Dolphins

Oil Terminal
Rotterdam-Europoort
JOB 0184 / 03.02 / TMH
General Description of the berthing CE being an eccentricity factor
dolphins equal to 0.7. It accounts for the
The oil terminal in the Benelux harbor position of the impact point on
of Rotterdam-Europoort was construc- Two outer dolphins: the ship at the moment when
ted to improve the supply of crude oil each consisting of four steel piles the vessel touches the frame
to the Shell refinery. having: structure.
· 1,620 mm OD
The dolphins were designed for an · 46.6 m (47.8 m) length CS being a “softness factor” assumed
envisaged water depth of 24.5 NAP · 53 mm wall thickness in the max. to be 0.9. It takes into considera-
and for vessels with a maximum capa- stressed section tion the reduction of the impact
city of 300,000 dwt. Such vessels have · 52 kg/mm2 min. yield strength for energy depending on the features
the following overall dimensions: steel grade D 53 applied in the max. of the vessel and fendering in
· length approx. 350 m stressed section reciprocal interaction.
· width approx. 55 m · 73.2 t (74.4 t) pile weight
· draft (loaded) approx. 22 m · 18.8 m driving depth Substituting above data in given for-
mula the required energy absorption
To protect the unloading platform two Two inner dolphins: capacity for a 300,000 dwt tanker
outer and two inner dolphins are pro- each consisting of three steel piles amounts to approx. 400 tm. For safety
vided consisting of 4 and 3 steel piles having: considerations, however, the dolphins
respectively; they are designed for an · 1,620 mm OD were oversized to stand up higher
energy absorption capacity of approx. · 43.3 m (45.5 m) length impact energies.
500 tm and 330 tm respectively. · 49 mm wall thickness in the max.
The tanker is tied up on six single-pile stressed section The outer dolphins are designed
mooring dolphins which are driven · 52 kg/mm2 min. yield strength for for an energy absorption capacity of
into the shore banks and designed to steel grade D 53 applied in the max. 455 tm and 745 tm when stressed to
withstand up to 150 t hawser force stressed section 80% and 100% of the yield strength
each. · 63.7 t (64.9 t) pile weight respectively. The maximum deflection
· 16.5 m driving depth of the outer dolphins at the level of
impact amounts to 1.72 m at 80%
Energy absorption capacity of the yield strength and 2.58 m at 100%
berthing dolphins: yield strength. The max. impact forces
The required energy absorption capa- for the outer dolphins are equal to
city in tm was calculated according to 529 and 654 t respectively. The spring
the formula: constant for the outer dolphins being
E = 1/2 · w/g · v · CM · CE · CS approx. 300 t/m.

where 2
r
The inner dolphins are designed
for an energy absorption capacity of
vr being the velocity of the ship 320 tm and 470 tm when stressed to
In the foreground, three-pile berthing dolphin perpendicular to the berthing 80% and 100% of the yield strength
in the background, four-pile berthing dolphin structure. It was assumed to be respectively. The max. deflection of the
15 cm/sec. for a 300,000 dwt inner dolphins at the level of impact
tanker. amounts to 1.70 m at 80% yield
strength for a maximum impact force
CM being a mass factor equal to of 378 t. Accordingly, both outer and
1.8. It takes into consideration inner dolphins reveal the same maxi-
the hydrodynamic and stopping mum deflection rate, thus meeting
effect which the wash and water the requirement on the inner dolphins
friction exerts on the ship. to attain their loading limit simulta-
neously with the outer dolphins.

2
The individual piles of each dolphin nections for cathodic protection,
are connected together by means of which are to be installed later.
box girders which transmit the impact
force uniformly on each pile. The box girders are painted in the
same manner as the dolphins. Merely
Torsion moments arising from eccen- the walking areas of the upper decks
tric impact are transmitted uniformly are provided with a non-skid Ferrox
on the single piles of the dolphins by layer.
means of torsion bars mounted at the
top of the box girders.

Construction of the four-pile outer berthing To manipulate the capstan and quick
dolphin release hook, a service platform is
connected to the box girders by tubu-
lar legs.

Hawser shield tubing prevent jamming


of hawsers on the protruding corners
of the fender panels.

The service platform is provided with


access walkways to the unloading
platform. The platform can also be
reached from the water by means of
a ladder.

Single-pile mooring dolphin


Six mooring dolphins designed
for 150 t hawser pull each (for an
admissible stress of 80% the yield
Design description of the strength)
superstructures of the berthing each dolphin having:
dolphins: · 2,020 OD
The impact force is exerted first on a · 24.5 m length
wide fender panel and then transmit- · 21 mm wall thickness in the max.
ted by means of a vertical positioned stressed section
hinge bearing to the box girder. The · 3.66 t/cm2 min. yield strength for
fender panel of the outer dolphins is steel grade X 52 to API Std 5 L
covered with square (30x30 cm) azobe applied in the max. stressed section
hardwood beams and has a total area
of 20 m2. At an impact force of 529 t Corrosion protection:
a surface pressure of 26 t/m2 is exer- All dolphins, except the upper section
ted on the hull of the vessel. of the berthing ones, are provided
with a zinc-dust primer covered with
Increasing the load up to 100% of the three top coats of tar epoxy-resin for
yield strength at an impact force of corrosion protection. The total coat Contractor:
654 t the surface pressure is according- thickness amounts to 300 µm. Amsterdamse Ballast,
ly increased to approx. 33 t/m2. Beton- en Waterbouw BV
The lower part of the dolphins (3 m Ballast-Nedam Huis,
The vertical hinge bearing ensures that below the mudline) remains unprotec- Amstelveen–Holland,
even for an oblique approach the fen- ted. The upper section of the berthing P.O.B. 500
der panel has full contact with the hull dolphins is protected against corrosion
of the vessel. Lord rubber elements by means of a fusion-bonded poly- Operator:
bring the fender panel back to its ori- ethylene coating (black). Moreover, Shell Nederland Raffinaderij BV,
ginal position as soon as the stress is the dolphins are provided with con- Rotterdam-Pernis
relieved.

3
Lay-out of tanker mooring berth
Shell/Rotterdam

4
5
Side view

6
Total view

7
Top view

8
9
Section A-D

10
11
Thyssen Mannesmann Handel GmbH
Hans-Günther-Sohl-Strasse 1
D-40235 Düsseldorf
Postal address:
P.O.Box 10 36 51 · D-40027 Düsseldorf
Tel.: (*49 211) 9 67-0
Fax: (*49 211) 9 67-78 06
e-mail: offshore@t-mh.com
www.thyssen-mannesmann-handel.de

You might also like