Start Time End Time

Date of visit Visit Visit Concern person


Shahnawaz Nahiyoon [DCE (Prod]
Rameez Arshad Syed [SE(Prod)]
Gulji . [SE(Prod)]
8-Mar-21 9:15 AM 12:30 PM Yaqoob Ali [E(Prod)]
Abdul Rasheed [E(Prod)]

Shahnawaz Nahiyoon [DCE (Prod]

Rameez Arshad Syed [SE(Prod)]

9-Mar-21 8:30 AM 12:30 PM


Abdul Rasheed [E(Prod)]

Gulji . [SE(Prod)]

13-Mar-21 3:30 PM 4:15 PM Mr. Naimat Ullah & Mr. Yaqoob


Issue Discuss
NDT of tie-in Welds Joints
Calculation for quantity of unplanned release of gas
Tie-in Welds Joints design Set-in & Set-on
Discussion on fillet & but weld joints

Visited Sui # 95 feeder line construction site at back side of SFGCS,


attended meeting with HOD SFGCS (Mr. Naeem Qureshi), Mr. Irfan
along with Abdul Rasheed and Mr. Shahnawaz on Tie-in of Sui 95
feeder-line at SFGCS discharge line and fuel gas line from Sui 110 & 111
for SFGCS black shutdown. Requirement of MOC, HAZOP & PSI
(development of P&IDs) have been discussed.

Provided guidance and way forward for execution of pending action


items of PSM Sustainability Plan (2020-21) as Sui Production end.

Provided Training on Calculation of unplanned hydrocarbon released


quantity from Pinhole
Current status of the activity
Tie-in joints NDT pending
Gas released quantity not reported in VelocityEHS
Role of QHSE / Comments Issue raised Issue pending
Selection of NDT technique
Provide guidance for calculation of unplanned release of gas
Selection of Tier 1/2/3
Reason of
Issue solved pending jobs Date Solve Department

You might also like