You are on page 1of 6

SALES ORDER : PA/ACT/2012/2393/TER

PT. KIDECO JAYA AGUNG : Gedung Graha Mitra


CUSTOMER : LT 1, Jl. Jend. Gatot Subroto Kav. 21

PAGE
DESTINATION

PAGE
DESTINATION PT. INDONESIA COMNETS PLUS

Ket Table Of Contents

√ Cohaereo File

√ Network Konfigurasi

√ FOC Out 1

√ Flow Chart

√ Asplan PLM

√ MAP INDOOR

√ Dokumentasi

ASPLAN PELANGGAN
PT. KIDECO JAYA AGUNG : Gedung Graha Mitra LT 1, Jl. Jend. Gatot Subroto Kav. 21

CLIENT OR CONSULTANT NUMBER

TENDER CONTRACT PEMBANGUNAN LASTMILE PELANGGAN

SCALE : NS STANDARD

ORIGINAL ISSUE : PELAKSANA :

CREATED BY : RINI ADETYA WULANDARI

CHECKED BY : RAHMAT FANDI KURNIAWAN

CREATED DATE : 06 Januari 2021 PT. GERBANG SINERGI PRIMA

A4 SHEET
No.
LAST
SHEET
No.OF
SHEET
N

APPROVED BY : CHECKED BY : SUBJECT : RUTE STRINGING

SUPERVISOR PEMBANGUNAN PROJECT TEAM LEADER PEMBANGUNAN LASTMILE


Drawing By : Rini Adetya Wulandari
REGIONAL JAKARTA BANTEN

Rahmat Fandi K

Agnes Pagris Siregar PT. INDONESIA COMNETS PLUS


PT. GERBANG SINERGI PRIMA
PERANGKAT
USER

LANTAI 5

SERVER

Arah indoor melipir


dinding + 100 meter
LANTAI 3
masuk kearah basement

ARAH TAPPING Plan New JB


PLAN NEW
JB

BASEMENT

APPROVED BY : CHECKED BY : SUBJECT : RUTE STRINGING

SUPERVISOR PEMBANGUNAN PROJECT TEAM LEADER PEMBANGUNAN LASTMILE


Drawing By : Rini Adetya Wulandari
REGIONAL JAKARTA BANTEN

Rahmat Fandi K

Agnes Pagris Siregar PT. INDONESIA COMNETS PLUS


PT. GERBANG SINERGI PRIMA
S6.23040 E106.82302 S6.22871 E106.81981

Tapping – NO ID PT. KIDECO JAYA AGUNG : Gedung Graha Mitra LT 1,

Jl. Jend. Gatot Subroto Kav. 21

SUMMARY PEMBANGUNAN LASTMILE


No. Pekerjaan Satuan Volume No. Pekerjaan Satuan Volume
1 Survey (Inci,spotting GPS utk FOC) Lot 1 15 ODF Wall Mounted 6 Core Unit
2 Penarikan FOC Fig. 8 Meter 900 16 ODF Rack Mounted 12 Core Unit
3 Installasi FOT – MC (POP – CPE) Lot 1 17 ODF Rack Mounted 24 Core Unit
4 Penarikan Dropwire Meter 18 ODF Rack Mounted 48 Core Unit
5 Galian FA Rojok Alur Meter 19 Rack Wall Moun 12U Unit
6 Galian FA Boring Meter 20 Pipa Galvanise 3 / 4" Batang
7 Mandhole/Handhole Unit 21 Pipa Subduct Meter
8 Fitting Dead End Unit 6 22 Pipa PVC 3 / 4" Batang 25
9 Fitting Suspantion Unit 19 23 Tiang Besi 7 meter (inci pasang,cat,izin) Unit
10 Instalasi Splitter Unit 24 Tiang Besi 9 meter (inci pasang,cat,izin) Unit
11 Splitter 1:8 Unit 25 Tiang Besi 12 meter (inci pasang,cat,izin) Unit
12 Splitter 1:16 Unit 26 Transportasi Luat Kota utk 2 drum 400KM Lot
13 Joint Box 24 Core Unit 1 27 Jointing per core Core 6
14 ODF Rack Mounted 6 Core Unit 1 28 OTDR percore Core 2

APPROVED BY : CHECKED BY : SUBJECT : KONFIGURASI NETWORK

SUPERVISOR PEMBANGUNAN PROJECT TEAM LEADER PEMBANGUNAN LASTMILE


Drawing By : Rini Adetya Wulandari
REGIONAL JAKARTA BANTEN

Rahmat Fandi K

Agnes Pagris Siregar PT. INDONESIA COMNETS PLUS


PT. GERBANG SINERGI PRIMA
DOKUMENTASI INDOOR

JALUR BASEMENT

APPROVED BY : CHECKED BY : SUBJECT : DOKUMENTASI

SUPERVISOR PEMBANGUNAN PROJECT TEAM LEADER PEMBANGUNAN LASTMILE


Drawing By : Rini Adetya Wulandari
REGIONAL JAKARTA BANTEN

Rahmat Fandi K

Agnes Pagris Siregar PT. INDONESIA COMNETS PLUS


PT. GERBANG SINERGI PRIMA
DOKUMENTASI OUTDOOR

JB Tap Terdekat
JALUR OUTDOOR

ARAH INDOOR/BASEMENT

APPROVED BY : CHECKED BY : SUBJECT : DOKUMENTASI

SUPERVISOR PEMBANGUNAN PROJECT TEAM LEADER PEMBANGUNAN LASTMILE


Drawing By : Rini Adetya Wulandari
REGIONAL JAKARTA BANTEN

Rahmat Fandi K

Agnes Pagris Siregar PT. INDONESIA COMNETS PLUS


PT. GERBANG SINERGI PRIMA