDOOR
SUPERVISOR PEMBANGUNAN PROJECT TEAM LEADER
REGIONAL JAKARTA BANTEN PEMBANGUNAN LASTMILE Drawing By :
TANGGAL :
Luthfi Adam

PT. GERBANG SINERGI PRIMA PT. INDONESIA COMNETS PLUS


SUMMARY PEMBANGUNAN LASTMILE
No. Pekerjaan Satuan Volume No. Pekerjaan Satuan Volume
1 Survey (Inci,spotting GPS utk FOC) Lot 1 15 ODF Wall Mounted 6 Core Unit
2 Penarikan FOC 24C Meter 700 16 ODF Rack Mounted 12 Core Unit
3 Penarikan FOC 24C Lot 17 ODF Rack Mounted 24 Core Unit
4 Drop Wire Meter 150 18 Splitter 1:8 Unit 1
5 Galian FA Tanah 6C Meter 19 Rack Wall Moun 12U Unit
6 Galian FA Boring Meter 20 Pipa Galvanise 3 / 4" Batang
7 Installasi FOT – MC (POP – CPE) Unit 1 21 Pipa Subduct Meter
8 Fitting Dead End Unit 6 22 Pipa PVC 3 / 4" Batang
9 Fitting Suspantion Unit 12 23 Tiang Besi 7 meter (inci pasang,cat,izin) Unit
10 Joint Box 6 Core Unit 24 Tiang Besi 9 meter (inci pasang,cat,izin) Unit
11 Joint Box 12 Core Unit 25 Tiang Besi 12 meter (inci pasang,cat,izin) Unit
12 Joint Box 24 Core Unit 26 Transportasi Luar Kota utk 2 drum 400KM Lot
13 Joint Box 144 Core Unit 27 Jointing per core Core 4
14 ODF Rack Mounted 6 Core Unit 28 OTDR percore Core 2

APPROVED BY : CHECKED BY :
PROJECT TEAM LEADER SUBJECT : KONFIGURASI NETWORK
SUPERVISOR PEMBANGUNAN PEMBANGUNAN LASTMILE
REGIONAL JAKARTA BANTEN Drawing By :
Luthfi Adam TANGGAL :

PT. INDONESIA COMNETS PLUS


PT. GERBANG SINERGI PRIMA
APPROVED BY : CHECKED BY :
SUBJECT : KONFIGURASI NETWORK
SUPERVISOR PEMBANGUNAN PROJECT TEAM LEADER
REGIONAL JAKARTA BANTEN PEMBANGUNAN LASTMILE Drawing By :
TANGGAL :
Luthfi Adam

PT. GERBANG SINERGI PRIMA


PT. INDONESIA COMNETS PLUS
APPROVED BY : CHECKED BY :
SUBJECT : KONFIGURASI NETWORK
SUPERVISOR PEMBANGUNAN PROJECT TEAM LEADER
REGIONAL JAKARTA BANTEN PEMBANGUNAN LASTMILE Drawing By :
TANGGAL :
Luthfi Adam

PT. GERBANG SINERGI PRIMA


PT. INDONESIA COMNETS PLUS