Chennai Metro Rail Limited has placed an order on the Alstom Transportation SA – Alstom Projects India
Limited Consortia for design, manufacture and supply as well as testing and commissioning of 42sets of
4-car train sets for the Metro Rail System of Chennai Metro Rail Limited.
The purpose of the audit is to assess the process capability of the manufacturer to design, manufacture,
inspect and test, pack and dispatch the specific material / component required by the customer.
The document covers the Audit of the manufacturing process, quality assurance process, general layout
of the factory, factory infrastructure, manpower and related systems and design capability
(iv) Details of certifications like ISO, Quality & Systems, Environmental systems etc., available with
the firm
Equity 862.06
4,251.79
Less :
3. General Information
i) Factory name:
- Testing Equipments -
- Others - 30.88
- Total - 2233.77
Engineers : 695
Others – 2
CCS-2 : 200*(690-1285)mm2
200*200mm2,260*200mm2
Steckel Mill
Edger
1000 2
Roughing Mill
6000 2
Sl. Name of testing equipment and testing devices Purpose of Use Quantity
No.
Process Flow
Chart.doc
Quality Assurance Process Flow Chart indicating check points and hold points and the
process flow loop for non-confirming products.
Quality Assurance Process Flow Chart indicating check points & hold points [attached as
per following file]:
Incoming Product
Inspection.doc
In its pursuit of environmental sustainability alongside its business development Jindal Stainless (Hisar)
Limited has setup norms beyond the statutory requirements and has put into place systems and
processes to continuously monitor the effectiveness of such initiatives. We firmly believe that Corporate
growth is strengthened by our efforts in the area of environment protection and making a greener
tomorrow. The Company goes beyond mere compliance legislation to create a healthy environment
both within and outside plants. Our operations have a fully equipped environment management
infrastructure in place. We use suitable processes and technology to make stainless steel without
adversely impacting the environment.
We have laid fresh thrust towards enhancing our resource efficiency in operations, especially for key
resources such as energy and water. Additionally we are adopting the '3-R' (reduce, reuse and recycle)
philosophy for all types of wastes towards prevention of pollution and dispose of inevitable wastes and
set, monitor, and review objectives and targets on an ongoing basis towards continuous improvement in
environmental performance and the overall environmental management system.
A state of the art environmental laboratory has been set up to conduct environmental
monitoring & analysis regularly.
Environmental Management System is in place to undertake prevention and control of all
sorts of pollution.
Efficient use of all key resources (water, energy, raw materials, etc) through its effective
management and technological measures are being practiced.
Continuous efforts are being made to ensure that all employees are environmentally
aware.
Air emissions are being treated with state-of-the-art facilities like Dust Extraction Systems,
bag filters, Dog House, etc.
Best housekeeping is maintained by having all concrete / tar roads, and use of pneumatic
vacuum road sweepers, water sprinkling through tankers, rotating water sprinklers,
dedicated housekeeping crew, etc.
We have a state of the art effluent treatment plants (ETP) designed by reputed suppliers.
Effluent is treated efficiently in effluent treatment plants and RO Plant. Entire Treated
waste water is being reused / utilized within the plant for various purposes.
Sewage Treatment Plant has been installed to treat domestic waste water to meet the
specified norms of HSPCB. The entire domestic waste water after treatment is being
completely reused in plantation which is an established practice world-wide.
Waste segregation is done at source.
Proper procedures / measures are undertaken to collect, segregate and store at a
designated locations for all types of wastes, making disciplined management of solid
Chennai Metro Rail Limited – Factory Audit Report Page no.
wastes.
Process dusts are recycled in the process in the form of briquettes.
No hazardous waste is presently generated from our Plant.
Used oil is being stored at designated location and is sold to CPCB approved recyclers.
If error in the instrument is more than the acceptance criteria, adjust the same to bring
within acceptance criteria and inform to Head of Department and concerned operation
in charge. Even after adjustment, the error remains more than acceptance criteria;
replace the instrument with pre-calibrated instrument.