You are on page 1of 3

NOTE:1000 RS REGISTRATION FEES

WE’LL PROVIDE TOPIC LIST FOR BELOW MENTIONED CATEGORIES

IMPORTANT NOTE: REGISTRATION FEES WILL BE INCLUSIVE OF TOTAL COSTING.

BE/DIPLOMA/ PROJECTS
DESIGN AND FABRICATION

DESIGN & OPTIMIZATION / VALIDATION / DEVELOPMENT / ANALYSIS (ANSYS SOFTWARE)

ME/M-TECH PROJECTS

 DESIGN AND ANALYSIS


 STATIC STRUCTURAL ANALYSIS
 STAEDY STATE THERMAL
 CFD (FLUENT)
 EXPLICT DYNAMICS
 MODAL (VIBRATIONS)
 VIBRATION
 COMPOSITE
 HEAT POWER /THERMAL
 PRODUCTION
1ST STAGE DATA (+30 % COSTING)

1. TITLE (EXAMPLE) BASED ON CATEGORY


 THEORY BASED (DESIGN & DEVELOPMENT/OPTIMIZATION/ANALYSIS OF XYZ….)
 FABRICATION BASED (DESIGN & FABRICATION OF XYZ…….)
2. AIM
 IN ONE OR TWO LINE ABOUT PROJECT. EXP; (TO EXTRACT THE PRESSURE ENERGY OF THE FLOWING
WATER FROM THE PIPES WITH THE APPLICATION OF N-PIPE TURBINE FOR LIGHTING PURPOSES.)
3. ABSTRACT
4. INTRODUCTION
 OVERVIEW
 SUMMERY
 ABOUT SYSTEM
 CLASSIFICATION
 TYPES
 ADVANTAGES
 DISADVANTAGES
 APPLICATION
 EFFECTS
5. LITERATURE REVIEW
 12-15 PAGES (WITH AUTHORED NAME, TITLE, PUBLISH DATE, JOURNAL & VOLUME)
6. PROBLEM STATEMENT

2ND STAGE DATA (+20% COSTING)

7. OBJECTIVE
8. SCOPE
9. ORGANIZATION DISASTERS
10. METHODOLOGY
11. COMPONENTS REQUIRED
 MECHANICAL & ELECTRONICS (BRIEF EXPLANATION ABOUT EACH & EVERY PART)
12. PROPOSED SYSTEM
 SCHEMATIC DIAGRAM
 WORKING PRINCIPLE
 BASIC DIAGRAM
 ADVANTAGES OF PROPOSED SYSTEM VS EXISTING SYSTEM
 CONSTRUCTION
13. CALCULATIONS
 STRUCTURE
 BEARING SELECTION
 GEAR TRANSMISSION RATIO
 SHAFT SELECTION
 ETC……. SO ON
14. DESIGN
 CATIA V5 INTRODUCTION
 USES
 TYPES OF DESIGN SOFTWARE
 ADVANTAGES OF CATIA VS OTHERS
 SUB PARTS IMAGES & FILE
 FINAL ASSEMBLY IMAGES & FILE
 2D DRAFTING WITH BASIC GD &T IMAGES & FILE
3RD STAGE DATA (+30% COSTING)

15. ANALYSIS IF REQUIRED


 IF ANY FORCES, SPRING, SHAFT OR HEAVY LOADS ARE ACTING ON THE SUPPORT
 WITH IMAGES & FILES
 MESHING SIZE, NODES, ELEMENTS, METHOD, FINISHING ETC.
 RESULTS IMAGES
 SIMULATION VIDEOS
16. MANUFACTURING PROCESS
17. BILL OF MATERIAL
18. PROPOSED PLANE OF PROJECT
19. ADVANTAGES & DISADVANTAGES OF OUR SYSTEM
20. RESULTS
21. CONCLUSION
22. FUTURE SCOPE
23. REFERENCES
WITH WORKING MODEL (+ 20% COSTING)

AND POWER POINT (PPT)


 SAME ABOVE DATA WITH LOTS OF IMAGES & DESCRIPTION SHOULD BE IN POINTS

TOTAL 100% COSTING @ FINAL DELIVERY TIME WITH COMPLETE DATA

You might also like