DESIGN 

OF PILE FOUNDATION
A. Outline of Footing
Soil Depth (Sd)  = 700 mm
Pile Cap Thickness (H)  = 900 mm
Pile Cap Length (L)  = 3400 mm
Pile Cap Width (B)  = 2200 mm
Column Width (b)  = 500 mm
Column Length (l)  = 500 mm
Pile Length (Lpile)  = 20 m
Pile Spacing (Sx)  = 1200 mm
Pile Spacing (Sy)  = 1200 mm
Edge Spacing  = 500 mm
Number of Piles(Np)  = 7 pcs
Section Modulus about X (Spx)  = 4.2 m
Section Modulus about Z (Spz)  = 6m

Unit Weights:
γsoil = 18 kN/m
3

γconc = 25 kN/m
3

Foundation Weights:
Pile Cap Wt.  = 168.3 kN
Soil Wt.  = 91.098 kN
Total Foundation Wt. (Wfdn)  = 259.398 kN
Buoyant force (Bf)  = 0 kN

B. Allowable Values
Pile Allowable Compression Forces ‐ Permanent (Nallp) = 695 kN
Pile Allowable Compression Forces ‐Temporary (Nallt) = 695 kN
Pile Allowable Lateral Force ‐ Permanent (Hallp) = 67.5 kN
Pile Allowable Lateral Force ‐ Temporary(Hallt) = 67.5 kN
Pile bearing check ratio (vertical) = 0.75
Pile lateral check ratio = 0.7
Pile displacement check ratio = 0.7

C. Pile Check Formula
where:
Fy Wfdn Mx Mz Nmax : Maximum Pile Reaction
Nmax
NP Spx Spz Nmin : Minimum Pile Reaction
Hact : Actual Lateral Pile Reaction
Fy Wfdn Bf Mx Mz Np : Number of Piles
Nmin
NP Spx Spz Fy : Column Vertical Reaction
Mx = (Fy + Wfdn) x ep : Moment Due to Pile Eccentricity about X
𝐹 𝐹 Mz = (Fy + Wfdn) x ep : Moment Due to Pile Eccentricity about Z
Hact
𝑁 Spx : Section Modulus about X‐axis
Spz : Section Modulus about Z‐axis